Search NASA⌕ Search

Engineering topics

Podobedov, B.

Publications and source records attributed to Podobedov, B..

At least 19 records

Advancements in Accelerator Physics and System Developments for the EIC

The development and enhancement of the Electron-Ion Collider (EIC) are founded on extensive research and development efforts aimed at achieving rigorous performance goals. This document outlines the crucial research and development (R&D) efforts that underpin the various systems and components of the EIC, including the polarized electron source and linear accelerator (linac) systems. Achieving the collider’s operational benchmarks relies on meticulously enhancing these components to optimize performance.

43 PARTICLE ACCELERATORS↗

The EIC accelerator: design highlights and project status

The design of the electron-ion collider (EIC) at Brookhaven National Laboratory is well underway, aiming at a peak electron-proton luminosity of 10e+34 cm^-1·sec^-1. This high luminosity, the wide center-of-mass energy range from 29 to 141 GeV (e-p) and the high level of polarization require innovative solutions to maximize the performance of the machine, which makes the EIC one of the most challenging accelerator projects to date. The complexity of the EIC will be discussed, and the project status and plans will be presented.

43 PARTICLE ACCELERATORS↗

Recent Beam Stability Analysis for the EIC

This document summarizes work done in WBS 6.02.02 during FY23. Additional details can be found in the EIC overview paper presented at IPAC’23 [1], and the references therein. Progress has been made in the ESR and HSR lattice design, dynamic aperture optimization, and the RCS lattice design. The impedance and Collective effects are progressing and include the impedance optimization process of the vacuum systems for RCS, HSR, and ESR; collective effects studies; collective effects and beam-beam interaction; coupled bunch instabilities and the crab cavities; low-level RF feedback system design and beam-ion instability. The reversed phasing RF system has been numerically studied for the ESR to mitigate Robinson instability and demonstrate reliable stable beam operation. Various codes, including C++, SPACE [2], ELEGANT [3], and Mbtrack2 [4] have been employed to benchmark the results. The simulation of HSR bunch splitting with beam loading has been performed at 275 GeV energy. The evaluation of Beam Position Monitors aimed to validate their expected performance, with the primary objective being to verify their accuracy. Calculations of Electron Polarization in the ESR, RCS, and HSR are showing good progress. In the RCS, preliminary studies indicate excellent polarization transmission over intrinsic spin resonances, achieving over 90% transmission with improved performance compared to the previous lattice. Preliminary simulations in the ESR indicate encouraging results in minimizing depolarization and improving equilibrium polarization.

43 PARTICLE ACCELERATORS↗

Electron-Ion Collider Design Status

The Electron-Ion Collider (EIC) is being designed for construction at Brookhaven National Laboratory. Activities have been focused on beam-beam simulations, polarization studies, and beam dynamics, as well as on maturing the layout and lattice design of the constituent accelerators and the interaction region. The latest design advances will be presented.

43 PARTICLE ACCELERATORS↗

Design Status Update of the Electron-Ion Collider

The design of the electron-ion collider EIC to be constructed at Brookhaven National Laboratory has been continuously evolving towards a realistic and robust design that meets all the requirements set forth by the nuclear physics community in the White Paper. Over the past year activities have been focused on maturing the design, and on developing alternatives to mitigate risk. These include improvements of the interaction region design as well as modifications of the hadron ring vacuum system to accommodate the high average and peak beam currents. Beam dynamics studies have been performed to determine and optimize the dynamic aperture in the two collider rings and the beam-beam performance. We will present the EIC design with a focus on recent developments.

43 PARTICLE ACCELERATORS↗

NSLS-II Beam Loss Control and Monitoring System

One of the most challenging issues for accelerator operations deals with why and where the beam was lost. This is a major concern for radiation protection at facilities with a large user base, since uncontrolled beam losses could result in high radiation levels to occupied areas. For NSLS-II the tunnel radiation shield wall has increased attenuation over two lattice cells after the injection region, to shield for the possibility of higher injection losses during injection. This raised the concern over exceeding the radiation exposure limits in the lesser shielded region, if similar losses could occur elsewhere. To address this issue a beam loss control system was designed to capture most beam losses in the more heavily shielded (injection) region. A beam loss monitor system was designed to verify the fraction of the beam lost in that region, in order to insure lower levels of exposure around the rest of the ring. The design of these beam loss control and monitoring systems and their operational experience are presented here.

43 PARTICLE ACCELERATORS↗

A Storage Ring Experiment to Detect a Proton Electric Dipole Moment

A new experiment is described to detect a permanent electric dipole moment of the proton with a sensitivity of 10−29 e ⋅ cm by using polarized “magic” momentum 0.7 GeV/c protons in an all-electric storage ring. Systematic errors relevant to the experiment are discussed and techniques to address them are presented. The measurement is sensitive to new physics beyond the standard model at the scale of 3000 TeV.

43 PARTICLE ACCELERATORS↗

NSLS-II commissioning and operation

The National Synchrotron Light Source II at Brookhaven National Lab is a third-generation synchrotron radiation facility that has been commissioned in 2014. The facility is based on a 3 GeV electron storage ring, which will circulate 500 mA of beam current at 1 nm rad horizontal emittance. The storage ring is 792 meters in circumference and will accommodate more than 60 beamlines in the final built-out. The beamline sources range from insertion-devices located in straight sections, bending magnets or three-pole-wigglers configured in multiple branches. The NSLS-II storage ring commissioning was successfully completed in July 2014 and the facility delivered the first user light on October 23, 2014. Currently the storage ring reached 300 mA beam current and achieved 1 nm rad of horizontal emittance with 3 sets of Damping Wigglers. At this point six NSLS-II project beamlines are routinely taking photons with beam current at 150 mA. This paper reviews the NSLS-II accelerator design and commissioning experience.

43 PARTICLE ACCELERATORS↗

Emittance and lifetime measurement with damping wigglers

National Synchrotron Light Source II (NSLS-II) is a new third-generation storage ring light source at Brookhaven National Laboratory. The storage ring design calls for small horizontal emittance (<1 nm-rad) and diffraction-limited vertical emittance at 12 keV (8 pm-rad). Achieving low value of the beam size will enable novel user experiments with nm-range spatial and meV-energy resolution. The high-brightness NSLS-II lattice has been realized by implementing 30-cell double bend achromatic cells producing the horizontal emittance of 2 nm rad and then halving it further by using several Damping Wigglers (DWs). This paper is focused on characterization of the DW effects in the storage ring performance, namely, on reduction of the beam emittance, and corresponding changes in the energy spread and beam lifetime. The relevant beam parameters have been measured by the X-ray pinhole camera, beam position monitors, beam filling pattern monitor, and current transformers. In this paper, we compare the measured results of the beam performance with analytic estimates for the complement of the 3 DWs installed at the NSLS-II.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Considerations for NSLS-II Synchrotron Radiation Protection When Operating Damping Wigglers at Low Machine Energy

The NSLS-II storage ring vacuum chamber, including frontends (FE) and beamlines (BL), is protected from possible damage from synchrotron radiation (SR) emitted from insertion devices (IDs) by a dedicated active interlock system (AIS). The system monitors electron beam position and angle and triggers a beam dump if the beam orbit is outside of the active interlock envelope (AIE). The AIE was calculated under the assumptions of 3 GeV beam energy and ID gaps set to their minimum operating values (i.e. “fully closed”). Recently it was proposed to perform machine studies that would ramp the stored beam energy significantly below the nominal operational value of 3 GeV. These studies may potentially include the use of NSLS-II damping wigglers (DWs) for electron beam emittance reduction and control.

43 PARTICLE ACCELERATORS↗

NSLS-II injector commissioning and initial operation

The injector for the National Synchrotron Light Source II (NSLS-II) storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle in a train of bunches up to 300 ns long. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC, this has proven to be more than sufficient for storage ring commissioning and operation. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of linac and booster operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed.

43 PARTICLE ACCELERATORS↗