Search NASA⌕ Search

Engineering topics

Pless, Shanti

Publications and source records attributed to Pless, Shanti.

At least 19 records

Understanding the Challenges of Financing Modular Construction: A Case Study for Prospective Multifamily Units

Compared to traditional site build, modular construction can significantly shorten construction schedules and speed income generation. Modular construction may also reduce construction costs. Yet access to commercial financing remains one of the most significant barriers to modular construction. Materials must be purchased, and production lines reconfigured for each project months ahead of fabrication. Materials alone can be 60% or more of the total cost of production. As a result, manufacturers require large upfront deposits—often 30% or more of the off-site contract. In addition, the capital-intensive nature of modular construction requires frequent progress payments for manufacturers to maintain cash flow. For those lenders willing to fund modular projects, many require the developer to share more of the risk. This may include the developer paying for line reservation fees and material deposits 3–6 months prior to production. Because these are unsecured loans, interest rates may be higher and loan amounts lower. As suppliers, modular manufacturers discourage retainage. Together, these and other factors may contribute to higher equity requirements for the developer—particularly at the beginning of the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A New State of the Art: Zero Energy Modular Multifamily Construction

In 2020, the U.S. Department of Energy's Building Technologies Office (BTO) launched the Advanced Building Construction (ABC) Initiative. This initiative aimed to integrate energy efficiency into high-production construction practices. One focus area of the initiative is off-site construction, an approach that may achieve scalable, efficient, and high-performing construction buildings through process standardization. This report presents the findings and recommendations from our ABC Initiative project: A New State of the Art: Zero-Energy Modular Multifamily Construction System. The objectives of the BTO-funded project are to: 1) Achieve energy performance 50% better than the 2018 International Energy Conservation Code (IECC). 2) Achieve this level of energy performance at no additional cost VEIC worked with Louisiana State University (LSU), National Renewal Energy Lab (NREL), [the project team], and industry partners at the Mod Coach, KBS, and Solar Home Factory to identify and analyze multifamily business designs and modular construction practices. These designs and processes hold the promise of achieving the goals set out by the DOE.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Building Construction (ABC) Research Opportunities Report: Industrializing Construction to Decarbonize Buildings

The DOE Building Technologies Office generally seeks to develop, demonstrate, and accelerate the adoption of cost-effective technologies, techniques, and tools in support of an equitable transition to a decarbonized building stock and energy system by 2050. This ABC Innovations Roadmap specifically focuses on and prioritizes innovations that support the industrialization of whole building retrofits and rapid growth of efficient new construction. The content relates to the integration of technologies and industrialization of processes associated with building construction and renovation. The ABC Innovations Roadmap cross-applies innovations in both the new and existing building sectors with a focus on widescale applicability. Installation flexibility is key to commoditizing solutions that are applicable for a wide variety of buildings (e.g., different building types, vintages, architectural details, and system configurations) and to help simplify decarbonization processes for the workforce.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Building Construction (ABC) Research Opportunities Report: Industrializing Construction to Decarbonize Buildings

The U.S. building stock is responsible for 75% of total U.S. electricity use, 40% of energy use, and 35% of CO 2 emissions. To meet bold national climate change goals, the U.S. must decarbonize the building stock by 2050. However, today’s practices to build or renovate buildings to low-carbon, high-performance levels are generally labor intensive, disruptive, and too costly to quickly scale in the U.S. To retrofit 80% of the U.S. building stock in the U.S. by 2050, the retrofit rate will need to increase by about 15 times for residential buildings and two times for commercial buildings. Additionally, there is a major housing deficit in this country where nearly 600,000 people lack adequate or stable shelter, and the pace of construction is not keeping up with the growing demand. New, more industrialized, replicable, and technologically driven approaches to renovation and new building construction are imperative to help meet such significant national needs and achieve the necessary speed and scale to meet national building decarbonization goals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Bottleneck Detection in Modular Construction Factories Using Computer Vision

The construction industry is increasingly adopting off-site and modular construction methods due to the advantages offered in terms of safety, quality, and productivity for construction projects. Despite the advantages promised by this method of construction, modular construction factories still rely on manually-intensive work, which can lead to highly variable cycle times. As a result, these factories experience bottlenecks in production that can reduce productivity and cause delays to modular integrated construction projects. To remedy this effect, computer vision-based methods have been proposed to monitor the progress of work in modular construction factories. However, these methods fail to account for changes in the appearance of the modular units during production, they are difficult to adapt to other stations and factories, and they require a significant amount of annotation effort. Due to these drawbacks, this paper proposes a computer vision-based progress monitoring method that is easy to adapt to different stations and factories and relies only on two image annotations per station. In doing so, the Scale-invariant feature transform (SIFT) method is used to identify the presence of modular units at workstations, and the Mask R-CNN deep learning-based method is used to identify active workstations. This information was synthesized using a near real-time data-driven bottleneck identification method suited for assembly lines in modular construction factories. This framework was successfully validated using 420 h of surveillance videos of a production line in a modular construction factory in the U.S., providing 96% accuracy in identifying the occupancy of the workstations and an F-1 Score of 89% in identifying the state of each station on the production line. The extracted active and inactive durations were successfully used via a data-driven bottleneck detection method to detect bottleneck stations inside a modular construction factory. The implementation of this method in factories can lead to continuous and comprehensive monitoring of the production line and prevent delays by timely identification of bottlenecks.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Contech to Accelerate Cleantech: Seeding Emerging Innovation Programs for Construction Productivity and Energy Efficiency Integration; Preprint

Investments in U.S.-based start-ups that focus on advanced building construction technologies to increase construction productivity (contech) surged to approximately $3.1 billion in 2018 (as per Crunchbase data). More recently, emerging programs by government funding agencies, philanthropic foundations, and venture capitalists have been instrumental in supporting contech start-ups for innovations that increase productivity of energy efficiency integration and accelerate clean energy technologies (cleantech) for the buildings sector. These programs include R&D support and funding mechanisms for contech and cleantech. Traditionally, contech and cleantech are considered as two different innovation ecosystems. To enhance and scale up energy efficiency in buildings, creative programs that bring together contech and cleantech are critical. This paper provides a landscape assessment of the "contech-for-cleantech" innovation ecosystem in the U.S. and its impact in accelerating technology readiness and the development pipeline of "contech-for-cleantech". Technologies highlighted are robotics for retrofits, prefabrication of energy-efficient products, and advanced manufacturing of low-carbon net-zero buildings construction. Programs discussed include those led by (1) government funding agencies: American-Made Challenges with prizes like E-ROBOT for retrofits with robotics, (2) philanthropic foundations: Wells Fargo Innovation Incubator (IN2) that includes focus on energy efficiency and prefabrication, and (3) venture capitalists: Shadow Ventures Green Building Accelerator program which provides funding support to start-ups with ambitious plans for decarbonizing the built environment. This paper will also expand upon robust processes and criteria involved in judging and down-selection of start-ups through vetting and feedback from national lab researchers and industry experts in both cleantech and contech.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Energy in Modular (EMOD) Buildings Method: A Guide to Energy-Efficient Design for Industrialized Construction of Modular Buildings

Industrialized construction has immense potential to address the growing need globally to build and upgrade the building stock to be affordable, energy-efficient, and resilient. It can also help achieve the United States' goal of a 50% reduction in U.S. greenhouse gas (GHG) emissions by 2030. Despite this potential, and the ever-increasing push for electrification and decarbonization of households in the United States, industrialized construction has not yet been leveraged specifically to help address these challenges and accelerate the pathway to meet these goals. The National Renewable Energy Laboratory (NREL) aims to claim this missed opportunity by focusing on delivering affordable, grid-efficient net-zero energy (NZE) modular buildings for underserved communities to ensure an equitable transition to the future of clean energy, accelerate decarbonization of the built environment, and support the development of a high-productivity construction and energy efficiency workforce. The Energy in Modular (EMOD) method is our approach to designing, producing, and delivering affordable, net-zero energy, low-carbon, and healthier buildings at scale. The following energy efficiency strategies are part of the scope of this guide: envelope thermal control, envelope infiltration control, mechanical, electrical, and plumbing systems, smart controls, and solar plus storage. We draw synergies between design for manufacturing and assembly, process optimization, retrofit technologies, and digitization. Our goal is to influence the improvement and production of buildings to increase performance, enhance energy efficiency, and reduce GHG emissions. This guide documents the research and development efforts initiated by a set of design objectives to "modularize" a set of energy efficiency and low-carbon strategies into a housing unit while preserving and enhancing energy efficiency benefits and decarbonization pathways. This guide is intended to serve as a framework for housing developers, housing agencies, architects, energy experts, and process engineers or factory operator personnel who are critical to today's modular builder teams. This guide focuses on specific energy efficiency strategies, decarbonization pathways, and associated processes as part of NREL's research efforts. Stakeholders may substitute other means, methods, and technologies for the ones evaluated in this study.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Immersive Industrialized Construction Environments for Energy Efficiency Construction Workforce

The National Renewable Energy Laboratory is actively developing and testing Immersive Industrialized Construction Environments (IICE) for construction automation and worker-machine interaction to investigate possible solutions and increase workforce productivity. At full scope and matured functionality, IICE allows us to accelerate the development of and better explore industrialized construction approaches such as prefabrication. IICE also enables wider adoption of energy-efficient products and Industry 4.0 construction automation through worker-machine interaction pilots. Industry 4.0 and industrialized construction approaches can encourage workforce specialization in energy efficiency construction, address the lack of multi-skilled workers, and increase workforce productivity with construction automation. However, recent attempts to integrate these concepts with the industry have only been moderately successful. To address this, focusing the pedagogy on using a digital twin, its digital models, and virtual reality could make the experience of continuing education on construction automation more affordable, accessible, scalable, immersive, and safer, and could greatly improve the efficiency and robustness of the building and construction industry. IICE accurately represents the realities of construction uncertainties without having to create full scale physical prototypes of machines. In this paper, we address the following research question: How can a digital twin and its models in virtual reality enhance the learning experience and productivity of energy efficiency construction workers to gain the skills in operating Industry 4.0 components such as construction automation and handling energy-efficient products in industrialized construction factories and on-site? We introduce original research on developing IICE and present preliminary findings from time and motion pilot studies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

How Can Construction Process Simulation Modeling Aid the Integration of Lean Principles in the Factory-Built Housing Industry?

New and existing factories that produce and deliver factory-built housing can benefit from construction process simulation modeling to explore the integration of Lean principles in their operations. Construction process simulation modeling provides digital or virtual recreations of the real-world factory environments to visualize, quantify, analyze, and optimize their underlying behavior, including factory productivity, material flow, labor dynamics, bottlenecks, and work scope. One of the key benefits of process simulation modeling is the ability to create and compare "what-if" scenarios, including integrating Lean principles such as reducing waste (for example, transportation, waiting), line balancing, and just-in-time concepts. In general, three process simulation methods are widely used: discrete event simulation (DES), agentbased modeling (ABM), and system dynamics (SD). Myriad process simulation software also is available, but depending on the industry, complexity of the system, and purposes of the simulation, some software might be more appropriate. Similar to how computer-aided design (CAD) software such as AutoCAD and Rhinoceros enable building design of modular or factory-built housing, process simulation modeling software such as jStrobe, ProModel, and AnyLogic can enable factory design of new and existing factories to deliver modular affordable housing at scale, as opposed to traditional site-built construction. Software with DES capabilities can help generate a process model that is a logical representation of resources and activities in a factory. Software with CAD-DES integration can leverage product-process data integration to help spatially visualize a DES model of the factory in the CAD environment. Software with multimethod simulation capabilities, widely used in the manufacturing industry, brings together DES, ABM, and SD in a single platform that allows visualization, quantification, analyses, and optimization at varying data fidelities. Near-real-time data from an existing factory can be directly plugged into multimethod simulation software so that the construction process simulation model is a near-accurate representation of the real-world factory conditions. This report provides insights into the use of simulation as an aid to integrate Lean concepts in factories, including guidelines for selecting the appropriate process simulation modeling method and software. These insights have been developed as part of ongoing process simulation modeling research, development, and demonstration projects at the U.S. Department of Housing and Urban Development, the U.S. Department of Energy, and the National Renewable Energy Laboratory focused on how process simulation models can enable better integration of resilience, energy efficiency, and low-carbon design strategies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Decarbonization During Predevelopment of Modular Building Solutions

Off-site construction methods offer the opportunity to compress costs of net-zero energy (NZE) housing using the advantages of mass production. There has been limited investigation on trade-offs between site-built and industrialized construction from the perspective of reducing the incremental cost of NZE strategies and reducing greenhouse gas emissions during embodied and operational stages. Blokable, LLC, a vertically integrated modular builder, wanted to know how the learning curves of mass production would help them decarbonize their existing modular housing prototype at a relative cost advantage. The method developed for this question looked at the life cycle assessment of an individual apartment and used learning-curve efficiencies to approximate the relative advantage of construction-at-scale. Greenhouse gas emissions were quantified by a learning-affected, whole-life carbon emissions model and demonstrated a path to a 60% reduction of whole-life CO2-equivalent in the 2030 production year. The resultant roadmap considers a best-first approach to decarbonizing a modular building product line, and the method can be replicated for other modular builders.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Energy Approaches for Mixed-Use Developments in the Front Range Urban Corridor

The primary objective of the document is to present example technical approaches and strategies that planners and developers can reference for all-electric mixed-use developments in the Rocky Mountain Front Range urban corridor that are considering advanced energy performance goals such as high levels of energy efficiency and renewable integration. The strategies are tailored toward the vision for a zero energy, all-electric, district thermal system-connected starter district. In this example, on-site solar generation is emphasized as a strategy that can be combined with electrical and thermal energy storage for enhanced community resilience and demand flexibility. Opportunities for utilizing or adapting these strategies include: sharing with vertical developers for potential integration of strategies into vertical design guidelines; incorporation into Owner Project Requirements (OPRs); providing example strategies to design teams as a starting point for design; informing structure of agenda for a building design charrette; comparing building designs to example strategies at various points in the design process to evaluate design progression. While the technical strategies outlined in this document can help inform the development of guidelines for projects in the Front Range urban corridor, this document does not set requirements for any rating, certification, program, or policy.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Guide to Energy Master Planning of High-Performance Districts and Communities

This guide was developed with partners throughout the United States to demonstrate how implementing district-scale high-performance strategies can be successful and scalable approaches to achieving deep energy savings that increase affordability, improve resilience, reduce emissions, and foster economic development. This document serves as a framework for districts, campuses, and communities, illustrating an iterative process of building support for, planning, and implementing high-performance districts by engaging stakeholders, setting aggressive energy goals, completing technical and financial planning, and implementing a high-performance energy master plan. The information in this guide is based on a 3-year U.S. Department of Energy Zero Energy District Accelerator and a range of real-world examples of emerging high-performance districts. It is particularly useful for architects, planners, engineers, local government agencies, and real estate developers in the early phases of planning a district with high-performance or other deep energy goals. For the purposes of this guide, a high-performance district is a multibuilding development that achieves aggressive energy and related goals such as zero energy, carbon neutrality, sustainability, ultra-efficiency, etc. High-performance districts optimize energy efficiency to reduce energy loads and use renewable energy resources to meet the remaining loads whenever possible. The Energy Independence and Security Act of 2007 defines a high-performance building as “a building that integrates and optimizes on a life cycle basis all major high-performance attributes, including energy conservation, environment, safety, security, durability, accessibility, cost-benefit, productivity, sustainability, functionality, and operational considerations.” High-performance districts are collections of such buildings that take advantage of the synergies available when energy consumption and production are considered at a district level rather than one building at a time.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation of smart charging for electric vehicle-to-building integration: A case study

Higher electric vehicle (EV) adoption will stress the importance of demand flexibility to achieve more economic, efficient, and reliable grid operation. Charging technologies will be paramount in shifting temporally to better fit the variable generation of wind and solar. As such, analysis is warranted on the benefits of EV charge scheduling with respect to installation cost, operation cost, difficulty of implementation, and grid flexibility. We tackle this by analyzing the cost savings of implementing an EV charge scheduling infrastructure to reduce demand charges and installation costs. In this paper, we analyze a case study for operation of 16 level 2 chargers and 1 fast charger for two different building types. We then evaluate various test phases for controlling building and charging loads using an adaptive charging network (ACN) algorithm to characterize the ACN’s potential to reduce overall project cost.

30 DIRECT ENERGY CONVERSION↗

Peña Station NEXT Energy District Master Plan (Cooperative Research and Development Final Report, CRADA Number CRD-17-681)

The objective of the project is to work in close collaboration with Panasonic, Xcel Energy (Public Service), and their partners L.C. Fulenwider, and Denver International Airport to examine different design and technology options in creating an energy master plan for the 400 acre Pena Station NEXT district in Denver, Colorado. To accomplish this, NREL will conduct a solar power/battery storage/grid integration study using the OpenDSS platform linked to UrbanOPT software.

25 ENERGY STORAGE↗

Toward a subhourly net zero energy district design through integrated building and distribution system modeling

A modeling framework integrating both building energy modeling and power system modeling is introduced for the design of net zero energy (NZE) districts for the simultaneous selection of both demand-side efficiency measures and supply-side generation technologies. A novel district control scheme is proposed for pursuing NZE on a subhourly basis while mitigating potential grid impacts such as power backfeeding and voltage violations. As a case study, Pena Station NEXT, a new 100-building, mixed-use district on a 1200-node distribution feeder in Denver, Colorado, is modeled in the integrated framework. An exhaustive scenario analysis is conducted for sizing the district's distributed energy resources, considering multiple objectives such as capital cost, net energy import, and equipment violations. Here, when trying to achieve annual NZE, the district incurs frequent operating violations, and achieving NZE on a 15-min basis is also limited by seasonal fluctuations in photovoltaic output, illustrating the need for diverse generation or seasonal storage. As a practical compromise, both annual and 15-min district import can be reduced by ~78% without significant violations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Accelerate Performance (Final Technical Report)

Encouraging commercial building owners to set measurable energy goals before design begins can drive design and contractor teams to develop innovative energy efficiency solutions within conventional building budgets. A federal building owner piloted this technique and created a large-scale zero-energy office building on a budget comparable to local market construction rates. The successes and lessons learned from this performance-based project formed the basis of Accelerate Performance, an expanded program using utilities as the primary outreach channel to replicate the approach. Four utilities partnered with Slipstream, a not-for-profit program implementer, to develop pilot incentive offerings to focus building owners on the whole building rather than on individual building components and systems. The original performance-based procurement process and its successful implementation in a federal building project informed all these efforts. The experiences and lessons learned in different new construction markets led to further process adaptations as well as the development of templates and tools to streamline outreach and technical support efforts. The approach can be adapted to utility new construction programs and is a powerful tool for engaging many building owners early in the project planning process as they make critical energy decisions that impact the performance of the building. The approach has led to real energy savings in building projects by encouraging cost-effective, low-risk, and creative design solutions. The performance-based approach was tested in a variety of applications including different building types and owner types, with many owners adopting performance-based procurement techniques, some with variations, but all maintaining the same core principles. Over the course of the project, nearly 100 building projects were impacted and additional projects will continue to be supported through ongoing program offerings with three leading utilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated distribution system and urban district planning with high renewable penetrations

Recent efforts to reduce energy consumption and greenhouse gas emissions have resulted in the development of sustainable, smart districts with highly energy efficient buildings, renewable distributed energy resources (DERs), and support for alternative modes of transportation. However, there is typically little if any coordination between the district developers and the local utility. Most attention is paid to the district's annual net load and generation without considering their instantaneous imbalance or the connecting network's state. This presents an opportunity to learn lessons from the design of distribution feeders for districts characterized by low loads and high penetrations of DERs that can be applied to the distribution grid at large. The aim of this overview is to summarize current practices in sustainable district planning as well as advances in modeling and design tools for incorporating the power distribution system into the district planning process. Recent developments in the modeling and optimization of district power systems, including their coordination with multi-energy systems and the impact of high penetration levels of renewable energy, are introduced. Sustainable districts in England and Japan are reviewed as case studies to illustrate the extent to which distribution system planning has been considered in practice. Finally, newly developed building-to-grid modeling tools that can facilitate coordinated district and power system design with utility involvement are introduced, along with suggestions for future research directions.

24 POWER TRANSMISSION AND DISTRIBUTION↗