Search NASA⌕ Search

Engineering topics

Pischalnikov, Yu.

Publications and source records attributed to Pischalnikov, Yu..

Accelerated Lifetime Test of the SRF Dressed Cavity/Tuner System for LCLS II HE Project

The off-frequency detune method is being considered for application in the LCLS-II-HE superconducting linac to produce multi-energy electron beams for supporting multiple undulator lines simultaneously [1]. Design of the tuner has been changed to deliver roughly 3 times larger frequency tuning range. Working requirements for off-frequency operation (OFO) state that cavities be tuned at least twice a month. This specification requires the in-crease of the tuner longevity by 20 times compared with LCLS-II demands. Accelerated longevity tests of the LCLS-II HE dressed cavity with tuner were conducted at FNAL's HTS. Detail analysis of wearing and impacts on performances of the tuner's piezo and stepper motor actuators will be presented. Additionally, results of longevity testing of the dressed cavity bellow, when cooled down to 2 K and compressed by 2.6 mm for roughly 2000 cycles, will be presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

2.6GHz SRF Cavity Tuner for DarkPhoton Experiment [Poster]

There are several experiments ongoing at FNAL that require frequency tuning of bare (undressed) SRF cavities when they are cooled down and operated inside dilution refrigerator. One of these experiments is for the search of dark photons using a 2.6 GHz SRF cavity. The limited heat capacity of a dilution refrigerator prevents using a stepper motor for an SRF cavity tuner. The tuner for the 2.6 GHz SRF cavity will be equipped with encapsulated piezo actuators that will deliver long and short-range frequency tuning. Design of the tuner and results of the testing cavity/tuner system at ambient environment and at T = 77 K will be presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗