Search NASA⌕ Search

Engineering topics

Ranjbar, Vahid

Publications and source records attributed to Ranjbar, Vahid.

An Induction-Type Septum Magnet for the Hadron and Electron Injection of the EIC Complex

The design of the electron Ion Collider (EIC) project is under way to be built at the Brookhaven National Laboratory (BNL) with the collaboration of the Thomas Jefferson National Accelerator Facility (TJNAF). The Rapid Cycling Synchrotron (RCS) which is part of the EIC accelerator complex will accelerate the electron beam up to 18 GeV, and the beam will be injected into the Electron Storage Ring (ESR) to collide with the hadron beam circulating in the Hadron Storage Ring (HSR) which is a modified version of the Relativistic Heavy Ion Collider (RHIC). All three synchrotrons will be located in the same tunnel. This technical note provides information on the latest electromagnetic design of the induction-type septum magnet which will be employed by EIC to Inject the beam into the HSR and RCS and also extract the beam from the RCS.

43 PARTICLE ACCELERATORS↗

The EIC accelerator: design highlights and project status

The design of the electron-ion collider (EIC) at Brookhaven National Laboratory is well underway, aiming at a peak electron-proton luminosity of 10e+34 cm^-1·sec^-1. This high luminosity, the wide center-of-mass energy range from 29 to 141 GeV (e-p) and the high level of polarization require innovative solutions to maximize the performance of the machine, which makes the EIC one of the most challenging accelerator projects to date. The complexity of the EIC will be discussed, and the project status and plans will be presented.

43 PARTICLE ACCELERATORS↗

Progress on the normal conducting magnets for the Electron-Ion Collider

The electron-ion collider (EIC) at Brookhaven National Laboratory (BNL) is designed to deliver a peak luminosity of 1e+34 1/cm2 1/sec. The EIC will take advantage of the existing Relativistic Heavy Ion Collider (RHIC) facility. Two additional rings will be installed: an electron storage ring (ESR) and a rapid cycling electron synchrotron ring (RCS).This paper presents an update on the normal conducting magnet designs required for both the ESR and RCS rings. The ESR will store polarized electron beams up to 18 GeV and utilizes a triplet of dipole magnets to increase the emittance at 5 GeV and generate excess bending to create additional radiation damping to allow a larger beam-beam tune shift. The RCS will accelerate single bunches of spin-polarized electrons at various energies from 5 GeV to 18 GeV, with a ramp rate of 100 ms and 1 Hz repetition rate. Both rings require dipole, quadrupole and sextupole magnets with different specifications.

43 PARTICLE ACCELERATORS↗

Design Status of the Electron-Ion Collider

The Electron-Ion Collider is gearing up for "Critical Decision 2", theproject baseline with defined scope, cost and schedule.Lattice designs are beingfinalized, and preliminary component design is being carried out. Beam dynamicsstudies such as dynamic aperture optimization, instability and polarizationstudies, and beam-beam simulations are continuing in parallel. We report onthe latest developments and the overall status of the project, and presentthe plans for future activities.

43 PARTICLE ACCELERATORS↗

Laser-Induced Polarization for the Electron-Ion Collider

The use of an intense ultrashort laser pulse to induce electron polarization has been proposed in existing literature. Utilizing the Python programming language, a code has been developed to recreate the local constant crossed field approximation (LCFA) with the aim of determining values for transverse polarization given a nonzero initial polarization. It has been shown that over multiple laser shots, lower values of the quantum efficiency parameter are associated with higher transverse polarization output, yet require a greater number of shots to attain maximal polarization. Moreover, the quantum efficiency parameter has been rede fined as a function of intensity for Ti:sapphire laser necessary to induce polarization in the Electron-Ion Collider.

43 PARTICLE ACCELERATORS↗

The feasibility of electron beam slip stacking in EIC Rapid Cycling Synchrotron

Announced in 2020, the Electron Ion Collider will be constructed at Brookhaven National Lab (BNL) by modifying the existing Relativistic Heavy Ion Collider (RHIC) facility. Among the alterations include the installation of an electron storage ring (ESR) and a Rapid Cycling Synchrotron (RCS) in the existing RHIC tunnel. The RCS will accelerate polarized electrons from 400MeV to 5GeV,10GeV and 18 GeV and transfer it to the ESR. The LINAC source produces 7nC per shot meanwhile the RCS requires 28nC per bunch of charge. Currently, it is planned to inject 4 bunches into adjacent RF buckets and then merge them into a single RF bucket using fields from several RF cavities. However, this requires a kicker with an exceptionally fast rise and fall time to inject into adjacent RF bucket without disturbing the existing circulating bunch and this requires harmonic RF kickers. Our study focuses on determining the feasibility of an alternate particle injection method that will utilize slip stacking, a method that accommodates the circulation of multiple beams with different momentum in the same azimuthal space of the beampipe, thus permitting the accumulation of charge from several shots into a single RF bucket. We find the momentum aperture required for slip stacking using current RCS beam parameters exceeds the RCS’s momentum deviation limit,dp/p = 1.5%. We determine the appropriate dimensions the beam must have to enable slip stacking and conduct a literature review of slip stacking schemes in other facilities. The literature review tentatively indicates that slip stacking has not been attempted on electron beams at a major accelerator facility.. The slip stacking approach has the potential to save the cost of the harmonic RF kicker and bunch merging cavities.

43 PARTICLE ACCELERATORS↗

The eRHIC spin rotator and the beam optics of the 400 MeV transfer line to RCS

The 400 MeV LINAC 1 of the proposed eRHIC collider 1 is the first acceleration stage of the 18 GeV electron accelerator. The second acceleration stage of the electron accelerator is the Rapid Cycling Synchrotron (RCS), which can increase the energy of the electron bunches to 18 GeV and subsequently extract transfer and inject the 18 GeV electron bunches into the 18 GeV electron Storage Ring (SR) to collide with the hadron bunches of the existing (Relativistic Heavy Ion Collider (RHIC)) accelerator. This paper describes the beam optics of the transfer line between the 400 MeV LINAC and the RCS accelerator (LtRCS). The function of the LtRCS line is twofold, first to transfer the electron beam from the exit of the 400 MeV LINAC to the injection point of the RCS 1 and second to rotate the stable spin direction of the polarized electrons from the longitudinal direction to the vertical. A detailed description of the constraints to be satisfied by the LtRCS transfer line will be given. Finally, a section will also be devoted to discuss the spin rotator 2 .

43 PARTICLE ACCELERATORS↗

Coherent Electron Cooling Demonstration Experiment

Coherent electron cooling (CEC) is considered to be on of potential candidates capable of cooling high-energy, high-intensity hadron beams to very small emittances. It also has a potential to significantly boost luminosity of high-energy hadron-hadron and electron-hadron colliders. In a CEC system, a perturbation of the electron density caused by a hadron is amplified and fed back to the hadrons to reduce the energy spread and the emittance of the beam. Following the funding decision by DoE office of Nuclear Physics, we are designing and building coherent electron cooler for a proof-of-principle experiment at RHIC to cool 40 GeV heavy ion beam. In this paper, we describe the layout of the CeC installed into IP2 interaction region at RHIC. We present the design of the CeC cooler and results of preliminary simulations.

Litvinenko, Vladimir N.↗