Planning Roadmap for DER Integration in India: Industry Best Practices and Resource Guide

Ensuring safe, reliable, cost-effective DER integration at scale requires holistic planning, broad stakeholder engagement, and should address key development areas such as standards adoption, equipment testing and certification, interoperability and cybersecurity, interconnection procedures, and advanced forecasting and DER management. Each of these areas currently represent significant challenges for utilities, regulators, OEMs, developers, and even consumers worldwide. India has already seen significant growth of DERs and has announced targets for substantial growth yet to come, with the potential for DERs to make up a non-negligible portion of the country's overall generation capacity. As such, it is of critical importance that Indian stakeholders consider the potential impacts of wide-spread adoption of DERs and take preemptive action related to the five development areas listed here, among others. India should consider strategies including the adoption of key DER standards related to interconnection, testing, and cybersecurity; enabling effective and secure communication channels for DER interoperability; testing and certifying DER equipment in accredited testing laboratories; building robust, streamlined interconnection procedures; and revamping legacy system planning structures to incorporate DERs in a holistic planning framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection of Distributed Energy Resources in the Indian Context: IEEE 1547-2018 Adaptation for Locally-Appropriate Grid Code Development

The rapid growth of distributed energy resources (DERs) in India and ambitious renewable energy goals set forth by the Indian government have created the need for appropriate distribution interconnection standards to ensure continued system stability, reliability, and resilience. Existing DER interconnection codes in India, at the time of publishing this report, lack many of the critical grid support functionalities for DERs which may protect bulk system stability, such as event ride-through provisions, frequency droop control, or appropriate trip thresholds given the increasing importance of distributed generation. The formal adoption of IEEE 1547-2018 by the Bureau of Indian Standards (BIS) marks a significant step towards achieving appropriate interconnection of DERs, though the implementation of such a standard must be accompanied with careful consideration of the current codes, regulations, and operation of the Indian power system. Studies on the performance of the functionalities within 1547-2018, which properly incorporate local operating conditions, can inform decisions related to the adoption and adaptation of the clauses present in the standard. This report outlines several of these key considerations for stakeholders and provides analyses illustrating the performance of grid support functionalities on typical Indian distribution feeders.

1547↗

Prefeasibility Analysis of Behind-the-Meter Distributed Energy Resources in Highland Park, MI: Highland Park Pathways to Power [Slides]

Through the Communities LEAP (Local Energy Action Program) Pilot, the National Renewable Energy Laboratory (NREL) engaged the Highland Park Stakeholder Coalition to scope four technical assistance work areas to address their energy needs and goals. This slide deck addresses the highlighted tasks under work area "B" related to policy analysis, due diligence, and case studies for removing barriers and providing best practices for local clean energy development. NREL used the REopt platform to evaluate the techno-economic potential of adding solar PV, electric storage, and/or diesel generators at several locations in Highland Park, Michigan: a typical residential and commercial building in Highland Park, the Earnest T. Ford Recreation Center, and the Parker Village Microgrid. The analysis goals focused on the ability of solar PV, electric storage, and/or diesel generators to reduce electricity costs and improve site resilience.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution Grid Impact Study in Highland Park, Michigan: Understanding Rooftop Solar, Behind-the-Meter Energy Storage, Electric Vehicle Charging, and Building Electrification [Slides]

Through the Communities LEAP (Local Energy Action Program) Pilot, the National Renewable Energy Laboratory (NREL) engaged the Highland Park Stakeholder Coalition to scope four technical assistance work areas to address their energy needs and goals. This slide deck addresses the highlighted tasks under work area "B" related to policy analysis, due diligence, and case studies for removing barriers and providing best practices for local clean energy development. Highland Park community members face frequent, long-duration power interruptions due largely to the aging distribution system serving the area and the legacy design standards used in its construction. While degrading physical infrastructure such as poles, crossarms, and transformers can result in this substandard reliability, another notable characteristic of this legacy system is the lower, 4.8 kV, voltage class. This is a legacy construction standard which many utilities, DTE included, are phasing out in favor of higher, 15 or 25 kV, voltage classes instead. The existing 4.8 kV distribution system serving Highland Park may limit significant adoptions of clean-energy technologies like high percentages of building electrification or electric vehicle adoption. The following analysis seeks to quantify these limitations under a variety of clean-energy technology adoption scenarios. It compares the overall system risks of the present system to those of a hypothetical, upgraded 13.2 kV system, using NREL-developed risk metrics and offers upgrade cost considerations. The legacy 4.8 kV voltage class serving Highland park is not, as we have modeled it, a major limitation to the widespread adoption of cost-optimal rooftop solar and/or behind-the-meter energy storage. Within our modeling framework, these technologies namely impact secondary, low-voltage assets, which may be remedied without the need for a system-wide upgrade to a 13.2 kV voltage class. Our model of the current 4.8kV system indicates it is not capable of supporting community-wide electrification efforts. Widespread building electrification, and the resulting large increase in wintertime load, dramatically increases the prevalence of voltage violations and thermal overloading on the current 4.8 kV distribution system. These impacts illustrate the need for system-wide upgrades to a 13.2 kV voltage class to accommodate these technologies. Low to Moderate DER adoption does not adversely impact the grid but does improve undervoltage and asset overloading issues. However, these benefits are insufficient to defer grid upgrades. Higher DER penetration is shown to increase overvoltage and asset overloading in future electrification scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Duke Energy’s Integrated System and Operations Planning: A comparative analysis of integrated planning practices

Lawrence Berkeley National Laboratory and the National Renewable Energy Laboratory provided technical assistance to the South Carolina Office of Regulatory Staff to examine how Duke Energy’s Integrated System Operations Planning (ISOP) framework interacts with other electricity planning processes in South Carolina. While this report was prepared for the South Carolina ORS, the information contained herein may be useful to audiences in other states who are interested in IDP, including public utility commissions, state energy offices, other state agencies, utilities, and stakeholders. The report discusses how to access the ISOP process diagram created for the report, provides observations about Duke Energy’s ISOP from our interviews and review of publicly available materials; and assesses ISOP, based on best practices for integrated distribution planning.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗