Operational results of simultaneous four-beam delivery at Jefferson Lab
A concept for simultaneous beam delivery to all four CEBAF experimental halls from a single injector and a single main accelerator for the 12 GeV era was proposed in 2012. The original 12 GeV beam delivery plan was for a maximum of three experimental halls at a time as in the 6 GeV era. Therefore, the new concept increases the potential beam time for the experiments up to 33%. This change required minimal modifications to the existing machine. The modifications were mainly timing and pattern changes to the beams in the injector, adding a fourth laser to the photo-cathode gun, and the addition of new RF separators to the highest pass of CEBAF. These changes are now all in place and, for the first time, the full system is operating, producing four simultaneous beams through the accelerator to four different destina-tions. In this paper, in addition to presenting the results of the full system commissioning, we will discuss im-portant details about the new configuration plus some of our operational challenges.