Search NASA⌕ Search

Engineering topics

Powers, Adam

Publications and source records attributed to Powers, Adam.

FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

Surface processing and discharge-conditioning of high voltage electrodes for the Ra EDM experiment

The Ra EDM experiment uses a pair of high voltage electrodes to search for the atomic electric dipole moment of 225 Ra. We use identical, plane–parallel electrodes with a primary high gradient surface of 200 mm 2 to generate reversible DC electric fields. Our statistical sensitivity is linearly proportional to the electric field strength in the electrode gap. We adapted surface decontamination and processing techniques from accelerator physics literature to chemical polish and clean a suite of newly fabricated large-grain niobium and grade-2 titanium electrodes. Three pairs of niobium electrodes and one pair of titanium electrodes were discharge-conditioned with a custom high voltage test station at electric field strengths as high as +52.5 kV/mm and –51.5 kV/mm over electrode gap sizes ranging from 0.4 mm to 2.5 mm. One pair of large-grain niobium electrodes was discharge-conditioned and validated to operate at ±20 kV/mm with steady-state leakage current ≤ 25 pA (1σ) and a polarity-averaged 98 ± 19 discharges per hour. These electrodes were installed in the Ra EDM experimental apparatus, replacing a copper electrode pair, and were revalidated to ±20 kV/mm. Here, the niobium electrodes perform at an electric field strength 3.1 times larger than the legacy copper electrodes and are ultimately limited by the maximum output of our 30 kV bipolar power supply.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗