Design, Manufacturing, Assembly, Testing, and Lessons Learned of the Prototype 650 MHz Couplers

Six 650 MHz high-power couplers will be integrated into the prototype High Beta 650 MHz (HB650) cryomodule for the PIP-II project at Fermilab. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life-cycle, including manufacturing, assembly, testing, conditioning and the lessons learned at each stage.

43 PARTICLE ACCELERATORS↗

LCLS-II Cryomodules Production Experience and Lessons Learned Towards LCLS-II-HE Project

LCLS-II is an upgrade project for the linear coherent light source (LCLS) at SLAC. The LCLS-II linac consists of thirty-five 1.3 GHz and two 3.9 GHz superconducting RF (SRF) continuous wave (CW) cryomodules with high quality factor cavities. Cryomodules were produced at Fermilab and at Jefferson Lab in collaboration with SLAC. Fermilab successfully completed the assembly, testing and delivery of seventeen 1.3 GHz and three 3.9 GHz cryomodules. LCLS-II-HE is a planned upgrade project to LCLS-II. The LCLS-II-HE linac will consist of twenty-three 1.3 GHz cryomodules with high gradient and high quality factor cavities. This paper presents LCLS-II-HE cryomodule production plans, emphasizing the improvements done based on the challenges, mitigations, and lessons learned from LCLS-II.

43 PARTICLE ACCELERATORS↗

Status of PIP-II 650 MHz Prototype Dressed Cavity Qualification

Low-beta and high-beta sections of PIP-II linac will use nine low-beta cryomodules with four cavities each and four high-beta cryomodules with six cavities each. These cavities will be produced and qualified in collaboration between Fermilab and the international partner labs. Prior to their installation into prototype cryomodules, several dressed cavities, which include jacketed cavities, high power couplers, and tuners, will be qualified in STC horizontal test bed at Fermilab. After qualification of bare β = 0.9 cavities at Fermilab, several pre-production β = 0.92 and β = 0.61 cavities have been and are being fabricated and qualified. Procurements have also been started for high power couplers and tuners. In this contribution we present the current status of prototype dressed cavity qualification for PIP-II.

43 PARTICLE ACCELERATORS↗