Search NASA⌕ Search

Engineering topics

Piekarz, H.

Publications and source records attributed to Piekarz, H..

Commissioning of the IOTA Proton Injector

The Proton Injector for the IOTA storage ring (IPI) is being constructed at the Fermilab Accelerator Science and Technology facility (FAST). It will be a machine capable of delivering 20 mA pulses of protons at 2.5 MeV. IPI will operate alongside the existing electron injector beamline to facilitate further beam physics research and the continued development of novel accelerator technologies at the IOTA ring. This report details the results of the initial commissioning of IPI and an overview of the upcoming experiments with intense proton beams at IOTA.

43 PARTICLE ACCELERATORS↗

Ionization Profile Monitors for the IOTA Proton Beam

Ionization profile monitors (IPMs) are widely used in accelerators for non-destructive and fast diagnostics of high energy particle beams. Two such monitors - one vertical and one horizontal - are being developed for installation in the IOTA storage ring at Fermilab. They will be used for turn-by-turn (microseconds scale) measurements of the 70 MeV/c IOTA proton beam sizes. In this paper we present the IPMs design (largely following the FNAL Booster IPMs which employ no external guiding magnetic fields), their mechanical, vacuum, and electric subsystems and DAQ, and discuss anticipated effects on the beams circulating in IOTA.

43 PARTICLE ACCELERATORS↗

Ionization Profile Monitors for the IOTA Proton Beam

Ionization profile monitors (IPMs) are widely used in accelerators for non-destructive and fast diagnostics of high energy particle beams. Two such monitors - one vertical and one horizontal - are being developed for installation in the IOTA storage ring at Fermilab. They will be used for turn-by-turn (microseconds scale) measurements of the 70 MeV/c IOTA proton beam sizes. In this paper we present the IPMs design (largely following the FNAL Booster IPMs which employ no external guiding magnetic fields), their mechanical, vacuum, and electric subsystems and DAQ, and discuss anticipated effects on the beams circulating in IOTA.

43 PARTICLE ACCELERATORS↗

Magnets for a Muon Collider—Needs and Plans

We describe the magnet challenges for a Muon Collider, an exciting option considered for the future of particle physics at the energy frontier. Starting from the comprehensive work performed by the US Muon Accelerator Program, we have reviewed the performance specifications dictated by beam physics and the operating conditions to satisfy the accelerator needs. Among the many magnets that make up a muon collider, we have identified four systems that represent well the envelope of challenges: the target and capture solenoid, the final cooling solenoid, the accelerator dipoles and the collider dipoles. These systems provide focus for the development of novel concepts, largely based on HTS for reasons of performance, cost and sustainability. After giving a consolidated overview of the needs for the magnet systems, we describe here the basic technology options considered, and the plan for design and development activities.

43 PARTICLE ACCELERATORS↗

Status of the IOTA proton injector

The IOTA Proton Injector (IPI), currently under installation at the Fermilab Accelerator Science and Technology facility (FAST), is a machine capable of delivering 20\,mA pulses of protons at 2.5\,MeV to the Integrable Optics Test Accelerator (IOTA) ring. First beam in the IPI beamline is anticipated in the first half of~2024, when it will operate alongside the existing electron injector beamline to facilitate further beam physics research and continued development of novel accelerator technologies at the IOTA ring. This report details the expected operational profile, known challenges, and the current state of installation.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Future high energy colliders and options for the U.S.

The United States has a rich history in high energy particle accelerators and colliders — both lepton and hadron machines, which have enabled several major discoveries in elementary particle physics. To ensure continued progress in the field, U.S. leadership as a key partner in building next generation collider facilities abroad is essential; also critically important is to prepare to host an energy frontier collider in the U.S. once the construction of the LBNF/DUNE project is completed. In this paper, we briefly discuss the ongoing and potential U.S. engagement in proposed collider projects abroad and present a number of future collider options we have studied for hosting an energy frontier collider in the U.S. Further, we also call for initiating an integrated national R&D program in the U.S. now, focused on future colliders.

43 PARTICLE ACCELERATORS↗

Status of the IOTA Proton Injector

The IOTA Proton Injector (IPI), currently under installation at the Fermilab Accelerator Science and Technology facility (FAST), is a machine capable of delivering 20 mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator (IOTA) ring. First beam in the IPI beamline is anticipated in the first half of 2024, when it will operate alongside the existing electron injector beamline to facilitate further beam physics research and continued development of novel accelerator technologies at the IOTA ring. This report details the expected operational profile, known challenges, and the current state of installation.

43 PARTICLE ACCELERATORS↗

IOTA Proton Injector Beamline Installation

The IOTA Proton Injector (IPI), currently under installation at the Fermilab Accelerator Science and Technology facility, is a beamline capable of delivering 20-mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator (IOTA) ring. First beam in the IPI beamline is anticipated in 2023, when it will operate alongside the existing electron injector beamline to facilitate further fundamental physics research and continued development of novel accelerator technologies in the IOTA ring. This report details the expected operational profile, known challenges, and the current state of installation.

43 PARTICLE ACCELERATORS↗