ROAM: A Remotely Operated Accelerator Monitor

Monitoring accelerators in operation is a well known challenge due to the radiation environment. However, there are significant benefits in being able to deploy particular sensors in specific locations of accelerator enclosures for monitoring or troubleshooting purposes. Learning from experience at other labs, we used Commercial Off The Shelf (COTS) components and an open source robot control software framework (ROS) to build a remotely controlled robot platform including a standard suite of instruments such as cameras, LIDAR, and ultrasound, with the ability to incorporate other ad-hoc sensors for specific measurements, such as a Gamma radiation monitor. Special attention was given to the robot's ability to maintain safety in the high risk environment of an accelerator, with multiple failure contingencies in place to ensure collision free operation. Testing was performed to prove the platform's viability and showcase its capability for accelerator monitoring.

Thayer, Thomas C.↗

LCLS-II Cryomodule and Cryogenic Distribution Control

The new superconducting Linear Coherent Light Source (LCLS-II) at the SLAC National Accelerator Laboratory will be an upgrade to LCLS, the world’s first hard X-ray free-electron laser. LCLS-II is in an advanced stage of construction with equipment for both Cryoplants as well as more than half of the 37 cryomodules onsite. Jefferson Lab (JLab) is a partner lab responsible for building half of the LCLS-II cryomodules. Hence the Low Energy Recirculation Facility (LERF) at JLab was used to stage and test LCLS-II cryomodules before shipping them to SLAC. LERF was set up to test two cryomodules at a time. LERF used LCLS-II cryogenic controls instrumentation racks, Programmable Logic Controllers (PLC) controls and Experimental Physics and Industrial Control System (EPICS) Input/Output Controllers (IOCs) with the intention to use the LERF setup to check-out and verify cryogenic controls for LCLS-II. The cryogenic controls first utilized at LERF would then be replicated for controlling all 37 cryomodules via an EPICS user interface. This paper discusses the cryogenic controls currently developed for implementation in the LCLS-II project.

43 PARTICLE ACCELERATORS↗

System and method for groundwater detection and evaluation

A system for mapping a depth of an aquifer and determining the presence and salinity of water from the aquifer and methods for using the making/using the same includes a central processor. One or more horizontal loop transmitters can be coupled to the central processor, wherein said one or more horizontal loop transmitters produce a first half-sine pulse of magnetic field at a first pulse duration for measuring the resistivity of a ground surface. The one or more horizontal loop transmitters can produce a second sequence of half-sine pulses at a second frequency for creating an excitation field for magnetic resonance sounding. A multi-turn receiver loop antenna can also be coupled to the central processor, wherein said multi-turn receiver loop antenna receives an induced magnetic field from said one or more horizontal loop transmitters that is representative of the depth of an aquifer and the salinity of the water.

47 OTHER INSTRUMENTATION↗

Design and Implementation of the LLRF System for LCLS-II

The SLAC National Accelerator Laboratory is building LCLS-II, a new 4 GeV CW superconducting (SCRF) linac as a major upgrade of the existing LCLS. The SCRF linac consists of 35 ILC style cryomodules (eight cavities each) for a total of 280 cavities. Expected cavity gradients are 16 MV/m with a loaded QL of ~ 4 x 10⁷. Each individual RF cavity will be powered by one 3.8 kW solid state amplifier. To ensure optimum field stability a single source single cavity control system has been chosen. It consists of a precision four channel cavity receiver and two RF stations (Forward, Reflected and Drive signals) each controlling two cavities. In order to regulate the resonant frequency variations of the cavities due to He pressure, the tuning of each cavity is controlled by a Piezo actuator and a slow stepper motor. In addition the system (LLRF-amplifier-cavity) was modeled and cavity microphonic testing has started. This paper will describe the main system elements as well as test results on LCLS-II cryomodules.

Serrano, Carlos↗

LLRF Control of High Loaded-Q Cavities for the LCLS-II

The SLAC National Accelerator Laboratory is planning an upgrade (LCLS-II) to the Linear Coherent Light Source with a 4 GeV CW Superconducting Radio Frequency (SCRF) linac. The nature of the machine places stringent requirements in the Low-Level RF (LLRF) system, expected to control the cavity fields within 0.01 degrees in phase and 0.01% in amplitude, which is equivalent to a longitudinal motion of the cavity structure in the nanometer range. This stability has been achieved in the past but never for hundreds of superconducting cavities in Continuous-Wave (CW) operation. The difficulty resides in providing the ability to reject disturbances from the cryomodule, which is incompletely known as it depends on the cryomodule structure itself (currently under development at JLab and Fermilab) and the harsh accelerator environment. Previous experience in the field and an extrapolation to the cavity design parameters (relatively high Q_{L}c≈ 4×10⁷ , implying a half-bandwidth of around 16 Hz) suggest the use of strong RF feedback to reject the projected noise disturbances, which in turn demands careful engineering of the entire system.

43 PARTICLE ACCELERATORS↗

Integrating a Traveling Wave Tube into an AECR-U ion source

An RF system of 500W - 10.75 to 12.75 GHz was designed and integrated into the Advanced Electron Cyclotron Resonance - Upgrade (AECR-U) ion source of the 88-Inch Cyclotron at Lawrence Berkeley National Laboratory. The AECR-U produces ion beams for the Cyclotron giving large flexibility of ion species and charge states. The broadband frequency of a Traveling Wave Tube (TWT) allows modifying the volume that couples and heats the plasma. The TWT system design and integration with the AECR-U ion source and results from commissioning are presented.

43 PARTICLE ACCELERATORS↗