Search NASA⌕ Search

Engineering topics

Rauch, J.

Publications and source records attributed to Rauch, J..

Feedback control of stored energy and rotation with variable beam energy and perveance on DIII-D

Design and testing of a new method for real-time control on DIII-D using the new voltage and perveance variation capability of DIII-D's neutral beam injection system is presented. The approach enables control of power, torque, stored energy, and rotation without requiring pulse-width modulation of the beams. Such modulations are perturbative to experiments, can cause beam reliability problems, and could potentially damage or fatigue accelerator grids, especially looking forward to active control of long-pulse devices and reactors. Here, the control algorithm accounts for beam line loss mechanisms and includes approaches that address the complexity of having three manipulated variables for each of the eight beams and compensate for the rate and magnitude limits affecting the voltage and perveance actuators. Results are presented that demonstrate the performance of the approach in the first feedback control experiments to use the expanded controllability of the DIII-D beams.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Expression of Interest: Rare Eta Decays with a TPC for Optical Photons

The REDTOP experiment is primarily intended to look for new violations of basic symmetry principles and conservation laws in particle physics. Our main focus will be on very rare decays of the η meson. From the Standard Model and other theories, such decays can provide distinct insights into the limits of conservation laws and open unique doors to new ones at branching ratio sensitivity levels typically below 10 -9 . Notably, current experimental upper limits for η decays are many orders of magnitude larger. The sensitivity goal of our experiment is expected to be better than 10 -10 for most decay modes, based on an estimated yield of more than 10 12 η mesons per year. Numerous opportunities for new physics Beyond the Standard Model will become available.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Control of power, torque, and instability drive using in-shot variable neutral beam energy in tokamaks

A first-ever demonstration of controlling power and torque injection through time evolution of neutral beam energy has been achieved in recent experiments at the DIII-D tokamak. Pre-programmed waveforms for the neutral beam energy produce power and torque inputs that can be separately and continuously controlled. Previously, these inputs were tailored using on/off modulation of neutral beams resulting in large perturbations (e.g. power swings of over 1 MW). The new method includes, importantly for experiments, the ability to maintain a fixed injected power while varying the torque. In another case, different beam energy waveforms (in the same plasma conditions) produce significant changes in the observed spectrum of beam ion-driven instabilities. Measurements of beam ion loss show that one energy waveform results in the complete avoidance of coherent losses due to Alfvénic instabilities. This new method of neutral beam operation is intended for further application in a variety of DIII-D experiments including those concerned with high-performance steady state scenarios, fast particle effects, and transport in the low torque regime. As a result, developing this capability would provide similar benefits and improved plasma control for other magnetic confinement fusion facilities.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

THE DARK ENERGY CAMERA

The Dark Energy Camera is a new imager with a 2.°2 diameter field of view mounted at the prime focus of the Victor M. Blanco 4 m telescope on Cerro Tololo near La Serena, Chile. The camera was designed and constructed by the Dark Energy Survey Collaboration and meets or exceeds the stringent requirements designed for the wide-field and supernova surveys for which the collaboration uses it. The camera consists of a five-element optical corrector, seven filters, a shutter with a 60 cm aperture, and a charge-coupled device (CCD) focal plane of 250 μm thick fully depleted CCDs cooled inside a vacuum Dewar. The 570 megapixel focal plane comprises 62 2k × 4k CCDs for imaging and 12 2k × 2k CCDs for guiding and focus. The CCDs have 15 μm × 15 μm pixels with a plate scale of 0.″263 pixel{sup −1}. A hexapod system provides state-of-the-art focus and alignment capability. The camera is read out in 20 s with 6–9 electron readout noise. This paper provides a technical description of the camera's engineering, construction, installation, and current status.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Pulsed single-blow regenerator testing

A pulsed single-blow method has been developed for testing of Stirling regenerator materials performance. The method uses a tubular flow arrangement with a steady gas flow passing through a regenerator matrix sample that packs the flow channel for a short distance. A wire grid heater spanning the gas flow channel is used to heat a plug of gas by approximately 2 K for approximately 350 ms. Foil thermocouples monitor the gas temperature entering and leaving the sample. Data analysis based on a 1D incompressible-flow thermal model allows the extraction of Stanton number. A figure of merit involving heat transfer and pressure drop is used to present results for steel screens and steel felt. The observations show a lower figure of merit for the materials tested than is expected based on correlations obtained by other methods.

Oldson, J. C.↗

Free-piston Stirling engine/linear alternator 1000-hour endurance test

The Free Piston Stirling Engine (FPSE) has the potential to be a long lived, highly reliable, power conversion device attractive for many product applications such as space, residential or remote site power. The purpose of endurance testing the FPSE was to demonstrate its potential for long life. The endurance program was directed at obtaining 1000 operational hours under various test conditions: low power, full stroke, duty cycle and stop/start. Critical performance parameters were measured to note any change and/or trend. Inspections were conducted to measure and compare critical seal/bearing clearances. The engine performed well throughout the program, completing more than 1100 hours. Hardware inspection, including the critical clearances, showed no significant change in hardware or clearance dimensions. The performance parameters did not exhibit any increasing or decreasing trends. The test program confirms the potential for long life FPSE applications.

Rauch, J.↗

Free-piston stirling engine endurance test program

The Free-Piston Stirling Engine (FPSE) has the potential to be a long-lived, highly reliable, power conversion device attractive for many product applications such as space, residential, or remote-site power. The purpose of endurance testing the FPSE is to demonstrate its potential for long life. The endurance program was directed at obtaining 1000 operational hours under various test conditions: low power, full stroke, duty cycle, and stop/start. Critical performance parameters were measured to note any change and/or trend. Inspections were conducted to measure and compare critical seal/bearing clearance. The engine performed well throughout the program, completing the 1000 hours. Hardware inspection, including the critical clearances, showed no significant change in hardware or clearance dimensions. The performance parameters did not exhibit any increasing or decreasing trends. The test program confirms the potential for long-life FPSE applications. Additional testing is planned to increase the test hours to 10,000.

Dochat, G.↗