Latest results from the RD42 collaboration on the radiation tolerance of polycrystalline diamond detectors
Not provided.
Engineering topics
Publications and source records attributed to Porter, A..
Not provided.
Offshore wind (OSW) power based on floating technology in the coastal waters of the U.S. Pacific Ocean has great potential to contribute to climate mitigation and renewable energy goals in California, Oregon, and other parts of the western U.S. To achieve development of OSW at scale, investments in transmission infrastructure are needed to deliver this power to major metropolitan areas because these are the primary electricity load centers. Currently the transmission infrastructure serving coastal regions where OSW is most likely to be developed has limited capacity and is designed to bring power from the east to serve modest coastal loads. The development of OSW generation and the interconnection of this resource to the bulk power grid will require major investments in new transmission infrastructure and upgrades to existing infrastructure. This study investigated the development of up to 25.8 GW of OSW energy on the northern coast of California and the southern coast of Oregon. The focus of the study was to assess various transmission alternatives that could deliver OSW power to distant load centers while also providing energy benefits to rural coastal communities near to where OSW power may be developed.
Explore the source record for details and available documents.
This study illustrates the potential gains obtained by leveraging computational modeling to improve experimental efficiency in NASA research and counter measures studies through implementation of Model-Based Design of Experiments (MBDOE). MBDOE is a method to utilize analogous computational models to improve understanding of complex, multifactor, experimental responses and to determine experimental conditions and optimize information in the fewest number of experimental tests.
This experiment (currently in progress) is designed to measure costs and benefits of different code inspection methods. It is being performed with a real development team writing software for a commercial product. The dependent variables for each code unit's inspection are the elapsed time and the number of defects detected. We manipulate the method of inspection by randomly assigning reviewers, varying the number of reviewers and the number of teams, and, when using more than one team, randomly assigning author repair and non-repair of detected defects between code inspections. After collecting and analyzing the first 17 percent of the data, we have discovered several interesting facts about reviewers, about the defects recorded during reviewer preparation and during the inspection collection meeting, and about the repairs that are eventually made. (1) Only 17 percent of the defects that reviewers record in their preparations are true defects that are later repaired. (2) Defects recorded at the inspection meetings fall into three categories: 18 percent false positives requiring no author repair, 57 percent soft maintenance where the author makes changes only for readability or code standard enforcement, and 25 percent true defects requiring repair. (3) The median elapsed calendar time for code inspections is 10 working days - 8 working days before the collection meeting and 2 after. (4) In the collection meetings, 31 percent of the defects discovered by reviewers during preparation are suppressed. (5) Finally, 33 percent of the true defects recorded are discovered at the collection meetings and not during any reviewer's preparation. The results to date suggest that inspections with two sessions (two different teams) of two reviewers per session (2sX2p) are the most effective. These two-session inspections may be performed with author repair or with no author repair between the two sessions. We are finding that the two-session, two-person with repair (2sX2pR) inspections are the most expensive, taking 15 working days of calendar time from the time the code is ready for review until author repair is complete, whereas two-session, two-person with no repair (2sX2pN) inspections take only 10 working days, but find about 10 percent fewer defects.
The satellite (CTS) is tentatively scheduled to be launched in January 1976. It will be available for educational and societal experimentation early in 1977. This paper will outline some of the educational experiments involving the CTS. The major object of the experiments is to assess the communications and educational implications of the CTS in northern Ontario; the existing communications facilities for this region of approximately 725,000 sq km (inhabited largely by native people) are extremely limited. It is expected to assess the extent to which: (1) a satellite communications system might resolve the communications deficiency, (2) the native people will use the experimental facility, and (3) health and general educational programs, especially utilizing the interactive mode, will be viable.