The Continuous Electron Beam Accelerator Facility at 12 GeV

This review paper describes the energy-upgraded Continuous Electron Beam Accelerator Facility (CEBAF) accelerator. This superconducting linac has achieved 12 GeV beam energy by adding 11 new high-performance cryomodules containing 88 superconducting cavities that have operated cw at an average accelerating gradient of 20 MV / m . After reviewing the attributes and performance of the previous 6 GeV CEBAF accelerator, we discuss the upgraded CEBAF accelerator system in detail with particular attention paid to the new beam acceleration systems. In addition to doubling the acceleration in each linac, the upgrade included improving the beam recirculation magnets, adding more helium cooling capacity to allow the newly installed modules to run cold, adding a new experimental hall, and improving numerous other accelerator components. We review several of the techniques deployed to operate and analyze the accelerator performance and document system operating experience and performance. In the final portion of the document, we present much of the current planning regarding projects to improve accelerator performance and enhance operating margins, and our plans for ensuring CEBAF operates reliably into the future. For the benefit of potential users of CEBAF, the performance and quality measures for the beam delivered to each of the experimental halls are summarized in the Appendix. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

In Situ Plasma processing of SRF cuperconducting cavities at JLAB, 2024 Update

Jefferson Lab has an ongoing R&D program in plasma processing. The experimental program investi-gated processing using argon/oxygen and heli-um/oxygen gas mixtures. Plasma processing is a com-mon technique where the free oxygen produced by the plasma breaks down and removes hydrocarbons from surfaces. This increases the work function and reduces the secondary emission coefficient. The initial focus of the effort was processing C100 cavities by injecting RF power into the high order mode (HOM) coupler ports. We also developed the methods for establishing a plasma in C75 cryomodules where the RF power is injected via the fundamental power-coupler. Four C100 cryomodules were in situ processed in the CE-BAF accelerator in May 2023 with the cryomodules returning to an operational status in Sept. 2023. The overall operational energy gain for the four cryomod-ules was 49 MeV. Methods, systems and results from processing cryomodules in the CEBAF accelerator and vertical test results are presented. Current status and future plans are discussed.

Powers, T.↗

Improved Beam Loss Accounting with Fast Data Acquisition (DAQ) Chassis

Identifying the source of beam loss events in the CE-BAF accelerator can be a challenging task. However, with our new prototype system, this task becomes more effi-cient. The system, developed in the fall of 2022, utilizes a dispersive beam position monitor (BPM) and the exist-ing switched electrode electronics BPM hardware. Previ-ously a commercial off-the-shelf data acquisition (DAQ) system was employed to capture BPM wire signals at a sample rate of 20 kS/s. The fast shutdown signal triggered the system, which disables the beam at the injector. Analysis of beam position and energy variation before a beam loss event was used to determine if the beam loss event was associated with an energy transient. The proto-type system, implemented using National Instruments hardware and LabVIEW® software, relied on a software trigger. Manual post-processing was required to ascertain whether the fault was due to an un-tripped cavity with a gradient or phase transient. This work focuses on deploying a Fast DAQ Chassis to monitor BPM hardware in real time and during beam loss events. This system was originally developed and in-stalled in CEBAF to monitor the time-domain RF control signals in the legacy analog RF systems. This technology was leveraged to also monitor BPM signals. As the new system employs a hardware trigger, developing tools to automatically identify faults linked to energy transients unrelated to cavity faults will be straightforward. This paper will discuss the project's initial updates, underlin-ing the crucial role of each member of our team in this achievement

Tiskumara, J.↗

DEVELOPMENT OF PLASMA SIMULATION TOOL FOR THE ACCEL-ERATING CAVITIES

Plasma processing of superconducting radio frequency (SRF) cavities has shown an improvement in accelerating gradient by reducing the radiation due to field emission and multipacting. Plasma processing is a common tech-nique where the free oxygen produced by the plasma breaks down and removes hydrocarbons from surfaces. This increases the work function and reduces the second-ary emission coefficient. The hydrocarbon fragments of H2, CO, CO2, and H2O are removed from the system with the process gas which is flowing through the system. Here, we present COMSOL for the first time to simulate the plasma processing of an SRF cavity. In this work, we use Jefferson Lab's C75 SRF cavities design as our case study. Using simulation, we predict the condition of plasma ignition inside the SRF cavity. The simulation provides information about the optimal rf coupling to the cavity, mode for plasma ignition, choice of gas concen-tration, power, and pressure.

Senevirathne, I.↗

Commissioning of the Second JLAB C75 Cryomodule & Performance Evaluation of Installed C75 Cavities

JLAB has long been a hub of SRF technology with the CEBAF accelerator as one of its first large scale adopters. As SRF technology has advanced, the C50 and C100 programs have allowed for the extension of CEBAF's total energy to 6 GeV and nearly 12 GeV respectively. Along with the increase in energy reach, rates of accelerating gradient degradation have been extracted for these cryomodule designs. A plan to mitigate these losses & maintain robust gradient headroom to deliver the 12 GeV program - the CEBAF Performance Plan - established a multi-year effort of cryomodule refurbishments and replacements. Part of this plan included a cost optimization of the C50 program with more modern processing techniques and the replacement of existing cavities with larger grain boundary cavities produced from ingot Niobium (dubbed C75 for 75 MeV gain). Reports have been made on the prototype pair of C75 cavities installed in a C50 cryomodule and the first full C75 cryomodule installed in 2017 and 2021. This paper reports on the results from the qualification of the cavities for the second C75 module in both a vertical cryostat and the commissioning results of the cryomodule in the CEBAF tunnel. This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics under contract DE-AC05-06OR23177.

McCaughan, Michael↗