Search NASA⌕ Search

Engineering topics

Pozdeyev, E.

Publications and source records attributed to Pozdeyev, E..

An 8 GeV linac as the Booster replacement in the Fermilab Power Upgrade

Increasing the Main Injector beam power above ~ 1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. In this paper, we consider an 8 GeV linac Booster replacement that produces 8 GeV H$^{-}$ beam for injection into the Recycler Ring or Main Injector. This upgrade will maximize the beam available for neutrino production for the long baseline DUNE experiment to greater than 2.5 MW and enable a next generation frontier experiments. The 8 GeV linac takes ~ 1 GeV beam from the PIP-II Linac and accelerates it to ~ 2 GeV in a650 MHz superconducting RF linac, followed by a ~ 2 to 8 GeV pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in superconducting RF technology. The linac configuration and beam dynamics requirements are presented. Injection options are discussed, including use of an8 GeV Accumulator Ring. Foil-based injection is the present standard but R&D toward implementing laser-assisted injection could enable a significant improvement. Research needed to implement the Booster replacement is described.

43 PARTICLE ACCELERATORS↗

Electron Cloud Measurements in Fermilab Booster

Fermilab Booster synchrotron requires an intensity upgrade from 4.5x1012 to 6.5x1012 protons per pulse as a part of Fermilab's Proton Improvement Plan-II (PIP-II). One of the factors which may limit the high-intensity performance is the fast transverse instabilities caused by electron cloud effects. According to the experience in the Recycler, the electron cloud gradually builds up over multiple turns inside the combined function magnets and can reach final intensities orders of magnitude greater than in a pure dipole. Since the Booster synchrotron also incorporates combined function magnets, it is important to measure the presence of electron cloud. The presence or apparent absence of the electron cloud was investigated using two different methods: measuring bunch-by-bunch tune shift by changing the bunch train structure at different intensities and propagating a microwave carrier signal through the beampipe and analyzing the phase modulation of the signal. This paper presents the results of the two methods and corresponding simulation results conducted using PyECLOUD software.

43 PARTICLE ACCELERATORS↗

Accelerators for Rare Processes and Physics Beyond Colliders: Report of the AF5 Topical Group to Snowmass 2021

This report summarizes the findings of the AF5 Topical Subgroup to Snowmass 2021, which investigated accelerators for rare processes and physics beyond colliders. The report focuses primarily on opportunities for dark sector searches and the need for coordinated development of the Fermilab experimental program for PIP-II and beyond. In addition, a number of other physics opportunities are cataloged and suggestions for synergistic R&D opportunities with various areas of technological development are discussed.

43 PARTICLE ACCELERATORS↗

An 8 GeV Linac as the booster replacement in the Fermilab Power Upgrade [Slides]

Increasing the Fermilab Main Injector beam power available to the high-energy neutrino experiments above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Rapid-cycling synchrotron and Linac solutions were considered for this purpose. We consider the Linac version that produces 8 GeV H- beam for injection into the Recycler Ring or Main Injector. The new Linac takes ~1 GeV beam from the PIP-II Linac and accelerates it to ~8 GeV in SRF structures. The Linac components incorporate recent improvements in SRF technology.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Electron Cloud Measurements in Fermilab Booster

Fermilab Booster synchrotron requires an intensity upgrade from 4.5x1012 to 6.5x1012 protons per pulse as a part of Fermilabs Proton Improvement Plan-II (PIP-II). One of the factors which may limit the high-intensity performance is the fast transverse instabilities caused by electron cloud effects. According to the experience in the Recycler, the electron cloud gradually builds up over multiple turns in the combined function magnets and can reach final intensities orders of magnitude greater than in a pure dipole. Since the Booster synchrotron also incorporates combined function magnets, it is essential to discover any existence of an electron cloud. And if it does, its effects on the PIP-II era Booster and its mitigating techniques. As the first step, the presence or absence of the electron cloud was investigated using the clearing bunch technique. This paper presents experimental details and observations of the bunch-by-bunch tune shifts of beams with various bunch train structures at low and high intensities and simulation results conducted using PyECLOUD.

43 PARTICLE ACCELERATORS↗

An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade

Increasing the Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. In the Project X era, rapid-cycling synchrotron (RCS) and Linac solutions were considered for this purpose. In this paper, we consider the Linac version that produces 8 GeV H- beam for injection into the Recycler Ring(RR) or Main Injector (MI). The Linac takes ~1 GeV beam from the PIP-II Linac and accelerates it to ~2 GeV in a 650MHz SRF Linac, followed by a ~2-8 GeV pulsed Linac using 1300 MHz cryomodules. The Linac components incorporate recent improvements in SRF technology. The Linac configuration and beam dynamics requirements are presented. Injection options are discussed. Foil-based injection is the present standard but R&D toward implementing laser-assisted injection could enable a significant improvement. Research needed to implement the Booster replacement is described.

42 ENGINEERING↗

An Upgrade Path for the Fermilab Accelerator Complex

The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac that can be used for lower-energy particle physics experiments as well, such as directing beam toward the Muon Campus at Fermilab for example. Any further significant upgrade of the beam power to DUNE, however, will be impeded by the limitations of the present Booster synchrotron at the facility. To increase the power to DUNE by a factor of two would require a new accelerator arrangement to feed the Main Injector that does not include the Booster. In what follows, a path toward upgrading the Fermilab accelerator complex to bring the beam power for DUNE to 2.4 MW is presented, using a new rapid-cycling synchrotron plus an energy upgrade to the PIP-II linac. The path includes the ability to instigate a new lower-energy, very high-power beam delivery system for experiments that can address much of the science program presented by the Booster Replacement Science Working Group. It also allows for the future possibility to go beyond 2.4 MW up to roughly 4 MW from the Main Injector.

43 PARTICLE ACCELERATORS↗

An 8 GEV Linac As The Booster Replacement In The Fermilab Power Upgrade

Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In this paper, we consider the linac version that produces 8 GeV H- beam for injection into the Recycler Ring (RR) or MI The new linac takes ~1 GeV beam from the PIP-II linac and accelerates it to ~ 2 GeV in a 650 MHz SRF linac, and then accelerates to ~8 GeV in an SRF pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in SRF technology. This Booster Replacement linac (BRL) will increase MI beam power to DUNE to more than 2.5 MW and enable next-generation intensity frontier experiments.

Neuffer, David V.↗

Commissioning Status of the Linac for the Facility for Rare Isotope Beams

The Facility for Rare Isotope Beams will be completed in late 2021. Here, we report here on the current efforts to commission the first stages of the 200-MeV/u superconducting, continuous wave heavy-ion linac. The statuses of the cryogenic plant and its distribution system, the accelerator cryomodule commissioning and operations, the ion source and front end transport development, the radio-frequency quadrupole commissioning, and then beam dynamics development to support high-power operation are reviewed. Plans for commissioning the remainder of the linac systems are presented.

43 PARTICLE ACCELERATORS↗

The Beam Dynamics Updates of the Fermilab PIP-II 800 MeV Superconducting LINAC

The Proton Improvement Plan (PIP) -II is a high inten-sity proton facility being developed to support a neutrino program over the next two decades at Fermilab. At its core is the design and construction of a Continuous Wave (CW) compatible superconducting radio frequency (SRF) linear accelerator that would accelerate an average beam current of 2 mA up to 800 MeV. This paper presents recent updates in the beam dynamics leading to a reliable and robust linac design and simplifying the cryomodule assembly.

43 PARTICLE ACCELERATORS↗

FLUKA-MARS15 Simulations to Optimize Fermilab PIP-II Movable Beam Absorber

PIP-II is the Fermilab's flagship project to provide powerful, high-intensity proton beams to the laboratory's experiments. The heart of the PIP-II project is an H- 800 MeV superconducting linear accelerator. In order to commission the beam and operate safely the linac, several constraints were evaluated. The design of a movable 5 kW beam absorber was finalized to allow staged beam commissioning in different linac locations. Prompt and residual radiation levels were calculated, and radiation shields were optimized to keep those values within the acceptable levels in the areas surrounding beam absorber. Monte Carlo calculations with FLUKA and MARS15 codes are presented in the paper to support these studies.

43 PARTICLE ACCELERATORS↗

Design of a Superconducting 28 GHz Ion Source Magnet for FRIB Using a Shell-Based Support Structure

The Superconducting Magnet Program at the Lawrence Berkeley National Laboratory (LBNL) is completing the design of a 28 GHz NbTi ion source magnet for the Facility for Rare Isotope Beams (FRIB). The design parameters are based on the parameters of the ECR ion source VENUS in operation at LBNL since 2002 featuring a sextupole-in-solenoids configuration. Whereas most of the magnet components (such as conductor, magnetic design, protection scheme) remain very similar to the VENUS magnet components, the support structure of the FRIB ion source uses a different concept. A shell-based support structure using bladders and keys is implemented in the design allowing fine tuning of the sextupole preload and reversibility of the magnet assembly process. As part of the design work, conductor insulation scheme, coil fabrication processes and assembly procedures are also explored to optimize performance. Finally, we present the main features of the design emphasizing the integrated design approach used at LBNL to achieve this result.

ECR ion source magnet↗

Progress towards the Facility for Rare Isotope Beams

Muon-based facilities offer a unique potential to provide capabilities at both the Intensity Frontier with Neutrino Factories and the Energy Frontier with Muon Colliders ranging from the Higgs energy to the multi-TeV energy range. They rely on novel technology with challenging parameters, for which the feasibility is currently being assessed by the U.S. Muon Accelerator Program (MAP) [1]. A realistic scenario for a complementary series of staged facilities with increasing complexity and significant physics potential at each stage has been developed. It takes advantage of and leverages the capabilities already planned at Fermilab, especially Project X and LBNE. Each stage is defined in such a way as to provide an R&D platform to validate the technologies required for subsequent stages. The rationale and sequence of a realistic staging process are presented.

Wei, J.↗

Report on Design, Development, and Characterization of a Coaxial Resonator Based Single-gap Gridless Multiharmonic Buncher

The design of the multiharmonic buncher is determined by Facility for Rare Isotope Beam (FRIB) requirements. The buncher will bunch stable ion beams for injection into the FRIB RFQ to minimize the longitudinal beam emittance growth. The design beam energy is fixed at 12 keV/u while the beam charge state Q/A can vary from 1/3 to 1/7. The buncher operates at a fundamental frequency of 40.25 MHz. Two higher harmonics, 80.5 MHz and 120.75 MHz are used to linearize the voltage ramp. The typical accelerating voltage for a uranium beam, including the time-of-flight factor, is 1271 V, 456 V, and 150 V for 40.25 MHz, 80.5 MHz, and 120.75 MHz harmonics respectively. The voltage will be scaled with the charge state of an accelerated beam. The accelerated electrical beam current is expected to be approximately equal to 0.5 mA for all ion beams between oxygen and uranium.

43 PARTICLE ACCELERATORS↗

Cathode Ion Bombardment in RF Photoguns

In this paper, we use the method of rapid oscillating field to solve the equation of ion motion in an RF gun. We apply the method to the BNL 1/2-cell SRF photogun and demonstrate that a significant portion of ions produced in the gun can reach the cathode if no special precautions are taken. Also, the paper proposes a simple mitigation recipe that can reduce the rate of ion bombardment.

43 PARTICLE ACCELERATORS↗