Status of the LCLS-II Accelerating Cavity Production

Cavity serial production for the LCLS-II 4 GeV CM SRF linac has started. A quantity of 266 accelerating cavities has been ordered from two industrial vendors. Jefferson Laboratory leads the cavity procurement activities for the project and has successfully transferred the Nitrogen-Doping process to the industrial partners in the initial phase, which is now being applied for the production cavities. We report on the results from vendor qualification and the status of the cavity production for LCLS-II.

Daly, Ed↗

CEBAF Upgrade: Cryomodule Performance And Lessons Learned

The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

43 PARTICLE ACCELERATORS↗

RF Design Optimization for New Injector Cryounit at CEBAF

A new injector superconducting RF (SRF) cryounit with one new 2-cell, B=0.6 cavity plus one refurbished 7-cell, B=0.97, C100 style cavity has been re-designed and optimized for the engineering compatibility of existing module for CEBAF operation. The optimization of 2-cell cavity shape for longitudinal beam dynamic of acceleration from 200keV to 533keV and the minimization of transverse kick due to the waveguide couplers to less than 1 mrad have been considered. Operating at 1497MHz, two cavities has been designed into a same footprint of CEBAF original quarter cryomodule to deliver an injection beam energy of 5MeV in less than 0.27{degree} rms bunch length and a maximum energy spread of 5keV.