Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Midcontinent Independent System Operator (MISO) territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the Midcontinent Independent System Operator (MISO), representing nearly 50% of all projects requesting interconnection from 2010 to 2020. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2015 Wind Technologies Market Report

Annual wind power capacity additions in the United States surged in 2015 and are projected to continue at a rapid clip in the coming five years. Recent and projected near-term growth is supported by the industry’s primary federal incentive—the production tax credit (PTC)—having been extended for several years (though with a phase-down schedule, described further on pages 68-69), as well as a myriad of state-level policies. Wind additions are also being driven by improvements in the cost and performance of wind power technologies, yielding low power sales prices for utility, corporate, and other purchasers. At the same time, the prospects for growth beyond the current PTC cycle remain uncertain: growth could be blunted by declining federal tax support, expectations for low natural gas prices, and modest electricity demand growth. This annual report—now in its tenth year—provides a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2015. The report begins with an overview of key installation-related trends: trends in U.S. wind power capacity growth; how that growth compares to other countries and generation sources; the amount and percentage of wind energy in individual states; the status of offshore wind power development; and the quantity of proposed wind power capacity in various interconnection queues in the United States. Next, the report covers an array of wind power industry trends: developments in turbine manufacturer market share; manufacturing and supply-chain developments; wind turbine and component imports into and exports from the United States; project financing developments; and trends among wind power project owners and power purchasers. The report then turns to a summary of wind turbine technology trends: turbine size, hub height, rotor diameter, specific power, and IEC Class. After that, the report discusses wind power performance, cost, and pricing trends. In so doing, it describes trends in project performance, wind turbine transaction prices, installed project costs, and operations and maintenance (O&M) expenses. It also reviews the prices paid for wind power in the United States and how those prices compare to short-term wholesale electricity prices and forecasts of future natural gas prices. Next, the report examines policy and market factors impacting the domestic wind power market, including federal and state policy drivers as well as transmission and grid integration issues. The report concludes with a preview of possible near-term market developments. This edition of the annual report updates data presented in previous editions while highlighting key trends and important new developments from 2015. The report concentrates on larger, utility-scale wind turbines, defined here as individual turbines that exceed 100 kW in size.

17 WIND ENERGY↗

2015 Wind Technologies Market Report

This annual report--now in its tenth year--provides a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2015. The report begins with an overview of key installation trends and then covers an array of industry and technology trends. The report also discusses project performance, wind turbine prices, project costs, operations and maintenance expenses, and prices paid for wind power in the United States. The report examines policy and market factors impacting the domestic wind power market and provides a preview of possible near-term market developments, expenses, and prices paid for wind power in the United States. The report examines policy and market factors impacting the domestic wind power market and provides a preview of possible near-term market developments.

17 WIND ENERGY↗

'Renewables-Friendly' Grid Development Strategies: Experience in the United States, Potential Lessons for China (Chinese Translation)

This is a Chinese translation of NREL/TP-6A20-64940. This report aims to help China's reform effort by providing a concise summary of experience in the United States with 'renewables-friendly' grid management, focusing on experiences that might be applicable to China. It focuses on utility-scale renewables and sets aside issues related to distributed generation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2014 Wind Technologies Market Report

Wind power capacity additions in the United States rebounded in 2014, and continued growth through 2016 is anticipated. Recent and projected near-term growth is supported by the industry’s primary federal incentive—the production tax credit (PTC)—which is available for projects that began construction by the end of 2014. Wind additions are also being driven by recent improvements in the cost and performance of wind power technologies, which have resulted in the lowest power sales prices ever seen in the U.S. wind sector. Growing corporate demand for wind energy and state-level policies play important roles as well. Expectations for continued technological advancements and cost reductions may further boost future growth. At the same time, the prospects for growth beyond 2016 are uncertain. The PTC has expired, and its renewal remains in question. Continued low natural gas prices, modest electricity demand growth, and limited near-term demand from state renewables portfolio standards (RPS) have also put a damper on growth expectations. These trends, in combination with increasingly global supply chains, have limited the growth of domestic manufacturing of wind equipment. What they mean for wind power additions through the end of the decade and beyond will be dictated in part by future natural gas prices, fossil plant retirements, and policy decisions.

17 WIND ENERGY↗

2012 Wind Technologies Market Report

This report describes the status of the U.S. wind energy industry market in 2012; its trends, performance, market drivers and future outlook.

17 WIND ENERGY↗

2012 wind technologies market report

Annual wind power capacity additions in the United States achieved record levels in 2012, motivated by the then-planned expiration of federal tax incentives at the end of 2012 and recent improvements in the cost and performance of wind power technology. At the same time, even with a short-term extension of federal tax incentives now in place, the U.S. wind power industry is facing uncertain times. It will take time to rebuild the project pipeline, ensuring a slow year for new capacity additions in 2013. Continued low natural gas prices, modest electricity demand growth, and limited near-term demand from state renewables portfolio standards (RPS) have also put a damper on industry growth expectations. In combination with global competition within the sector, these trends continue to impact the manufacturing supply chain. What these trends mean for the medium to longer term remains to be seen, dictated in part by future natural gas prices, fossil plant retirements, and policy decisions, although recent declines in the price of wind energy have boost ed the prospects for future growth

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2011 Wind Technologies Market Report

This report describes the status of the U.S. wind energy industry market in 2011; its trends, performance, market drivers and future outlook.

17 WIND ENERGY↗

2011 Wind Technologies Market Report

The U.S. wind power industry is facing uncertain times. With 2011 capacity additions having risen from 2010 levels and with a further sizable increase expected in 2012, there are – on the surface – grounds for optimism. Key factors driving growth in 2011 included continued state and federal incentives for wind energy, recent improvements in the cost and performance of wind power technology, and the need to meet an end-of-year construction start deadline in order to qualify for the Section 1603 Treasury grant program. At the same time, the currently-slated expiration of key federal tax incentives for wind energy at the end of 2012 – in concert with continued low natural gas prices and modest electricity demand growth – threatens to dramatically slow new builds in 2013.

17 WIND ENERGY↗

Chapter 2: Preface: Wind Power Myths Debunked

Wind power use has grown significantly in recent years. As power system planners, investors, and other stakeholders evaluate the development of wind power plants, many questions about wind power plant operational characteristics have arisen. These questions range from asking whether wind power plants require storage, to how fast can wind power plants' output fall to zero. Recent experience in operating power systems with increasing levels of wind power, along with a significant body of analysis, has provided answers to many of these questions. In this chapter, we discuss many of these key questions and answers drawing on international experience and analysis of wind power plant operations.

17 WIND ENERGY↗

2010 Wind Technologies Market Report

The U.S. wind power industry experienced a trying year in 2010, with a significant reduction in new builds compared to both 2008 and 2009. The delayed impact of the global financial crisis, relatively low natural gas and wholesale electricity prices, and slumping overall demand for energy countered the ongoing availability of existing federal and state incentives for wind energy deployment. The fact that these same drivers did not impact capacity additions in 2009 can be explained, in part, by the 'inertia' in capital-intensive infrastructure investments: 2009 capacity additions were largely determined by decisions made prior to the economy-wide financial crisis that was at its peak in late 2008 and early 2009, whereas decisions on 2010 capacity additions were often made at the height of the financial crisis. Cumulative wind power capacity still grew by a healthy 15% in 2010, however, and most expectations are for moderately higher wind power capacity additions in 2011 than witnessed in 2010, though those additions are also expected to remain below the 2009 high.

03 NATURAL GAS↗

The Relevance of Generation Interconnection Procedures to Feed-in Tariffs in the United States

Feed-in tariffs (FITs) have been used to promote renewable electricity development in over 40 countries throughout the past two decades. These policies generally provide guaranteed prices for the full system output from eligible generators for a fixed time period (typically 15–20 years). Due in part to the success of FIT policies in Europe, some jurisdictions in the United States are considering implementing similar policies, and a few have already put such policies in place. This report is intended to offer some guidance to policymakers and regulators on how generator interconnection procedures may affect the implementation of FITs and how state generator interconnection procedures can be formulated to support state renewable energy objectives. This report is based on a literature review of model interconnection procedures formulated by several organizations, as well as other documents that have reviewed, commented on, and in some cases, ranked state interconnection procedures.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗