Search NASA⌕ Search

Engineering topics

Prince Kalia

Publications and source records attributed to Prince Kalia.

Integrated Systems Engineering, Safety, Reliability and Risk Management – Minimizing Black Swan Events

This paper examines key barriers that can possibly inhibit safe and reliable mission execution and, in the worst case, result in loss of human life due to many unknown contributory factors that can lead to Black Swan events. Some of the representative contributory factors include decision errors, overconfidence and a host of common causes including cultural and human factors. Decisions are always easy to criticize in hindsight when more information is available after a major accident. Depending on the type and complexity of the project and/or mission, the catastrophic risks of drifting into failure can be alleviated by implementing uniquely and strategically tailored Integrated-System-of-Systems, dynamic, risk-informed decision management processes. This paper presents some of the lessons learned from James Webb Space Telescope (JWST), NASA’s Human Space Flight program, and industry that provide motivation to organizations working on mega-complex missions to prudently accomplish targeted mission success. These lessons are important for future human Lunar, Mars and Beyond missions planned to be pursued by NASA through a public-private partnership using nimble but effective safety-conscious, proven sound engineering practices including implementation of integrated risk mitigation practices.

SLS↗

A Quantitative Reliability, Maintainability and Supportability Approach for NASA's Second Generation Reusable Launch Vehicle

The United States National Aeronautics and Space Administration (NASA) is in the midst of a 10-year Second Generation Reusable Launch Vehicle (RLV) program to improve its space transportation capabilities for both cargo and crewed missions. The objectives of the program are to: significantly increase safety and reliability, reduce the cost of accessing low-earth orbit, attempt to leverage commercial launch capabilities, and provide a growth path for manned space exploration. The safety, reliability and life cycle cost of the next generation vehicles are major concerns, and NASA aims to achieve orders of magnitude improvement in these areas. To get these significant improvements, requires a rigorous process that addresses Reliability, Maintainability and Supportability (RMS) and safety through all the phases of the life cycle of the program. This paper discusses the RMS process being implemented for the Second Generation RLV program.

Fayssal M. Safie↗

Managing Risk for the James Webb Space Telescope Deployment Mechanisms: Enabling First Light

The $10 billion James Webb Space Telescope (JWST) is perhaps the most ambitious astronomy mission in NASA history and is the largest and most powerful space science telescope optimized for infrared detection. It is operating in an L2 Orbit about a million miles away from the earth. This will complement and extend the discoveries of the Hubble Space Telescope. It was so big that it had to fold origami – style to fit in the rocket and open in space.Webb’s 5-layer tennis court sized sunshield assembly(SSA) protects the telescope from the Sun’s thermal radiation enabling instruments to operate about 230degree C below 0. It relayed the first amazing picture of galaxies to the world on 12 July 2022. Webb’s unprecedented infrared sensitivity will peer back in time over 13.5 billion years to see the first galaxies born after the Big Bang.

JWST↗