Search NASASearch

Engineering topics

Pritchard, E. I.

Publications and source records attributed to Pritchard, E. I..

On-orbit checkout of satellites, volume 2. Part 3 of on-orbit checkout study

Early satellite failures significantly degrading satellite operations are reviewed with emphasis on LANDSAT D, the Technology Demonstration Satellite, the ATREX/AEM spacecraft, STORMSAT 2, and the synchronous meteorological satellite. Candidates for correction with on-orbit checkout and appropriate actions are analyzed. On-orbit checkout subsystem level studies are summarized for electrical power, attitude control, thermal control, reaction control and propulsion, instruments, and angular rate matching for alignment of satellite IRU.

Pritchard, E. I.

STS multimission modular spacecraft - A new horizon in social and industrial benefits

Economics and benefits of orbiting observatory Multi-mission Modular Spacecraft are discussed. The Space Shuttle can be used both to place these satellites in low-altitude workhorse orbits and to maintain their functioning in any of three ways - on-orbit service (by visiting the satellite with the Shuttle), Shuttle retrieval and ground refurbishment of the entire satellite, and replacement of a failed satellite with a new one. Individuals could receive information from these satellites either indirectly, by turning to a specialty television station, or directly, by calling up information on their television sets as needed. Such information, for example, might include reconnoitering interesting areas, following the weather, or locating migratory fish. Equipment and costs of the proposed Landsats and Seasats are discussed.

Cepollina, F. J.

On-orbit checkout study

The spaceborne testing equipment carried by the orbiter and the measuring equipment onboard the satellite (telemetry) is tested to verify that each is operating satisfactorily. The satellite command system is also checked. Thermal stabilization with the satellite in the orbiter shadow is achieved in six to eight hours. Satellite subsystem tests are run, and thermal control by heaters is checked. Thermal stabilization with the satellite exposed to the sun (when the orbiter is in sunlight) is again achieved in an estimated six to eight hours. Subsystem tests are again run in the hot condition, and heat rejection tests are made.

Pritchard, E. I.

BRAVO economic study of LANDSAT follow-on

The LANDSAT Follow-On satellite consists of two major systems: the instrument module and the Multi-Mission Modular Spacecraft (MMS). The instrument module contains the thematic mapper and the five-band multispectral scanner instruments. The instrument module also includes the solar array, the tracking and data relay satellite (TDRS) antenna, and the wideband data module. The MMS contains the modularized and standardized power, propulsion, attitude control, and command and data handling subsystems. The Shuttle will be supporting the LANDSAT Follow-On system. The LANDSAT Follow-On Project plans two Delta 3910 launches. The first is scheduled for 1981; the second Delta launch will occur as needed to keep one satellite operational on orbit. The second satellite will be ready six months after the first. It could be launched any time after that. Shuttle support of the system could begin in early 1983 but would be scheduled to start after the second Delta launch.

Pritchard, E. I.

STS users study (study 2.2). Volume 3: Ancillary equipment study

The multi-mission support equipment (MMSE) applicable to six payloads is studied. Tables indicate individual satellite projects to which each MMSE is applicable, and which equipments are applicable to multiple payload configurations when more than one project's payload would be flown on the STS. An estimate of the first date on which interface definition information needed by a payload project are also shown.

Pritchard, E. I.

STS users study (study 2.2). Volume 1: Executive summary

The space transportation system (STS) and ancillary equipment user studies are presented. Space shuttle data and planning requirements needed by the STS user are discussed along with the potential for common usage of multi-mission support equipment by the military and other aerospace personnel.

Pritchard, E. I.

Space shuttle/payload interface analysis (study 2.4). Volume 1: Executive summary

The space shuttle/payload interface analysis is presented. The analysis consists of the following sections: (1) payload capture and cost analysis, (2) business risk and value of operations in space analysis, and (3) payload community analysis. The primary objective of the study was to furnish a method for tracing capture/cost analyses conducted by other study groups.

Pritchard, E. I.