Search NASASearch

Engineering topics

Piland, William M.

Publications and source records attributed to Piland, William M..

Technology Requirements for Affordable Single-Stage Rocket Launch Vehicles

A number of manned Earth-to-orbit (ETO) vehicle options for replacing or complementing the current Space Transportation System are being examined under the Advanced Manned Launch System (AMLS) study. The introduction of a reusable single-stage vehicle (SSV) into the U.S. launch vehicle fleet early in the next century could greatly reduce ETO launch costs. As a part of the AMLS study, the conceptual design of an SSV using a wide variety of enhancing technologies has recently been completed and is described in this paper. This paper also identifies the major enabling and enhancing technologies for a reusable rocket-powered SSV and provides examples of the mission payoff potential of a variety of important technologies. This paper also discusses the impact of technology advancements on vehicle margins, complexity, and risk, all of which influence the total system cost.

Stanley, Douglas O.

Improving The Discipline of Cost Estimation and Analysis

The need to improve the quality and accuracy of cost estimates of proposed new aerospace systems has been widely recognized. The industry has done the best job of maintaining related capability with improvements in estimation methods and giving appropriate priority to the hiring and training of qualified analysts. Some parts of Government, and National Aeronautics and Space Administration (NASA) in particular, continue to need major improvements in this area. Recently, NASA recognized that its cost estimation and analysis capabilities had eroded to the point that the ability to provide timely, reliable estimates was impacting the confidence in planning many program activities. As a result, this year the Agency established a lead role for cost estimation and analysis. The Independent Program Assessment Office located at the Langley Research Center was given this responsibility. This paper presents the plans for the newly established role. Described is how the Independent Program Assessment Office, working with all NASA Centers, NASA Headquarters, other Government agencies, and industry, is focused on creating cost estimation and analysis as a professional discipline that will be recognized equally with the technical disciplines needed to design new space and aeronautics activities. Investments in selected, new analysis tools, creating advanced training opportunities for analysts, and developing career paths for future analysts engaged in the discipline are all elements of the plan. Plans also include increasing the human resources available to conduct independent cost analysis of Agency programs during their formulation, to improve near-term capability to conduct economic cost-benefit assessments, to support NASA management's decision process, and to provide cost analysis results emphasizing "full-cost" and "full-life cycle" considerations. The Agency cost analysis improvement plan has been approved for implementation starting this calendar year. Adequate financial and human resources are being made available to accomplish the goals of this important effort, and all indications are that NASA's cost estimation and analysis core competencies will be substantially improved within the foreseeable future.

Piland, William M.

Improving the Discipline of Cost Estimation and Analysis

The need to improve the quality and accuracy of cost estimates of proposed new aerospace systems has been widely recognized. The industry has done the best job of maintaining related capability with improvements in estimation methods and giving appropriate priority to the hiring and training of qualified analysts. Some parts of Government, and National Aeronautics and Space Administration (NASA) in particular, continue to need major improvements in this area. Recently, NASA recognized that its cost estimation and analysis capabilities had eroded to the point that the ability to provide timely, reliable estimates was impacting the confidence in planning man), program activities. As a result, this year the Agency established a lead role for cost estimation and analysis. The Independent Program Assessment Office located at the Langley Research Center was given this responsibility.

Piland, William M.

Aerospace Systems Design in NASA's Collaborative Engineering Environment

Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g., manufacturing and systems operation). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often lead to the inability of assessing critical programmatic and technical issues (e.g., cost, risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographical distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across Agency.

Monell, Donald W.

Aerospace Systems Design in NASA's Collaborative Engineering Environment

Past designs of complex aerospace systems involved an environment consisting of collocated design teams with project managers, technical discipline experts, and other experts (e.g. manufacturing and systems operations). These experts were generally qualified only on the basis of past design experience and typically had access to a limited set of integrated analysis tools. These environments provided less than desirable design fidelity, often lead to the inability of assessing critical programmatic and technical issues (e.g., cost risk, technical impacts), and generally derived a design that was not necessarily optimized across the entire system. The continually changing, modern aerospace industry demands systems design processes that involve the best talent available (no matter where it resides) and access to the best design and analysis tools. A solution to these demands involves a design environment referred to as collaborative engineering. The collaborative engineering environment evolving within the National Aeronautics and Space Administration (NASA) is a capability that enables the Agency's engineering infrastructure to interact and use the best state-of-the-art tools and data across organizational boundaries. Using collaborative engineering, the collocated team is replaced with an interactive team structure where the team members are geographically distributed and the best engineering talent can be applied to the design effort regardless of physical location. In addition, a more efficient, higher quality design product is delivered by bringing together the best engineering talent with more up-to-date design and analysis tools. These tools are focused on interactive, multidisciplinary design and analysis with emphasis on the complete life cycle of the system, and they include nontraditional, integrated tools for life cycle cost estimation and risk assessment. NASA has made substantial progress during the last two years in developing a collaborative engineering environment. NASA is planning to use this collaborative engineering infrastructure to provide better aerospace systems life cycle design and analysis, which includes analytical assessment of the technical and programmatic aspects of a system from "cradle to grave." This paper describes the recent NASA developments in the area of collaborative engineering, the benefits (realized and anticipated) of using the developed capability, and the long-term plans for implementing this capability across the Agency.

Monell, Donald W.

Commercialization of the Space Frontier

This paper discusses the current outlook for space business, how growing space business will improve the quality of life for all, and identified strategies for better relating international space research, technology, and space system operations to commercial interests in space. By drawing on recent assessments of the future potential for business in space, opportunities will be defined for encouraging the growth of business uses of space and regaining the public's awareness and support for expanding the space frontier.

Piland, William M.

Recent NASA studies of reusable launch vehicles

Issues and studies involved in the process for developing earth to orbit (ETO) space transportation options are listed. Space transportation options must consider not only future national needs, but how such options best fit into an overall space transportation architecture. Using total architecture life cycle cost, for example, as an optimization factor may suggest different vehicle options for various payload classes and missions. NASA studies of vehicle options over the past several years have examined these relationships. Air and ground launch concepts and airbreathing systems are covered.

Piland, William M.

21st century space transportation system design approach - HL-20 personnel launch system

This article provides an introduction to and overview of the research that was conducted on the HL-20 lifting body. The concept has been defined as an option for a personnel launch system (PLS) that is intended to carry six to eight Space Station Freedom crew persons. In this role the HL-20 will complement the Space Shuttle operation and ensure the ability to transport people to and from Earth orbit after the year 2000. The research covers a broad range of disciplines, including aerodynamics, aerodynamic heating and thermal protection systems, structural design, subsystem definition, trajectory and guidance system development for entry and abort, production and operations, and human factors. This article also presents the lifting-body heritage, design features of the concept, and HL-20/PLS mission requirements.

Stone, Howard W.

Technology requirements for affordable single-stage rocket launch vehicles

A number of manned Earth-to-orbit (ETO) vehicle options for replacing or complementing the current Space Transportation System are being examined under the Advanced Manned Launch System (AMLS) study. The introduction of a reusable single-stage vehicle (SSV) into the U.S. launch vehicle fleet early in the next century could greatly reduce ETO launch costs. As a part of the AMLS study, the conceptual design of an SSV using a wide variety of enhancing technologies has recently been completed and is described in this paper. This paper also identifies the major enabling and enhancing technologies for a reusable rocket-powered SSV and provides examples of the mission payoff potential of a variety of important technologies. This paper also discusses the impact of technology advancements on vehicle margins, complexity, and risk, all of which influence the total system cost.

Stanley, Douglas O.

The HL-20 lifting-body personnel launch system

The HL-20 early lifting-body personnel launch system (PSL) research, expected PSL mission requirements, the HL-20 concept design status, and those features which enhance aerodynamic and aerothermodynamic performance, operation, efficiency, maintainability, reliability, and crew safety are described. Results of the HL-20 PLS research to date show that the concept has definite advantages for efficiently satisfying future needs for assured manned access to space. The vehicle is designed with operational efficiency, low life-cycle costs, reliability, and safety as the primary criteria. It is shown that the HL-20 PLS can be developed and put into operation in the same timeframe that the Space Station Freedom is deployed.

Stone, Howard W.

Aerothermodynamics for United States advanced programs

A series of graphics relating to aerothermodynamics is presented. They following topics are shown: space transportation architecture options and systems, vehicle shapes and design goals, aerothermodynamics (including hypersonic entry), computational fluid dynamics, ground based testing, aeroassist environment, and airbreathing propulsion.

Piland, William M.

The Personnel Launch System

NASA has begun to study candidate vehicles for manned access to space in support of the Space Station or other future missions requiring on-demand transportation of people to and from earth orbit. One such system, which would be used to complement the present Shuttle or an upgraded version, is the Personnel Launch System (PLS), which is envisioned as a reusable priority vehicle to place people and small payloads into orbit using an experimental launch vehicle. The design of the PLS is based on a Space Station crew changeout requirement whereby eight passengers and two crew members are flown to the station and a like number are returned within a 72 hour mission duration. Experimental and computational aerothermodynamic heating studies have been conducted using a new two-color thermographic technique that involved coating the model with a phosphor that radiates at varying color intensities as a function of temperature when illuminated with UV light. A full-scale model, the HL-20, has been produced and will be used for man-machine research. Three launch vehicle concepts are being considered, a Titan IV, the Advanced Launch System, and a Shuttle equipped with liquid rocket boosters.

Piland, William M.

Personnel Launch System definition

A lifting-body Personnel Launch System (PLS) is defined for assured manned access to space for future U.S. space missions. The reusable craft described is configured for reliable and safe operations, maintainability, affordability, and improved operability, and could reduce life-cycle costs associated with placing personnel into orbit. Flight simulations show the PLS to be a very flyable vehicle with very little control and propellant expenditure required during entry. The attention to crew safety has resulted in the design of a system that provides protection for the crew throughout the mission profile. However, a new operations philosophy for manned space vehicles must be adopted to fully achieve low-cost, manned earth-to-orbit transportation.

Piland, William M.

Advanced manned launch system comparisons

Studies of Advanced Manned Launch Systems (AMLS) at the NASA Langley Research Center are examining all-rocket and air-breathing/rocket options for the next-generation U.S. manned space transportation system. Under review are vehicle concepts that have a goal of reliable, safe, cost-effective manned access to space beyond the year 2000. Technology levels, system complexities, and operations approaches are shown to be factors which significantly affect comparisons of the various concepts. Low life-cycle cost and low cost per flight are considered to be major discriminators in selecting a launch system to satisfy future needs.

Piland, William M.

Technology challenges for the National Aero-Space Plane

The National Aerospace Plane (NASP) will require an exceptionally high degree of integration between propulsion and aerodynamic configuration, in order to achieve the requisite specific impulse and low structural weight. This is to be achieved through the use of forebody shock compression and afterbody exhaust expansion. Attention is presently given to the materials and structural concepts required for the realization of these NASP airframe functions, in view of the exceptionally high aerothermodynamic loads that will be experienced at hypersonic speeds. Active cooling will have to be used in certain critical airframe and propulsion components. CFD characterizations of these processes must be carefully developed and fully validated.

Piland, William M.

National Aero-Space Plane

An account is given of the technology development management objectives thus far planned for the DOD/NASA National Aero-Space Plane (NASP). The technology required by NASP will first be developed in ground-based facilities and then integrated during the design and construction of the X-30 experimental aircraft. Five airframe and three powerplant manufacturers are currently engaged in an 18-month effort encompassing design studies and tradeoff analyses. The first flight of the X-30 is scheduled for early 1993.

Piland, William M.