Preparing the JWST Observatory for Science Observations

The James Webb Space Telescope (JWST) is a large (6.5 m) near-and mid-infrared telescope scheduled for launch in 2021. JWST will be used to explore fundamental questions in astrophysics and planetary science, including the evolution of galaxies, the first light of stars, the formation of stars and planets as well as the characterization of exoplanets. To achieve these scientific goals, NASA and its international partners, the Canadian Space Agency (CSA) and the European Space Agency (ESA), have developed four science instruments for JWST and have prepared detailed commissioning plans for each. The NASA Project Science team has also outlined activities to characterize the performance of the Observatory as a whole. These activities include: 1) monitoring of the instrument and telescope cooldown for contamination mitigation; 2) measurements of straylight and other backgrounds for validation of the JWST stray light models as well as instrument background subtraction algorithms; 3) characterization of optical thermal distortion between its hot and cold telescope pointings within the observable field of regard and 4) trending of observatory performance parameters. Each of these activities has been planned in close collaboration with the observatory wavefront, commissioning planning, and science instrument teams. Here we present the plans for these activities, the expected results and how they will impact future guest observer (GO) proposals and JWST science community

Erin C Smith↗

The James Webb Space Telescope Mission Status

The James Webb Space Telescope (Webb) is a large, infrared space telescope that recently completed its on-orbit commissioning activities and will now embark on the first year of approved science. Its architecture includes many first-of-its-kind innovations for space, including a segmented primary mirror that is 6.6 m in diameter and a 5-layer sunshield used to passively cool the telescope and its four science instruments. Although Webb had an extensive test program, the system-level performance often relied on predictions based on integrated modeling, using conservative factors for the model uncertainties and primarily focusing on evaluating the performance requirements at end of life. A set of commissioning activities were designed for a system-level characterization of the performance. This proceeding will provide the status of the mission, including a discussion of the major events, on-orbit system performance, and early science highlights.

Michael McElwain↗