Comparing Methodologies for Water Activation in Spallation Systems
Explore the source record for details and available documents.
Engineering topics
Publications and source records attributed to Popova, Irina I.
Explore the source record for details and available documents.
The target carriage supports the mercury target vessel in the Spallation Neutron Source (SNS) in a cantilevered fashion and supplies the liquid mercury flowing to and from the target vessel. The target carriage is designed to move the target vessel into its target monolith position to receive the proton beam and then remove it horizontally back into an adjacent service cell, where the target vessel can be exchanged about 2-3 times per calendar year. At the time of the performed studies, the SNS mercury target can accept a proton beam at 1 GeV energy and 1.4 MW power; however, it will be upgraded to receive 1.3 GeV energy at 2 MW by the end of 2024 year [1]. The cart is practically a shield block on wheels to minimize fluxes and dose rates in the service cell downstream of the carriage. There are vent lines located inside a passage on top of the target carriage, and they are covered by a stepping-up steel shield block (vent lines shield block). Vent lines are permanently attached to the shield block. New vent lines with a different design are going to be installed. These lines are shielded by the new steel block to which the vent lines are attached. The estimate of the residual dose rates from the block after it is extracted from the target carriage is performed to estimate the radiation fields and to decide on the type of storage container to be used.
In order to deposit Spallation Neutron Source (SNS) spent facility components replaced due to end-of-life radiation-induced material damage or burn-up, or because of mechanical failure or design improvements, waste classification analyses are being performed. These analyses include an accurate estimate of the radionuclide inventory, on which base components are classified and an appropriate container for transport and storage is determined. After the choice for the container is made, transport calculations are performed for the facility component to be placed inside the container, ensuring compliance with waste management regulations. When necessary, additional shielding is added. Most of the effort is concentrated on the target deposition, which normally takes place once or twice per year. Additionally, the second target station (STS) is in a process of design and waste management analyses for the STS target are being developed to support a deposition plan
According to the Spallation Neutron Source (SNS) operations plan the facility components are replaced, when they reach their end-of-life. These components must be safely removed, placed in a container for storage, and transported from the site. In order to classify components and suggest appropriate shipping container an accurate estimate of the radionuclide inventory is performed. After choice for the container is made, it is being modelled with the facility component, placed inside, in order to perform transport calculations to ensure that the container is compliant with the waste management regulations
Explore the source record for details and available documents.