Search NASA⌕ Search

Engineering topics

Prahl, Duncan

Publications and source records attributed to Prahl, Duncan.

Data Driven Commercial Building Energy Code Compliance and Technology Inventory for New York City

Building Performance Standards (BPS) are gaining national traction. A BPS will require new processes in the design, construction, and operation of buildings that take the occupants into account and enable predictive analysis to ensure compliance with current and future GHG emissions caps. In New York City, most buildings over 25,000 square feet will be regulated by a BPS starting in 2024, regardless of whether it is new construction permitted under current energy codes or an existing building. This research is one of the first to begin the evaluation of a long-term series of building policies in the context of an open data ecosystem, in cooperation with city agencies. Existing building policies enacted in NYC have ranged from building energy benchmarking and labeling to energy audits to the regulation of GHG emission in buildings. Through the development of a dataset related to building technologies and energy consumption, this project can help to evaluate if meaningful conclusions can be drawn for the data that has been largely self-reported in compliance with city regulations. This project will also provide lessons learned from a deep dive into these types of datasets to provide best practices for municipalities or states seeking to embark on policies like those enacted in NYC. In addition, a Building Automation System (BAS) Stretch Standard of Care (SSOC) for owners, designers, and building operators will enable the measurement and predictive analysis of energy consumption and GHG emissions at the plant, system, or component level, in anticipation of regulated GHG limits on buildings based on energy use. The SSOC is expected to be suitable for use on a national level. The primary feature of an SSOC is a standardized format for a set of BAS points that can be used to control and to gather data from individual plants, systems, or components that are related to building energy consumption. This project examined how measurements compare to prescriptive or simulation-based energy code targets, finding little correlation between predictive 8760-hour energy modeling and actual energy consumption for a small sample (n=27) of buildings constructed after 2015. Other analysis found that, while large multifamily housing (MFH) buildings showed a general trend similar to predicted reductions in energy use from the implementation of model commercial energy codes, this trend was not evident in the office, K-12 school, and hotel use groups in NYC. No upward or downward trends in energy consumption were found when buildings were grouped by size. Energy audit data were analyzed and it appears that there is bias by audit company on measures recommended to clients. Further research should be performed to cross-analyze this with other attributes, such as building size, vintage, and number of stories. Analysis found that for 281 buildings that were permitted and completed after 2015 and had submitted benchmarking data in 2022, between 81% and 96% (by use group) were found to be in compliance with the 2024 to 2029 NYC BPS emission caps, and between 55% and 89% were in compliance with the 2030-2034 caps. This work is beneficial to the public in helping policymakers and building stakeholders better understand the wide-ranging implications of a BPS.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Spray Foam Exterior Insulation with Stand-Off Furring - New York

IBACOS and Green Homes America 1 (GHA) collaborated with the New York State Energy Research and Development Authority (NYSERDA) Advanced Buildings Program to research a variation of a commercial curtain wall assembly for residential construction as part of a comprehensive whole-house deep energy retrofit (DER) package. The advantages of this strategy include minimizing the physical connections to each individual existing wall stud, using closedcell spray foam to encapsulate existing siding materials including lead paint, and creating a vented rain screen assembly to promote drying. As Moore (2011) states, "Closed-cell foam acts as air-sealing, insulation, and secondary drainage plane..." Field installations on a limited number of houses indicate that the incremental cost when installed as part of a typical siding and window replacement job adds approximately $10/ft2 of wall area. 2 x 4 framing members were attached to the wall at band joists and top plates using "L" clips, and spray foam was used to insulate the wall after the framing was installed. Windows were installed as the framing was put up, including extension jambs. Key lessons learned include the following: (1) The installed cost of the spray foam system was comparable to the installed cost of the rigid foam and furring strips. (2) Spray foam should be applied in such a way that it locks the framing members in place before the remaining foam is installed in the field of the wall. The spray foam has a tendency to move the new wall framing as it expands. Best practice is to "picture frame" the wall framing with spray foam and then apply the spray foam in the field of each bay. (3) Variations in the existing siding conditions must be accounted for when attaching the ledger boards and wall framing. A best practice is to uniformly shim the ledger boards off the walls so the new framing is a uniform distance from the ledger boards and the inside surface of the interior framing. This is important primarily for window and door installation and the associated extension jambs and trim. (4) From a sequencing perspective, it is advantageous to replace the windows at the same time as the exterior walls are being built. This requires a crew that can perform a number of different tasks (e.g., framing, flashing, window install, trim carpentry) and does not lend itself to subcontracting this approach piecemeal (e.g., framing subcontractor, window installer, drainage plane installer, trim carpenter). (5) Application of the brackets and associated fastener screws was more time consuming than anticipated. (6) It is important for the spray foam contractor to perform all preparatory work, which in this case included placing plastic over the windows and exposed foundation to minimize or eliminate the possibility of damage due to overspray.

Array↗

Moisture Risk in Unvented Attics Due to Air Leakage Paths - Minneapolis Minnesota

IBACOS completed an initial analysis of moisture damage potential in an unvented attic insulated with closed-cell spray polyurethane foam. To complete this analysis, the research team collected field data, used computational fluid dynamics to quantify the airflow rates through individual airflow (crack) paths, simulated hourly flow rates through the leakage paths with CONTAM software, correlated the CONTAM flow rates with indoor humidity ratios from Building Energy Optimization software, and used "Warme und Feuchte instationar Pro two-dimensional modeling" to determine the moisture content of the building materials surrounding the cracks. Given the number of simplifying assumptions and numerical models associated with this analysis, the results indicate that localized damage due to high moisture content of the roof sheathing is possible under very low airflow rates. Reducing the number of assumptions and approximations through field studies and laboratory experiments would be valuable to understand the real-world moisture damage potential in unvented attics.

Array↗

Analysis of Pre-Retrofit Building and Utility Data

IBACOS analyzed pre-retrofit daily utility data to sort homes by energy consumption, allowing for better targeting of homes for physical audits. Following ASHRAE Guideline 14 normalization procedures, electricity consumption of 1,166 all electric production-built homes' was modeled. The homes were in two communities -- one built in the 1970s and the other in the mid-2000s.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Analysis of Pre-Retrofit Building and Utility Data

IBACOS analyzed pre-retrofit daily utility data to sort homes by energy consumption, allowing for better targeting of homes for physical audits. Following ASHRAE Guideline 14 normalization procedures, electricity consumption of 1,166 all electric production-built homes was modeled. The homes were in two communities—one built in the 1970s and the other in the mid-2000s.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Spray Foam Exterior Insulation with Stand-Off Furring

IBACOS, in collaboration with GreenHomes America, was contracted by the New York State Energy Research and Development Authority to research exterior wall insulation solutions. This research investigated cost-effective deep energy retrofit (DER) solutions for improving the building shell exterior while achieving a cost-reduction goal, including reduced labor costs to reach a 50/50 split between material and labor. The strategies included exterior wall insulation plus energy upgrades as needed in the attic, mechanical and ventilation systems, and basement band joist, walls, and floors. The work can be integrated with other home improvements such as siding or window replacement. This strategy minimizes physical connections to existing wall studs, encapsulates existing siding materials (including lead paint) with spray foam, and creates a vented rain screen assembly to promote drying. GreenHomes America applied construction details created by IBACOS to a test home. 2x4 framing members were attached to the wall at band joists and top plates using 'L' clips, with spray foam insulating the wall after framing was installed. Windows were installed simultaneously with the framing, including extension jambs. The use of clips in specific areas provided the best strength potential, and 'picture framing' the spray foam held the 2x4s in place. Short-term testing was performed at this house, with monitoring equipment installed for long-term testing. Testing measurements will be provided in a later report, as well as utility impact (before and after), costs (labor and materials), construction time, standard specifications, and analysis for the exterior wall insulation strategy.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Spray Foam Exterior Insulation with Stand-Off Furring

IBACOS, in collaboration with GreenHomes America, was contracted by the New York State Energy Research and Development Authority to research exterior wall insulation solutions. This research investigated cost-effective deep energy retrofit (DER) solutions for improving the building shell exterior while achieving a cost-reduction goal, including reduced labor costs to reach a 50/50 split between material and labor. The strategies included exterior wall insulation plus energy upgrades as needed in the attic, mechanical and ventilation systems, and basement band joist, walls, and floors. The work can be integrated with other home improvements such as siding or window replacement. This strategy minimizes physical connections to existing wall studs, encapsulates existing siding materials (including lead paint) with spray foam, and creates a vented rain screen assembly to promote drying. GreenHomes America applied construction details created by IBACOS to a test home. 2x4 framing members were attached to the wall at band joists and top plates using "L" clips, with spray foam insulating the wall after framing was installed. Windows were installed simultaneously with the framing, including extension jambs. The use of clips in specific areas provided the best strength potential, and "picture framing" the spray foam held the 2x4s in place. Short-term testing was performed at this house, with monitoring equipment installed for long-term testing. Testing measurements will be provided in a later report, as well as utility impact (before and after), costs (labor and materials), construction time, standard specifications, and analysis for the exterior wall insulation strategy.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Computational Fluid Dynamics Analysis of Flexible Duct Junction Box Design

IBACOS explored the relationships between pressure and physical configurations of flexible duct junction boxes by using computational fluid dynamics (CFD) simulations to predict individual box parameters and total system pressure, thereby ensuring improved HVAC performance. Current Air Conditioning Contractors of America (ACCA) guidance (Group 11, Appendix 3, ACCA Manual D, Rutkowski 2009) allows for unconstrained variation in the number of takeoffs, box sizes, and takeoff locations. The only variables currently used in selecting an equivalent length (EL) are velocity of air in the duct and friction rate, given the first takeoff is located at least twice its diameter away from the inlet. This condition does not account for other factors impacting pressure loss across these types of fittings. For each simulation, the IBACOS team converted pressure loss within a box to an EL to compare variation in ACCA Manual D guidance to the simulated variation. IBACOS chose cases to represent flows reasonably correlating to flows typically encountered in the field and analyzed differences in total pressure due to increases in number and location of takeoffs, box dimensions, and velocity of air, and whether an entrance fitting is included. The team also calculated additional balancing losses for all cases due to discrepancies between intended outlet flows and natural flow splits created by the fitting. In certain asymmetrical cases, the balancing losses were significantly higher than symmetrical cases where the natural splits were close to the targets. Thus, IBACOS has shown additional design constraints that can ensure better system performance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Computational Fluid Dynamics Analysis of Flexible Duct Junction Box Design

IBACOS explored the relationships between pressure and physical configurations of flexible duct junction boxes by using computational fluid dynamics (CFD) simulations to predict individual box parameters and total system pressure, thereby ensuring improved HVAC performance. Current Air Conditioning Contractors of America (ACCA) guidance (Group 11, Appendix 3, ACCA Manual D, Rutkowski 2009) allows for unconstrained variation in the number of takeoffs, box sizes, and takeoff locations. The only variables currently used in selecting an equivalent length (EL) are velocity of air in the duct and friction rate, given the first takeoff is located at least twice its diameter away from the inlet. This condition does not account for other factors impacting pressure loss across these types of fittings. For each simulation, the IBACOS team converted pressure loss within a box to an EL to compare variation in ACCA Manual D guidance to the simulated variation. IBACOS chose cases to represent flows reasonably correlating to flows typically encountered in the field and analyzed differences in total pressure due to increases in number and location of takeoffs, box dimensions, and velocity of air, and whether an entrance fitting is included. The team also calculated additional balancing losses for all cases due to discrepancies between intended outlet flows and natural flow splits created by the fitting. In certain asymmetrical cases, the balancing losses were significantly higher than symmetrical cases where the natural splits were close to the targets. Thus, IBACOS has shown additional design constraints that can ensure better system performance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Strategy Guideline: Partnering for High Performance Homes

High performance houses require a high degree of coordination and have significant interdependencies between various systems in order to perform properly, meet customer expectations, and minimize risks for the builder. Responsibility for the key performance attributes is shared across the project team and can be well coordinated through advanced partnering strategies. For high performance homes, traditional partnerships need to be matured to the next level and be expanded to all members of the project team including trades, suppliers, manufacturers, HERS raters, designers, architects, and building officials as appropriate. In an environment where the builder is the only source of communication between trades and consultants and where relationships are, in general, adversarial as opposed to cooperative, the chances of any one building system to fail are greater. Furthermore, it is much harder for the builder to identify and capitalize on synergistic opportunities. Partnering can help bridge the cross-functional aspects of the systems approach and achieve performance-based criteria. Critical success factors for partnering include support from top management, mutual trust, effective and open communication, effective coordination around common goals, team building, appropriate use of an outside facilitator, a partnering charter progress toward common goals, an effective problem-solving process, long-term commitment, continuous improvement, and a positive experience for all involved. This guide is intended for use by all parties associated with the design and construction of high performance homes. It serves as a starting point and features initial tools and resources for teams to start collaborating to continually improve the energy efficiency and durability of new houses.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Strategy Guideline: Partnering for High Performance Homes

High performance houses require a high degree of coordination and have significant interdependencies between various systems in order to perform properly, meet customer expectations, and minimize risks for the builder. Responsibility for the key performance attributes is shared across the project team and can be well coordinated through advanced partnering strategies. For high performance homes, traditional partnerships need to be matured to the next level and be expanded to all members of the project team including trades, suppliers, manufacturers, HERS raters, designers, architects, and building officials as appropriate. This guide is intended for use by all parties associated in the design and construction of high performance homes. It serves as a starting point and features initial tools and resources for teams to collaborate to continually improve the energy efficiency and durability of new houses.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Off-the-shelf-HVAC

Explore the source record for details and available documents.

Walker, Iain↗