Search NASA⌕ Search

Engineering topics

Quade, Jackson

Publications and source records attributed to Quade, Jackson.

Building a lifeboat: MSL’s uplink and installation campaign to restore a failing backup computer

Flight software updates are among the hardest andmost dangerous activities for the Mars Science Laboratory(MSL) Curiosity team. While danger is often mitigated bybackups, fallback strategies, and incremental installation withground-in-the-loop cycles which provide a safety net for theinstallation process, the software update described in this paperwas unable to use many of the common practices due to thenature of the fault addressed by the update. The MSL rover(landed August 2012) encountered a problem with one of itscomputer’s non-volatile storage chips in 2019, requiring a swapto its backup computer and an urgent software upgrade calledR-Hope. R-Hope, a lifeboat to be used in the event of primarycomputer issues, was written, tested, and sent to the rover inlightning speed of just 19 months. Multi-mission and teamcoordination allowed the 49 flight software image files to beuplinked to the rover over a 6-week period, using multiple pathsand backup options for speedy delivery. In the end, the RHopesoftware upgrade returned the computer to operation asa backup flight computer. The flight software transition wasdesigned to impact science return as little as possible, and installationplans included science activities for the majority of MSLinstruments. This paper describes the uplink and installationcampaigns for R-Hope, and discusses the notable lessons learnedby the operations team.

Byrne, DJ↗

Communications with Curiosity during solar conjunction

This study examines the methodology for operating and communicating with NASA's Curiosity Rover (MSL) during the 2019 solar conjunction. For MSL, solar conjunction occurs when the viewing angle between the Sun and Mars from Earth's perspective falls below 3 degrees, which occurs roughly every two Earth years and lasts for about two weeks. This presents a challenge for engineers operating a vehicle on Mars because the degraded signal to noise ratio disrupts data flow between Earth and the spacecraft. As a result, operators designate a command moratorium in which no commands are sent to the rover and instead design long-term plans that are uplinked weeks in advance (rather than the nominal case of daily uplinks). Coordinating communications with the rover leading up to and following conjunction requires negotiations with several orbiters, another lander, and the Deep Space Network (DSN) each with their own set of constraints. It is the Strategic Comm Planning T coordination, which acts as a baseline for the conjunction Comm team faced additional complications such as the arrival of two new spacecraft at Mars - Roscosmos ExoMars Trace Gas Orbiter (TGO).

Laubach, Sharon↗