Search NASA⌕ Search

Engineering topics

Rapport, Ari

Publications and source records attributed to Rapport, Ari.

Carbon Emissions in a Typical New Production Home: A Case Study

This report is intended to serve as a foundational document for residential construction executives and leadership teams to understand how a typical home currently performs relative to building decarbonization goals set for 2030 and 2050. The intent is to help homebuilders benchmark their current performance and better understand the largest sources of carbon emissions in their homes. There is a need to understand and assess current performance against net zero carbon goals to define achievable paths forward. This case study highlights opportunities for innovation and carbon reduction through advanced technologies and material choices.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

TP84227_FS83049_OPData

The data set represents the data used for the analysis of operational carbon emissions for a carbon case study of a typical production builder's home in two common climate zones, Climate Zone 2 (Warm) and CZ 5 (Cold). A data set for embodied carbon emissions analysis for the same project is in a separate workbook.

99 GENERAL AND MISCELLANEOUS↗

TP84227_FS83049_ECData

The data set represents the data used for the analysis of embodied carbon emissions for a carbon case study of a typical production builder's home in two common climate zones, Climate Zone 2 (Warm) and CZ 5 (Cold). A data set for operational carbon emissions analysis for the same project is in a separate workbook.

99 GENERAL AND MISCELLANEOUS↗

Novel, Simplified Air Delivery System Design Gets Commercialized

Typical air delivery systems require contractors to design systems that are complex, difficult to integrate into the framing and structural components of a home, and often do not meet the optimization demands of newer energy-efficient homes. This complex process can be a burden to already strained construction labor costs. However, a new technology simplifies duct system design to improve comfort and eliminate sources of installation error for residential air delivery systems.

30 DIRECT ENERGY CONVERSION↗

Novel, Simplified Air Delivery System Design Gets Commercialized

Typical air delivery systems require contractors to design systems that are complex, difficult to integrate into the framing and structural components of a home, and often do not meet the optimization demands of newer energy-efficient homes. This complex process can be a burden to already strained construction labor costs. However, a new technology simplifies duct system design to improve comfort and eliminate sources of installation error for residential air delivery systems.

Building America↗

A Plug-and-Play Duct System Evaluation

This report describes an air distribution system composed of a series of uniformly-sized ducts that terminate in rooms throughout the home and return to a central manifold, similar in fashion to a “home-run” cross-linked polyethylene plumbing system. With a well-designed manifold, each duct receives an equal static pressure potential for airflow from the air handling unit, and the number of needed ducts for each room are simply attached to fittings located on the manifold; in this sense, the system is plug-and-play (PnP). As indicated, all ducts in the PnP system are identical in size and small enough to fit in the ceiling and wall cavities of a house (i.e., less than 3.5-in. outer diameter). These ducts are also more appropriately sized for the lower airflow requirements of modern, energy-efficient homes; therefore, the velocity of the air moving through the duct is between that of conventional duct systems (approximately 700 ft/min) and high-velocity systems (more than 1,500 ft/min) on the market today. The PnP duct system uses semi-rigid plastic pipes, which have a smooth inner wall and are straightforward to install correctly, resulting in a system that has minimal air leakage. However, plastic ducts are currently not accepted by code for use in residential buildings; therefore, the project team considered other duct materials for the system that are currently accepted by code, such as small-diameter, wirehelix, flexible ductwork.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Spray Foam Exterior Insulation with Stand-Off Furring - New York

IBACOS and Green Homes America 1 (GHA) collaborated with the New York State Energy Research and Development Authority (NYSERDA) Advanced Buildings Program to research a variation of a commercial curtain wall assembly for residential construction as part of a comprehensive whole-house deep energy retrofit (DER) package. The advantages of this strategy include minimizing the physical connections to each individual existing wall stud, using closedcell spray foam to encapsulate existing siding materials including lead paint, and creating a vented rain screen assembly to promote drying. As Moore (2011) states, "Closed-cell foam acts as air-sealing, insulation, and secondary drainage plane..." Field installations on a limited number of houses indicate that the incremental cost when installed as part of a typical siding and window replacement job adds approximately $10/ft2 of wall area. 2 x 4 framing members were attached to the wall at band joists and top plates using "L" clips, and spray foam was used to insulate the wall after the framing was installed. Windows were installed as the framing was put up, including extension jambs. Key lessons learned include the following: (1) The installed cost of the spray foam system was comparable to the installed cost of the rigid foam and furring strips. (2) Spray foam should be applied in such a way that it locks the framing members in place before the remaining foam is installed in the field of the wall. The spray foam has a tendency to move the new wall framing as it expands. Best practice is to "picture frame" the wall framing with spray foam and then apply the spray foam in the field of each bay. (3) Variations in the existing siding conditions must be accounted for when attaching the ledger boards and wall framing. A best practice is to uniformly shim the ledger boards off the walls so the new framing is a uniform distance from the ledger boards and the inside surface of the interior framing. This is important primarily for window and door installation and the associated extension jambs and trim. (4) From a sequencing perspective, it is advantageous to replace the windows at the same time as the exterior walls are being built. This requires a crew that can perform a number of different tasks (e.g., framing, flashing, window install, trim carpentry) and does not lend itself to subcontracting this approach piecemeal (e.g., framing subcontractor, window installer, drainage plane installer, trim carpenter). (5) Application of the brackets and associated fastener screws was more time consuming than anticipated. (6) It is important for the spray foam contractor to perform all preparatory work, which in this case included placing plastic over the windows and exposed foundation to minimize or eliminate the possibility of damage due to overspray.

Array↗

Moisture Risk in Unvented Attics Due to Air Leakage Paths - Minneapolis Minnesota

IBACOS completed an initial analysis of moisture damage potential in an unvented attic insulated with closed-cell spray polyurethane foam. To complete this analysis, the research team collected field data, used computational fluid dynamics to quantify the airflow rates through individual airflow (crack) paths, simulated hourly flow rates through the leakage paths with CONTAM software, correlated the CONTAM flow rates with indoor humidity ratios from Building Energy Optimization software, and used "Warme und Feuchte instationar Pro two-dimensional modeling" to determine the moisture content of the building materials surrounding the cracks. Given the number of simplifying assumptions and numerical models associated with this analysis, the results indicate that localized damage due to high moisture content of the roof sheathing is possible under very low airflow rates. Reducing the number of assumptions and approximations through field studies and laboratory experiments would be valuable to understand the real-world moisture damage potential in unvented attics.

Array↗

Mini-Split Heat Pump Evaluation and Zero Energy Ready Home Support

This project was created from a partnership between the U.S. Department of Energy's (DOE's) Building America research team, IBACOS, Inc., and a production builder of high-performance homes called Imagine Homes, which is located in San Antonio, Texas-a hot-humid climate. The primary purpose of this project was to evaluate the performance of a multihead mini-split heat pump (MSHP) space-conditioning system in maintaining uniform comfort in an occupied test house. My Design - PV: Test house design characteristics, with installed PV system DESIGN - Occupied Test House with PV: Design used for one occupied test house including PV STRUCTURE - Platinum Court San Antonio, TX: Occupied test house in 2013

Array↗

Imagine Homes New Construction Occupied Test House

This report summarizes the research findings of a long-term monitoring plan to evaluate the performance of an energy-efficient home constructed in 2010 in San Antonio, Texas. Monitoring of the energy use, energy generation, and temperature conditions for this project occurred between July 2010 and October 2011. The heating, ventilation, and air conditioning system effectively maintained acceptable temperatures and humidity levels in peak cooling and heating and non-peak operating periods. Discrepancies were found between modeled and actual energy use values, with actual space cooling energy use closest to the corresponding modeled value. Energy consumption predicted for lighting, appliances, and miscellaneous electrical loads was significantly higher than measured amounts, and energy consumption predicted for cooling was significantly lower than measured amounts. A high amount of the 1,600 kWh of PV-generated electricity produced annually was sent to the electric grid every month. The solar thermal DHW system was the main source of hot water for most of the year and performed well; during summer, electrical use by the backup system was rare.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Imagine Homes New Construction Occupied Test House

This report summarizes the research findings of a long-term monitoring plan to evaluate the performance of an energy-efficient home constructed in 2010 in San Antonio, Texas. Monitoring of the energy use, energy generation, and temperature conditions for this project occurred between July 2010 and October 2011. The home achieves a source energy savings of 32% without the installed photovoltaic (PV) system and 44% savings with the PV system contribution relative to the Building America House Simulation Protocols. This report summarizes the research findings related to heating, ventilation, and air conditioning system performance, estimated and actual energy use of key subsystems, electricity generation by the PV system, and performance of the solar thermal domestic hot water system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗