Search NASA⌕ Search

Engineering topics

Plastun, A. S.

Publications and source records attributed to Plastun, A. S..

Accelerator commissioning and rare isotope identification at the Facility for Rare Isotope Beams

In 2008, Michigan State University was selected to establish the Facility for Rare Isotope Beams (FRIB). Construction of the FRIB accelerator was completed in January 2022. Phased accelerator commissioning with heavy ion beams started in 2017 with the normal-conducting ion source and radio-frequency quadrupole. In April 2021, the full FRIB driver linear accelerator (linac) was commissioned, with heavy ion beams accelerated to energies above 200 MeV/nucleon by 324 superconducting radiofrequency (SRF) resonators operating at 2 K and 4 K with liquid-helium cooling. Further, in preparation for high-power operation, a liquid lithium charge stripper was commissioned with heavy ion beams up to uranium-238, followed by the simultaneous acceleration of multiple-charge-state heavy ion beams to energies above 200 MeV/nucleon. In December 2021, selenium-84 was produced with the FRIB target using a krypton-86 primary beam, demonstrating FRIB’s capability for scientific discovery.

07 ISOTOPE AND RADIATION SOURCES↗

First Simultaneous Acceleration of Multiple Charge States of Heavy Ion Beams in a Large-Scale Superconducting Linear Accelerator

Experimental studies of the simultaneous acceleration of three-charge-state 129 Xe 49+,50+,51+ beam from 17 to 180 MeV/nucleon in a superconducting linear accelerator are presented. The beam parameters for each individual- and multiple-charge-state beam were measured and compared with the particle tracking simulations. Detailed measurements were performed to characterize the multiple-charge-state beam’s recombination after a second-order achromat and isopath 180° bending system. As a result of the recombination of three charge states in the six-dimensional phase space, the xenon beam intensity was increased by 2.5-fold compared to the single-charge-state beam. Lastly, the results presented in the Letter fully validate the possibility to produce and utilize high-quality multiple-charge-state heavy-ion beams in a large-scale superconducting linac to increase the available beam power on an isotope production target.

43 PARTICLE ACCELERATORS↗

Heavy ion beam physics at Facility for Rare Isotope Beams

The Facility for Rare Isotope Beams (FRIB) will be the world's premier rare-isotope beam facility. Experiments with the majority (~80%) of the isotope predicted to exist will become available. The FRIB facility is based on a superconducting (SC) heavy ion linac with output energy above 200 MeV/u for any ions at beam power of 400 kW. FRIB includes a target facility for in-flight production of rare isotopes. A three-stage fragment separator will be used to prepare fast rare isotope beams with high-purity for nuclear physics experiments. The installation work of the accelerator and experimental systems is approaching completion and multi-stage beam commissioning activities started in summer 2017 with expected project completion in early 2022. In conclusion, the commencement of operation for users' experiments is planned immediately following the project completion.

43 PARTICLE ACCELERATORS↗

RF deflecting cavity for fast radioactive ion beams

Abstract The Facility for Rare Isotope Beams (FRIB) will be a new scientific user facility that produces rare-isotope beams for experiments from the fragmentation of heavy ions at energies of 100–200 MeV/u. During the projectile fragmentation, the rare isotope of interest is produced along with many contaminants that need to be removed before the beam reaches detectors. At FRIB, this is accomplished with a magnetic projectile fragment separator. However, to achieve higher beam purity, in particular for proton-rich rare isotopes, additional purification is necessary. RadiaBeam in collaboration with Michigan State University (MSU) has designed a 20.125 MHz radiofrequency (RF) fragment separator capable of producing a 4 MV kick with 18 cm aperture in order to remove contaminant isotopes based on their time of flight. In this paper, we will discuss the RF and engineering design considerations of this separator cavity.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗