Search NASA⌕ Search

Engineering topics

Pyrzynski, Travis

Publications and source records attributed to Pyrzynski, Travis.

Membrane absorption process for CO2 capture

Processes and systems for the capture of CO 2 from a CO 2 -containing gas stream are provided. The CO 2 -containing gas stream is passed to a membrane contactor absorber wherein the CO 2 -containing gas contacts or passes a first side of a membrane element while a CO 2 selective solvent with a viscosity between 0.2 and 7 cP contacts, passes or flows on second side of the membrane, opposed to the first side. The CO 2 permeates through the hollow fiber membrane pores and is chemically absorbed into the solvent.

Li, Shiguang↗

Pilot Test of a Nanoporous, Super-hydrophobic Membrane Contactor Process for Post-combustion CO 2 Capture

GTI Energy and Air Liquide Advanced Separations (ALaS) have been developing a novel hollow fiber membrane contactor (HFMC) technology for post-combustion CO 2 capture. The process combines advantageous features of both absorption and membrane-based separation processes to separate CO 2 from flue gas cost-effectively. The key component of the HFMC technology is the super-hydrophobic, porous hollow fiber, which is made from polyether ether ketone (PEEK). Compared to conventional absorption/desorption technologies, the critical advantage of the HFMC process is the high contact surface area provided by the hollow fibers enabling an increased volumetric mass-transfer rate. In the PEEK HFMC process, the specific surface area has been increased by an order of magnitude over structurally packed or trayed columns, resulting in compact systems with small footprints.

20 FOSSIL-FUELED POWER PLANTS↗

A Novel Catalytic Membrane Reactor for DME Synthesis from Renewable Resources

Production of liquid fuels or chemicals from CO 2 (captured from the air or flue gases) and renewable hydrogen presents a new approach to producing clean fuels domestically. While significant progress has been made in the area of renewable electricity generation from solar and wind, a large gap remains with respect to the production of renewable liquid fuels/chemicals. Other processes for producing liquid fuels/chemicals from renewable electricity are constrained by thermodynamic limitations, making them prohibitively expensive and impractical. The team is overcoming these limitations and developing catalytic membrane reactor processes with high yields and low energy penalties. Supported by the Advanced Research Projects Agency-Energy (ARPA-E) of the US Department of Energy (DOE), GTI Energy and partners have been developing a technology for the production of renewable dimethyl ether (DME) from carbon dioxide (CO 2 ) and renewable hydrogen (H 2 ) using a novel catalytic membrane reactor and demonstration of this system at a scale of 1 kg/day. DME is a clean-burning, non-toxic fuel with a high cetane value (55-60), making it an excellent diesel alternative. DME can be stored as a liquid under moderate pressure, eliminating the need for the high-pressure containers used for CNG or cryogenics, as in the case of LNG. DME is also approved as a renewable fuel under the U.S. Environmental Protection Agency’s Renewable Fuels Standard (RFS), making it eligible for Renewable Identification Numbers (RINs) credits. By producing DME through the catalytic conversion of captured CO 2 and renewable H 2 , this process will produce renewable liquid transportation fuel and a means of large-scale utilization of captured CO 2 . In the DME synthesis process, CO 2 and H 2 are fed to a hollow fiber catalytic membrane reactor at 300-600 psig that contains a bi-functional catalyst that combines two reactions, methanol synthesis (CO 2 + 3H 2 → CH 3 OH + H 2 O) and methanol dehydration (2CH 3 OH → CH 3 OCH 3 + H 2 O), into a one-step process to produce DME. The bifunctional catalyst converts methanol to DME, enabling higher overall CO 2 conversion. A Cu/ZnO/ZrO 2 /Al 2 O 3 (CZZA) catalyst is used for methanol synthesis and is coupled with a zeolite catalyst H-ZSM-5 for dehydration. This one-step process intensifies a process that would otherwise require multiple reaction steps. However, combining these two reactions results in increased water production which inhibits catalytic activity. Here, the Na + -gated, water-transport membrane (Science, vol. 367, pp. 667, 2020), removes water in situ, shifting the thermodynamic equilibrium towards product formation while decreasing kinetic inhibition from water adsorption onto the catalyst surface. The Na + gated, water-transport nanochannel membrane showed H 2 O/CO 2 selectivity of 560 at 250 °C and 300 psig for H 2 O/CO 2 /CO/H 2 /MeOH gas mixtures. The selectivities of H 2 O/H 2 , H 2 O/CO, and H 2 O/MeOH were 190, 170, and 80, respectively. In a laboratory-scale membrane reactor, DME synthesis testing using this membrane, a DME production rate of 440 g DME /kg cat /h was achieved at 260 °C and 550 psig. Compared to the packed bed reactor, the CO 2 conversion and DME production rate in the membrane reactor were 80% and three times higher, respectively. A prototype test system (1 kg/day) was designed, constructed, and tested. A DME production rate of 1.31 kg/day and a DME productivity of 360 g/h/kg were achieved in the prototype membrane reactor. Good stability was demonstrated during 150-h continuous operation and multiple startups/shutdowns tests.

10 SYNTHETIC FUELS↗

Energy efficient membrane-based process for CO 2 capture

Processes and systems for the energy efficient capture of CO 2 from a flue gas stream such as produced or resulting from power plant operation, are provided. The processes and systems integrate the use of high CO 2 /N 2 selectivity membranes and high CO 2 flux membranes, to capture CO 2 . Useful membranes can desirably be graphene oxide-based membranes.

Li, Shiguang↗

Hybrid Membrane/Absorption Process for Post-combustion CO2 Capture

This report summarizes scientific/technical progress made for bench-scale membrane contactor technology for post-combustion CO2 capture from DOE Contract No. DE-FE-0004787. Budget Period 1 (BP1) membrane absorber, Budget Period 2 (BP2) membrane desorber and Budget Period 3 (BP3) integrated system and field testing studies have been completed successfully and met or exceeded the technical targets (≥ 90% CO2 removal and CO2 purity of 97% in one membrane stage). Significant breakthroughs are summarized below: BP1 research: The feasibility of utilizing the poly (ether ether ketone), PEEK, based hollow fiber contractor (HFC) in combination with chemical solvents to separate and capture at least 90% of the CO2 from simulated flue gases has been successfully established. Excellent progress has been made as we have achieved the BP1 goal: ≥ 1,000 membrane intrinsic CO2 permeance, ≥ 90% CO2 removal in one stage, ≤ 2 psi gas side pressure drop, and ≥ 1 (sec)-1 mass transfer coefficient. Initial test results also show that the CO2 capture performance, using activated Methyl Diethanol Amine (aMDEA) solvent, was not affected by flue gas contaminants O2 (~3%), NO2 (66 ppmv), and SO2 (145 ppmv). BP2 research: The feasibility of utilizing the PEEK HFC for CO2-loaded solvent regeneration has been successfully established High CO2 stripping flux, one order of magnitude higher than CO2 absorption flux, have been achieved. Refined economic evaluation based on BP1 membrane absorber and BP2 membrane desorber laboratory test data indicate that the CO2 capture costs are 36% lower than DOE’s benchmark amine absorption technology. BP3 research: A bench-scale system utilizing a membrane absorber and desorber was integrated into a continuous CO2 capture process using contactors containing 10 to 20 ft2 of membrane area. The integrated process operation was stable through a 100-hour laboratory test, utilizing a simulated flue gas stream. Greater than 90% CO2 capture combined with 97% CO2 product purity was achieved throughout the test. Membrane contactor modules have been scaled from bench scale 2-inch diameter by 12-inch long (20 ft2 membrane surface area) modules to 4-inch diameter by 60-inch long pilot scale modules (165 ft2 membrane surface area). Pilot scale modules were tested in an integrated absorption/regeneration system for CO2 capture field tests at a coal-fired power plant (Midwest Generation’s Will County Station located in Romeoville, IL). Absorption and regeneration contactors were constructed utilizing high performance super-hydrophobic, nano-porous PEEK membranes with CO2 gas permeance of 2,000 GPU and a 1,000 GPU, respectively. Field tests using aMDEA solvent achieved greater than 90% CO2 removal in a single stage. The absorption mass transfer coefficient was 1.2 (sec)-1, exceeding the initial target of 1.0 (sec)-1. This mass transfer coefficient is over one order of magnitude greater than that of conventional gas/liquid contacting equipment. The economic evaluation based on field tests data indicates that the CO2 capture cost associated with membrane contactor technology is $54.69 (Yr 2011$)/tonne of CO2 captured when using aMDEA as a solvent. It is projected that the DOE’s 2025 cost goal of $40 (Yr 2011$)/tonne of CO2 captured can be met by decreasing membrane module cost and by utilizing advanced CO2 capture solvents. In the second stage of the field test, an advanced solvent, Hitachi’s H3-1 was utilized. The use of H3-1 solvent increased mass transfer coefficient by 17% as compared to aMDEA solvent. The high mass transfer coefficient of H3-1 solvent combined with much more favorable solvent regeneration requirements, indicate that the projected savings achievable with membrane contactor process can be further improved. H3-1 solvent will be used in the next pilot-scale development phase. The integrated absorption/regeneration process design and high performance membrane contactors developed in the current bench-scale program will be used as the base technology for future pilot-scale development.

Coal-Environmental Processes↗