Search NASA⌕ Search

Engineering topics

Rajput-Ghoshal, Renuka

Publications and source records attributed to Rajput-Ghoshal, Renuka.

Comparison of Multi-Scale Nonlinear and Conventional Linear Methods for Stress Analysis of Nb 3 Sn Superconducting Magnets

Here this is an extension of the work on a multi-scale nonlinear procedure that demonstrated how to conduct nonlinear stress analysis of Nb 3 Sn superconducting accelerator magnets. The nonlinear procedure uses measured stress-strain curves of annealed copper, Nb 3 Sn strands and coil samples as inputs, which reduces the number of assumptions made for material properties—key uncertainties of any engineering analysis. The results from nonlinear analysis, semi-nonlinear analysis, and linear analysis of the same QFFB2 Nb 3 Sn quadrupole magnet under the same temperature and loads, were compared and discussed. The comparison illustrates that nonlinear stress analysis is significantly more accurate than other methods. As the superconducting coil block is a complex, composite material, it would be inadequate to assume the whole coil block to be linear, either isotropic or orthotropic. It is imperative to conduct nonlinear analysis by simulating the superconducting coil to the level of detail of the individual cables and individual strands. The nonlinear stress analysis procedure can be used to simulate not only Nb 3 Sn magnets, but also NbTi and HTS magnets.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

High-Field Design Concept for Second Interaction Region of the Electron-Ion Collider

Efficient realization of the scientific potential of the Electron Ion Collider (EIC) calls for addition of a future second Interaction Region (2nd IR) and a detector in the RHIC IR8 region after the EIC project completion. The second IR and detector are needed to independently cross-check the results of the first detector, and to provide measurements with complementary acceptance. The available space in the existing RHIC IR8 and maximum fields achievable with NbTi superconducting magnet technology impose constraints on the 2nd IR performance. Since commissioning of the 2nd IR is envisioned in a few years after the first IR, such a long time frame allows for more R&D on the Nb₃Sn magnet technology. Thus, it could provide a potential alternative technology choice for the 2nd IR magnets. Presently, we are exploring its potential benefits for the 2nd IR performance, such as improvement of the luminosity and acceptance, and are also assessing the technical risks associated with use of Nb₃Sn magnets. In this paper, we present the current progress of this work.

43 PARTICLE ACCELERATORS↗

Detector Solenoid Compensation for the Electron-Ion Collider

The central detector in the present EIC design includes a 4 m long solenoid with an integrated strength of up to 12 Tm. The electron beam passes on-axis through the solenoid, but the hadron beam has an angle of 25 mrad. Thus the solenoid couples horizontal and vertical betatron motion in both electron and hadron storage rings, and causes a vertical closed orbit excursion in the hadron ring. The solenoid also couples the transverse and longitudinal motions of both beams, when crab cavities are also considered. In this paper, we present schemes for closed orbit correction and coupling compensation at the IP, including crabbing.

43 PARTICLE ACCELERATORS↗

General Failure Modes and Effects Analysis for Accelerator and Detector Magnet Design at JLab

The aim of this article is to develop a risk management procedure, which could be applied to the magnet design process, for both superconducting and normal magnets at the Jefferson Laboratory (JLab). This procedure allowed us to identify the key risks at each of the critical phases of design and propose procedures, tests, and checks to mitigate each risk. In this article, we present a qualitative and quantitative risk management procedure commonly referred to a “failure modes and effects analysis.” As part of this procedure, we calculated a risk priority number (RPN) for each activity of the process, identified the most critical activities and proposed mitigation activities, which in turn resulted in a revised RPN. Additionally, another benefit of this procedure was the identification of appropriate “control and hold” points within the design process, which allowed one to review and approve a particular outcome before proceeding to the next sequential activity.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Interactions Observed Between Torus and Solenoid Superconducting Magnets at JLab

The Jefferson Lab 12 GeV Upgrade of Experimental End Station Hall B required a new detector system that would be more sensitive to forward going particles and able to handle higher luminosity. This new detector is CLAS12 and includes two superconducting iron-free magnets – a torus and an actively-shielded solenoid. The torus magnet consists of 6-trapezoidal racetrack-type coils while the solenoid is an actively shielded 5 T magnet. The torus and the solenoid are located in close proximity to one another and are surrounded by sensitive particle detectors. In this work, the torus and solenoid, operating at 3770 A and 2416 A respectively, were commissioned successfully and are operating normally. This paper presents observed electromagnetic interactions which include induced static mechanical loads and inductive coupling as well as a summary of some of the cryogenic interactions and how they are mitigated.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Optimization of an Interaction Region Quadrupole Magnet for a Future Electron-Ion Collider at JLab

The Jefferson Lab Electron Ion Collider (JLEIC) is a proposed new machine for nuclear physics research. It uses the existing CEBAF accelerator as a full energy injector to deliver 3 to 11 GeV electrons into a new electron collider ring. An all new ion accelerator and collider complex will deliver up to 200 GeV protons. The machine has luminosity goals of 10 34 cm -2 sec -1 . The whole detector region including forward detection covers about 80 meters of the JLEIC complex. The lattice file for the machine has changed to accommodate the higher energy; this change requires all the magnets in the interaction region to change. This paper will describe the requirements for both the ion and electron beam superconducting magnets around the interaction point. All the Final Focusing Quadrupole (FFQ) magnets now have preliminary designs. This paper will describe the optimization process for one of these FFQs. The optimization is performed using the optimization module of SIMULIA Opera FEA and compared with ROXIE. An analytical design tool has also been developed to estimate the peak field in the coils. The quadrupole has been optimized for peak field in the coils, and magnetic length.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗