In 2008, Michigan State University was selected to establish the Facility for Rare Isotope Beams (FRIB). Construction of the FRIB accelerator was completed in January 2022. Phased accelerator commissioning with heavy ion beams started in 2017 with the normal-conducting ion source and radio-frequency quadrupole. In April 2021, the full FRIB driver linear accelerator (linac) was commissioned, with heavy ion beams accelerated to energies above 200 MeV/nucleon by 324 superconducting radiofrequency (SRF) resonators operating at 2 K and 4 K with liquid-helium cooling. Further, in preparation for high-power operation, a liquid lithium charge stripper was commissioned with heavy ion beams up to uranium-238, followed by the simultaneous acceleration of multiple-charge-state heavy ion beams to energies above 200 MeV/nucleon. In December 2021, selenium-84 was produced with the FRIB target using a krypton-86 primary beam, demonstrating FRIB’s capability for scientific discovery.

07 ISOTOPE AND RADIATION SOURCES↗

Commissioning Status of the Linac for the Facility for Rare Isotope Beams

The Facility for Rare Isotope Beams will be completed in late 2021. Here, we report here on the current efforts to commission the first stages of the 200-MeV/u superconducting, continuous wave heavy-ion linac. The statuses of the cryogenic plant and its distribution system, the accelerator cryomodule commissioning and operations, the ion source and front end transport development, the radio-frequency quadrupole commissioning, and then beam dynamics development to support high-power operation are reviewed. Plans for commissioning the remainder of the linac systems are presented.

43 PARTICLE ACCELERATORS↗

Advances of the FRIB project

The Facility for Rare Isotope Beams (FRIB) Project has entered the phase of beam commissioning starting from the room-temperature front end and the superconducting linac segment of first 15 cryomodules. With the newly commissioned helium refrigeration system supplying 4.5K liquid helium to the quarter-wave resonators and solenoids, the FRIB accelerator team achieved the sectional key performance parameters as designed ahead of schedule accelerating heavy ion beams above 20MeV/u energy. Thus, FRIB accelerator becomes world’s highest-energy heavy ion linear accelerator. We also validated machine protection and personnel protection systems that will be crucial to the next phase of commissioning. FRIB is on track towards a national user facility at the power frontier with a beam power two orders of magnitude higher than operating heavy ion facilities. Here, this paper summarizes the status of accelerator design, technology development, construction, commissioning as well as path to operations and upgrades.

43 PARTICLE ACCELERATORS↗

Progress towards the Facility for Rare Isotope Beams

Muon-based facilities offer a unique potential to provide capabilities at both the Intensity Frontier with Neutrino Factories and the Energy Frontier with Muon Colliders ranging from the Higgs energy to the multi-TeV energy range. They rely on novel technology with challenging parameters, for which the feasibility is currently being assessed by the U.S. Muon Accelerator Program (MAP) [1]. A realistic scenario for a complementary series of staged facilities with increasing complexity and significant physics potential at each stage has been developed. It takes advantage of and leverages the capabilities already planned at Fermilab, especially Project X and LBNE. Each stage is defined in such a way as to provide an R&D platform to validate the technologies required for subsequent stages. The rationale and sequence of a realistic staging process are presented.