Search NASA⌕ Search

Engineering topics

Pinayev, I

Publications and source records attributed to Pinayev, I.

At least 19 records

Status of Proof-of-principle Experiment for Coherent Electron Cooling

Coherent electron cooling (CEC) has a potential to significantly boost luminosity of high-energy, high-intensity hadron colliders. To verify the concept we conduct proof-of-the-principle experiment at RHIC. In this paper, we describe the current experimental setup to be installed into 2 o'clock RHIC interaction regions. We present current design, status of equipment acquisition and estimates for the expected beam parameters.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Status of proof-of-principle experiment for coherent electron cooling

Coherent electron cooling (CEC) has a potential to significantly boost luminosity of high-energy, high-intensity hadron colliders. To verify the concept we conduct proof-of-the-principle experiment at RHIC. In this paper, we describe the current experimental setup to be installed into 2 o'clock RHIC interaction regions. We present current design, status of equipment acquisition and estimates for the expected beam parameters. We use a dogleg to merge the electron and ion beams. The ions 'imprint' their distribution into the electron beam via a space charge density modulation. The modulation is amplified in an FEL comprised of a 7-m long helical wiggler. The ions are co-propagating with electron beam through the FEL. The ion's average velocity is matched to the group velocity of the wave-packet of e-beam density modulation in the FEL. A three-pole wiggler at the exit of the FEL tune the phase of the wave-packet so the ion with the central energy experience the maximum of the e-beam density modulation, where electric field is zero. The time-of-flight dependence on ion's provides for the electrical field caused by the density modulation to reduce energy spread of the ion beam. The used electron beam is bent off the ion path and damped.

43 PARTICLE ACCELERATORS↗

Coherent electron cooling proof of principle instrumentation design

The goal of the Coherent Electron Cooling Proof-of-Principle (CeC PoP) experiment being designed at RHIC is to demonstrate longitudinal (energy spread) cooling before the expected CD-2 for eRHIC. The scope of the experiment is to longitudinally cool a single bunch of 40 GeV/u gold ions in RHIC. This paper will describe the instrumentation systems proposed to meet the diagnostics challenges. These include measurements of beam intensity, emittance, energy spread, bunch length, position, orbit stability, and transverse and temporal alignment of electron and ion beams.

43 PARTICLE ACCELERATORS↗

Coherent electron cooling demonstration experiment

Coherent electron cooling (CEC) has a potential to significantly boost luminosity of high-energy, high-intensity hadron-hadron and electron-hadron colliders. In a CEC system, a hadron beam interacts with a cooling electron beam. A perturbation of the electron density caused by ions is amplified and fed back to the ions to reduce the energy spread and the emittance of the ion beam. To demonstrate the feasibility of CEC we propose a proof-of-principle experiment at RHIC using SRF linac. In this paper, we describe the setup for CeC installed into one of RHIC's interaction regions. We present results of analytical estimates and results of initial simulations of cooling a gold-ion beam at 40 GeV/u energy via CeC. We plan to complete the program in five years. During first two years we will build coherent electron cooler in IP2 of RHIC. In parallel we will develop complete package of computer simulation tools for the start-to-end simulation predicting exact performance of a CeC. The later activity will be the core of Tech X involvement into the project. We will use these tools to predict the performance of our CeC device. The experimental demonstration of the CeC will be undertaken in years three to five of the project. The goal of this experiment is to demonstrate the cooling of ion beam and to compare its measured performance with predictions made by us prior to the experiments.

43 PARTICLE ACCELERATORS↗

Proof-of-principle experiment for FEL-based coherent electron cooling

Coherent electron cooling (CEC) has a potential to significantly boost luminosity of high-energy, high-intensity hadron-hadron and electron-hadron colliders. In a CEC system, a hadron beam interacts with a cooling electron beam. A perturbation of the electron density caused by ions is amplified and fed back to the ions to reduce the energy spread and the emittance of the ion beam. To demonstrate the feasibility of CEC we propose a proof-of-principle experiment at RHIC using SRF linac. In this paper, we describe the setup for CeC installed into one of RHIC's interaction regions. We present results of analytical estimates and results of initial simulations of cooling a gold-ion beam at 40 GeV/u energy via CeC. We plan to complete the program in five years. During first two years we will build coherent electron cooler in IP2 of RHIC. In parallel we will develop complete package of computer simulation tools for the start-to-end simulation predicting exact performance of a CeC. The later activity will be the core of Tech X involvement into the project. We will use these tools to predict the performance of our CeC device. The experimental demonstration of the CeC will be undertaken in years three to five of the project. The goal of this experiment is to demonstrate the cooling of ion beam and to compare its measured performance with predictions made by us prior to the experiments.

43 PARTICLE ACCELERATORS↗

NSLS-II INJECTION STRAIGHT DIAGNOSTICS

The ultra-bright light source being developed by the NSLS-II project will utilize top-up injection and fine tuning of the injection process is mandatory. In this paper we present the diagnostics installed in the injection straight. Its use for commissioning and tuning of the injection cycle is also described. The NSLS-II storage ring will utilize a 9.3 meter long injection straight section shown in Fig. 1. Injection will be preformed with two septa (one pulsed, one DC) and four kickers. The stored beam will be shifted towards the pulsed septum up to IS mm and the nominal distance between centers of the injected and the bumped beam is 9.5mm. The NSLS-II beam position monitors will have turn-by-turn and first-turn capabilities and will be used for the commissioning and tuning the injection process. However, there are three additional BPMs and two beam intercepting OTR screens (flags) installed in the injection straight.

43 PARTICLE ACCELERATORS↗

COMPENSATION OF FAST KICKER ROLLS WITH SKEW QUADRUPOLES

The development of the third generation light sources lead to the implementation of the top-up operation, when injection occurs while users collect data. The beam excursions due to the non-closure of the injection bump can spoil the data and need to be suppressed. In the horizontal plane compensation can be achieved by adjusting timing and kick amplitudes. The rolls of the kicker magnets create non-closure in the vertical plane and usually there is no means for correction. In the paper we describe proposed compensation scheme utilizing two skew quadrupoles placed inside the injection bump. The third generation light sources implement top-up operation firstly introduced at Advanced Photon Source. In this mode the circulating beam current is supported near constant by frequent injection of small charge, while photon beam is delivered for users. The beam perturbations caused by the mismatched injection bump can provide undesired noise in the user data. Usually the injection trigger is distributed to the users end stations so that those affected would be able to blank data acquisition. Nevertheless, as good operational practice such transients should be suppressed as much as possible. In the horizontal plane (which is commonly used for injection) one can adjust individual kicker strength as well as trigger delay while observing motion of the stored beam centroid. In the vertical plane such means are unavailable in the most cases. The possible solutions include dedicated weak vertical kickers and motorized adjustment of the roll angle of the injection kickers. Both abovementioned approaches are expensive and can significantly deteriorate reliability. We suggest two employ two skew quadrupoles (to correct both angle and position) placed inside the injection bump. In this case the beam position itself serves as measure of the kicker strength (assuming that kickers are well matched) and vertical kicks from the skew quadrupoles will be self synchronized with injection bump. In this paper we will consider the case when injection hardware (kickers and septa) are located in the same straight. Such an approach simplifies consideration but it can be generalized.

43 PARTICLE ACCELERATORS↗

PERFORMANCE OF THE DIAGNOSTICS FOR NSLS-II LINAC COMMISSIONING

The National Synchrotron Light Source II (NSLS-II) is a state of the art 3-GeV third generation light source currently under construction at Brookhaven National Laboratory. The NSLS-II injection system consists of a 200 MeV linac, a 3-GeV booster synchrotron and associated transfer lines. The transfer lines not only provide a means to deliver the beam from one machine to another, they also provide a suite of diagnostics and utilities to measure the properties of the beam to be delivered. In this paper we discuss the suite of diagnostics that will be used to commission the NSLS-II linac and measure the beam properties. The linac to booster transfer line can measure the linac emittance with a three screens measurement or a quadrupole scan. Energy and energy spread are measured in a dispersive section. Total charge and charge uniformity are measured with wall current monitors in the linac and transformers in the transfer line. We show that the performance of the diagnostics in the transfer line will be sufficient to ensure the linac meets its specifications and provides a means of trouble shooting and studying the linac in future operation.

200 MeV linac↗

PROGRESS WITH NSLS-II INJECTION STRAIGHT SECTION DESIGN

The NSLS-II injection straight section (SR) consists of pulsed and DC bumps, septa system, beam trajectory correction and diagnostics systems. In this paper we discuss overall injection straight layout, preliminary element designs, specifications for the pulsed and DC magnets and their power supplies, vacuum devices and chambers and diagnostics devices. Prior to selecting the current 'conventional' design of the injection straight section we analyzed an option of injection via pulsed multipole pioneered at PF-AR. We found that this promising approach was not suited to the NSLS-II storage ring optics, since it would require a impractically compact arrangement of the injection straight section components and a complex modification of the transport line optics due to the strong focusing of the injected beam passing off the pulsed multipole axis. In addition, the requirement for a small injection transient of the stored beam orbit severely constrains the vertical alignment tolerance of the pulsed multipole. The design of the NSLS-II injection straight section is now completed with exception of transition chamber details, which will be adjusted to accommodate the actual layouts of the pulsed magnets.

43 PARTICLE ACCELERATORS↗

NSLS-II RF BEAM POSITION MONITOR

An internal R&D program has been undertaken at BNL to develop a sub-micron RF Beam Position Monitor (BPM) for the NSLS-II 3rd generation light source that is currently under construction. The BPM R&D program started in August 2009. Successful beam tests were conducted 15 months from the start of the program. The NSLS-II RF BPM has been designed to meet all requirements for the NSLS-II Injection system and Storage Ring. Housing of the RF BPM's in +-0.1 C thermally controlled racks provide sub-micron stabilization without active correction. An active pilot-tone has been incorporated to aid long-term (8hr min) stabilization to 200nm RMS. The development of a sub-micron BPM for the NSLS-II has successfully demonstrated performance and stability. Pilot Tone calibration combiner and RF synthesizer has been implemented and algorithm development is underway. The program is currently on schedule to start production development of 60 Injection BPM's starting in the Fall of 2011. The production of {approx}250 Storage Ring BPM's will overlap the Injection schedule.

43 PARTICLE ACCELERATORS↗

NSLS-II Beam Diagnostics Overview

A new 3rd generation light source (NSLS-II) is in the early stages of construction at Brookhaven National Laboratory. The NSLS-II facility will provide ultra high brightness and flux with exceptional beam stability. It presents several challenges for diagnostics and instrumentation, related to the extremely small emittance. In this paper, we present an overview of all planned instrumentation systems, results from research and development activities; and then focus on other challenging aspects.

43 PARTICLE ACCELERATORS↗

Development of High Stability Supports for NSLS-II RF BPMS

The NSLS-II Light Source being built at Brookhaven National Laboratory is expected to provide submicron stability of the electron orbit in the storage ring in order to fully utilize the very small emittances of the electron beam. This requires high stability supports for BPM pickup electrodes located near insertion device sources. Here we provide details for the design and development of these supports as well as measurement of thermal and vibrational stability of a prototype support.

43 PARTICLE ACCELERATORS↗

Evaluation of Heat Dissipation in the BPM Buttons

Growth of circulating current in the storage rings drastically increases heating of the beam position monitor (BPM) buttons due to the induced trapped modes is drastically increasing. Excessive heating can lead to the errors in the measuring of beam position or even catastrophic failures of the pick-up assembly. In this paper we present calculations of heat generated in the button for different geometries and materials. The obtained results are used for the optimization of the NSLS-II BPM buttons design.

43 PARTICLE ACCELERATORS↗

Preliminary Design of Pinhole camera for NSLS-II Project.

The NSLS-II Light Source being built at Brookhaven National Laboratory is expected to provide very small emittances and electron beam sizes. High resolution imaging systems are required in order to provide robust measurements. The pinhole camera will utilize 6-fold magnification with a pinhole placed inside a crotch absorber. The pinhole is protected from high power synchrotron radiation with a filter made of refractory metal. In this paper we provide resolution analyses, heat load calculations, and optimization details for the NSLS-II pinhole camera, including beamline design.

43 PARTICLE ACCELERATORS↗

Comparison of RF BPM Receivers for NSLS-II Project

The NSLS-II Light Source being built at Brookhaven National Laboratory requires submicron stability of the electron orbit in the storage ring in order to utilize fully very small emittances and electron beam sizes. This sets high stability requirements for beam position monitors and a program has been initiated for the purpose of characterizing RF beam position monitor (BPM) receivers in use at other light sources. Present state-of-the-art performance will be contrasted with more recently available technologies.

43 PARTICLE ACCELERATORS↗

BPM Button Optimization to Minimize Distortion Due to Trapped Mode Heating

The outer circumference of a BPM button and the inner circumference of the button housing comprise a transmission line. This transmission line typically presents an impedance of a few tens of ohms to the beam, and couples very weakly to the 50 ohm coaxial transmission line that comprises the signal path out of the button. The modes which are consequently excited and trapped often have quality factors of several hundred, permitting resonant excitation by the beam. The thermal distortion resulting from trapped mode heating is potentially problematic for achieving the high precision beam position measurements needed to provide the sub-micron beam position stability required by light source users. We present a button design that has been optimized via material selection and component geometry to minimize both the trapped mode heating and the resulting thermal distortion.

24 POWER TRANSMISSION AND DISTRIBUTION↗