Search NASA⌕ Search

Engineering topics

Pozdeyev, E.

Publications and source records attributed to Pozdeyev, E..

An 8 GeV linac as the Booster replacement in the Fermilab Power Upgrade

Increasing the Main Injector beam power above ~ 1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. In this paper, we consider an 8 GeV linac Booster replacement that produces 8 GeV H$^{-}$ beam for injection into the Recycler Ring or Main Injector. This upgrade will maximize the beam available for neutrino production for the long baseline DUNE experiment to greater than 2.5 MW and enable a next generation frontier experiments. The 8 GeV linac takes ~ 1 GeV beam from the PIP-II Linac and accelerates it to ~ 2 GeV in a650 MHz superconducting RF linac, followed by a ~ 2 to 8 GeV pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in superconducting RF technology. The linac configuration and beam dynamics requirements are presented. Injection options are discussed, including use of an8 GeV Accumulator Ring. Foil-based injection is the present standard but R&D toward implementing laser-assisted injection could enable a significant improvement. Research needed to implement the Booster replacement is described.

43 PARTICLE ACCELERATORS↗

Electron Cloud Measurements in Fermilab Booster

Fermilab Booster synchrotron requires an intensity upgrade from 4.5x1012 to 6.5x1012 protons per pulse as a part of Fermilab's Proton Improvement Plan-II (PIP-II). One of the factors which may limit the high-intensity performance is the fast transverse instabilities caused by electron cloud effects. According to the experience in the Recycler, the electron cloud gradually builds up over multiple turns inside the combined function magnets and can reach final intensities orders of magnitude greater than in a pure dipole. Since the Booster synchrotron also incorporates combined function magnets, it is important to measure the presence of electron cloud. The presence or apparent absence of the electron cloud was investigated using two different methods: measuring bunch-by-bunch tune shift by changing the bunch train structure at different intensities and propagating a microwave carrier signal through the beampipe and analyzing the phase modulation of the signal. This paper presents the results of the two methods and corresponding simulation results conducted using PyECLOUD software.

43 PARTICLE ACCELERATORS↗

Accelerators for Rare Processes and Physics Beyond Colliders: Report of the AF5 Topical Group to Snowmass 2021

This report summarizes the findings of the AF5 Topical Subgroup to Snowmass 2021, which investigated accelerators for rare processes and physics beyond colliders. The report focuses primarily on opportunities for dark sector searches and the need for coordinated development of the Fermilab experimental program for PIP-II and beyond. In addition, a number of other physics opportunities are cataloged and suggestions for synergistic R&D opportunities with various areas of technological development are discussed.

43 PARTICLE ACCELERATORS↗

An 8 GeV Linac as the booster replacement in the Fermilab Power Upgrade [Slides]

Increasing the Fermilab Main Injector beam power available to the high-energy neutrino experiments above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Rapid-cycling synchrotron and Linac solutions were considered for this purpose. We consider the Linac version that produces 8 GeV H- beam for injection into the Recycler Ring or Main Injector. The new Linac takes ~1 GeV beam from the PIP-II Linac and accelerates it to ~8 GeV in SRF structures. The Linac components incorporate recent improvements in SRF technology.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Electron Cloud Measurements in Fermilab Booster

Fermilab Booster synchrotron requires an intensity upgrade from 4.5x1012 to 6.5x1012 protons per pulse as a part of Fermilabs Proton Improvement Plan-II (PIP-II). One of the factors which may limit the high-intensity performance is the fast transverse instabilities caused by electron cloud effects. According to the experience in the Recycler, the electron cloud gradually builds up over multiple turns in the combined function magnets and can reach final intensities orders of magnitude greater than in a pure dipole. Since the Booster synchrotron also incorporates combined function magnets, it is essential to discover any existence of an electron cloud. And if it does, its effects on the PIP-II era Booster and its mitigating techniques. As the first step, the presence or absence of the electron cloud was investigated using the clearing bunch technique. This paper presents experimental details and observations of the bunch-by-bunch tune shifts of beams with various bunch train structures at low and high intensities and simulation results conducted using PyECLOUD.

43 PARTICLE ACCELERATORS↗

An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade

Increasing the Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. In the Project X era, rapid-cycling synchrotron (RCS) and Linac solutions were considered for this purpose. In this paper, we consider the Linac version that produces 8 GeV H- beam for injection into the Recycler Ring(RR) or Main Injector (MI). The Linac takes ~1 GeV beam from the PIP-II Linac and accelerates it to ~2 GeV in a 650MHz SRF Linac, followed by a ~2-8 GeV pulsed Linac using 1300 MHz cryomodules. The Linac components incorporate recent improvements in SRF technology. The Linac configuration and beam dynamics requirements are presented. Injection options are discussed. Foil-based injection is the present standard but R&D toward implementing laser-assisted injection could enable a significant improvement. Research needed to implement the Booster replacement is described.

42 ENGINEERING↗

An Upgrade Path for the Fermilab Accelerator Complex

The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac that can be used for lower-energy particle physics experiments as well, such as directing beam toward the Muon Campus at Fermilab for example. Any further significant upgrade of the beam power to DUNE, however, will be impeded by the limitations of the present Booster synchrotron at the facility. To increase the power to DUNE by a factor of two would require a new accelerator arrangement to feed the Main Injector that does not include the Booster. In what follows, a path toward upgrading the Fermilab accelerator complex to bring the beam power for DUNE to 2.4 MW is presented, using a new rapid-cycling synchrotron plus an energy upgrade to the PIP-II linac. The path includes the ability to instigate a new lower-energy, very high-power beam delivery system for experiments that can address much of the science program presented by the Booster Replacement Science Working Group. It also allows for the future possibility to go beyond 2.4 MW up to roughly 4 MW from the Main Injector.

43 PARTICLE ACCELERATORS↗