Search NASA⌕ Search

Engineering topics

Raymond G Merrill

Publications and source records attributed to Raymond G Merrill.

Enabling Global Lunar Access for Human Landing Systems Staged at Earth-Moon L2 Southern Near Rectilinear Halo and Butterfly Orbits

NASA’s Artemis program will return astronauts to the lunar surface using a Human Landing System staged at Gateway’s 9:2 L2 southern NRHO. The current study explores global lunar access for Gateway’s baseline NRHO and a comparable butterfly orbit. Additionally, increasing transfer time and loitering in low lunar orbit are analyzed to reduce lunar surface access costs. The results show selecting the optimal staging orbit for a landing site, increasing transfer times, and leveraging low lunar orbit loiter greatly reduce performance requirements.

Zachary D May↗

Integrated Trajectory, Habitat, and Logistics Analysis and Trade Study for Human Mars Missions

Environmental Control and Life Support System (ECLSS) architecture selection has profound implications for mission cost and mass extending far beyond the ECLSS itself. Similarly, other mission architecture decisions – particularly involving transportation systems – can influence optimal ECLSS architectures. Loop closure influences requirements for water, oxygen, and other consumables. System maintainability and reliability influences spares mass and risk. System, consumables, and spares mass interact with transportation system architectures and propellant demands and propulsion element sizing. All these interactions with other systems must be considered when evaluating ECLSS options. Analyses that focus only on maximizing ECLSS loop closure – or minimizing ECLSS mass, or minimizing ECLSS life cycle cost – may lead to sub-optimal or even counterproductive system architecture and investment decisions at the mission level. For example, an ECLSS architecture that minimizes ECLSS life cycle cost but results in excessively high logistics mass could lead to significantly increased transportation system costs or make interplanetary transportation infeasible. Increased loop closure could result in higher development costs and higher mass if system/spares mass increases outweigh consumables reduction. In addition, systems mass and consumables mass are not directly comparable and have different impacts on propellant requirements, as consumables mass changes over the course of the mission. This paper presents an integrated analysis examining the overall impact of different ECLSS and transportation architectures on mass for a crewed Mars mission, including the habitat and transportation systems as well as consumables, spares, and propellant. Key observations are discussed, along with opportunities for further sensitivity analysis and model development. Overall, ECLSS development activities must consider their impacts at the mission level, as part of an integrated system, rather than in isolation.

Mars↗

Crewed Mars Mission Mode Options for Nuclear Electric/Chemical Hybrid Transportation System

NASA's Human Exploration and Operation Mission Directorate is continuing to study different concepts and options to field human Mars missions as part of NASA's Moon2Mars directive. For crewed missions to Mars, the transportation system sizing is highly dependent on the total mission duration, Mars orbit dwell time, mission concept of operations, and the chosen propulsion system. NASA has been investigating the use of low-thrust electric propulsion systems to augment high-thrust chemical propulsion system for crewed Mars mission to enable a more energy-efficient operations. Recent studies on these missions have focused on ``All-Up'' piloted mission modes in which the in-space transportation system for crew transit departs Earth with everything it needs for the roundtrip journey, with only the Mars landers and surface assets pre-deployed. This design choice was made to minimize the mission operation risk, as the crew could return safely to Earth in the event of a failure to rendezvous or other failure of any pre-deployed assets. As the Mars Architecture Team continues to investigate and understand the Mars mission trade space, alternate mission mode studies were conducted to understand their impact to the transportation system. These include pre-positioning return assets and discarding expended stages to reduce the overall system mass.

Patrick R Chai↗

Integrated Crewed Mars Mission Analysis, Part II: The Trajectory Strikes Back

Crewed missions to Mars present a challenging problem involving strong interactions between a variety of spacecraft systems. Design and architecture decisions made by one system can have powerful implications for another. Siloed subsystem development and optimization efforts are unlikely to generate optimal results for the integrated system and may lead to counterproductive investments at the mission and system level. Mismatched assumptions between different subsystems can also negatively impact the final result. Integrated systems analysis, trade studies, and sensitivity analysis are a critical element of successful Mars mission design. Previous work examined the linkages between Environmental Control and Life Support System (ECLSS) loop closure, food water content, spares Probability of Sufficiency (POS), and other factors by performing an integrated mass and cost assessment of a variety of Mars habitat and transportation system designs. This paper expands upon that work by evaluating the impact of mission duration, trajectory, and propulsion technology alongside key habitat variables. Transportation system and trajectory design decisions have enormous impacts on overall system mass, and the impacts of those decisions are themselves sensitive to the mass of the habitat that is being transported. This paper examines a variety of mission cases and evaluates total departure mass for each case. An estimate of relative costs for specific cases is also provided. The results are discussed, with an emphasis on the sensitivity of mass, cost, and other figures of merit to key parameters. Interactions and dependencies between various decisions, particularly those that relate to technology investments, are also highlighted. Overall, the various elements, systems, and subsystems required to support human spaceflight should not be optimized and evaluated in isolation, but instead should be analyzed as part of an integrated system. This paper demonstrates how integrated analysis can improve system understanding and lead to more optimal and effective crewed exploration systems.

Human Spaceflight↗