2022 Through April 2023 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, Interim Measures and Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (Swmu 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from January 2022 through April 2023 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building (VAB) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The following summaries briefly describe areas within SWMU 056 identified by historical site investigation activities where groundwater monitoring and remedial actions have been implemented to date.

VOCs↗

In Situ Chemical Reduction Interim Measures Work Plan Hot Spot 3 Mobile Launcher Platform Rehabilitation Sites / Vehicle Assembly Building Area (SWMU 056) Kennedy Space Center, Florida

This document presents the design details of an In Situ Chemical Reduction (ISCR) Interim Measures Work Plan for Hot Spot 3 within Mobile Launcher Platform Rehabilitation Sites/Vehicle Assembly Building Area, Solid Waste Management Unit (SWMU) 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The interim measures (IM) treatment zone encompasses an area identified as the High Concentration Plume (HCP), which is defined as the area with chlorinated volatile organic compound (CVOC) groundwater concentrations greater than their respective Natural Attenuation Default Concentration (NADC). The objective of the IM is to remove CVOC mass within the treatment area to levels that facilitate a transition to natural attenuation monitoring. The IM design consists of the selected ISCR amendment, Provect-IR, which is a mixture of solid reagents in a single product that promotes enhanced reductive dechlorination and ISCR. ProvectIR includes natural antimethanogenic compounds; multiple hydrophilic, nutrient-rich organic carbon sources; zero valent iron; chemical oxygen scavengers; and vitamin and mineral sources. The proposed treatment area for this IM encompasses less than 1 acre and includes three vertical treatment intervals to reach the NADC plumes that vary per CVOC and depth: 4 to 10 feet below land surface (bls), 10 to 18 feet bls, and 42 to 52 feet bls. The amendment will be distributed through 16 injection points (IP01 through IP16) using dosing rates ranging from 0.4% to 0.6% of soil mass within the treatment interval and a 15% or 20% slurry strength. Dosage rates and slurry strength are based on groundwater geochemistry, soil characteristics, and contaminant concentrations. To aid in the evaluation of the ISCR IM performance, six performance monitoring wells will be installed following injections and sampled semiannually. CVOC parameters will be sampled until concentrations reduce to below their NADC. Underground Injection Control parameters will be sampled until concentrations decrease to background levels or to levels that meet respective groundwater standards. Sampling frequency will be evaluated annually and modified as needed. The path forward for the ISCR IM implementation includes preparing the IM Implementation Work Plan, ISCR injections, monitoring well installation, performance monitoring, and reporting.

Randall K. Sillan↗

2021 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, and Interim Groundwater Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (SWMU 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from January 2021 through December 2021 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building (VAB) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The following summaries briefly describe areas within SWMU 056 identified by historical site investigation activities where groundwater monitoring and remedial actions have been implemented to date.

Randall K. Sillan↗

2019 Corrective Measures Implementation and Intermim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, and Interim Groundwater Monitoring Mobile Launch Platform / Vehicle Assembly Building Area (SWMU 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from May 2019 through December 2019 at the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida.

MOBILE LAUNCH PLATFORM / VEHICLE ASSEMBLY BUILDING↗