Modeling interconnections of safety and financial performance of nuclear power plants, Part 2: Methodological developments and case study
Not provided.
Engineering topics
Publications and source records attributed to Reihani, Seyed.
Not provided.
Not provided.
Probabilistic failure metrics such as leak frequency and rupture frequency are commonly used to characterize piping reliability. The methodologies for calculating the failure metrics rely on a complex set of input parameters. Operating experience data and experimental data play an important role in informing the different input parameters. The paper describes results and conclusions of a coordinated research project to benchmark three different reliability models using a four-step procedure: reference case definition of relevance to advanced reactor designs, input parameter calibration, validation of results, and application of different methodologies upon completion of the calibration and validation steps. The reference case is a weld consisting of nickel-base alloy 152/52 and located within a primary pressure boundary of an advanced reactor. This alloy is a class of structural materials known to be highly resistant to stress corrosion cracking. Synergies between the different methods are noted and the importance of a multi-disciplinary approach to input parameter development is underscored. A key conclusion is that the three methods are equally suitable for estimating failure frequencies. In any specific application, a selection of the most practical or effective computational tool can be considered. The comparison of alternative models confirms and helps to gain confidence in the computed failure frequency estimates. The study was part of a coordinated research project organized by the International Atomic Energy Agency.
Here, this paper is a byproduct of a line of research by the authors to analyze interrelationships of safety and financial performance of nuclear power plants (NPPs). The result of this line of research is summarized in three parts: Part 1 covers a categorical review of relevant literature and the theoretical bases that support the methodological developments in Part 2. Part 2 introduces an Integrated Enterprise Risk Management (I-ERM) methodological framework to quantify the interconnections of safety and financial performance with a focus on operation and maintenance (O&M) of NPPs. Part 2 has also demonstrated the applicability and values of the I-ERM methodology through an NPP case study. This paper is Part 3, where detailed development and implementation of one of the I-ERM modules, i.e., probabilistic physics-of-failure (PPoF) analysis, and its connection with safety and financial performance is reported. In this article, the physical failure modeling for hardware components is advanced by incorporating finite element analysis (FEA) into PPoF analysis and coupling the FEA-based PPoF with the maintenance performance through a renewal process model. This article covers two scientific contributions: (i) first-of-its-kind incorporation of FEA into the PPoF model of thermal fatigue for NPP components; and (ii) advancing the interface between the PPoF analysis and the renewal process model in order to deal with spatiotemporal FEA outputs and to efficiently estimate the physical transition rates even when the PPoF outputs are dominated by success data. Through the incorporation of FEA, the resolution of the PPoF analysis is enhanced as spatiotemporal conditions such as stress and temperature can be considered explicitly instead of relying on simplified assumptions or analytical models with reduced spatiotemporal dimensions. To demonstrate an application of the FEA-based PPoF analysis and its coupling with maintenance through the renewal process model, a case study is conducted using excess letdown elbow piping in the chemical and volume control system of a Pressurized Water Reactor.
To improve the realism of Fire PRA associated with fire progression and damage modeling or manual suppression, previous research by the Socio-Technical Risk Analysis (SoTeRiA) Research Laboratory at the University of Illinois at Urbana-Champaign focused on the development of an Integrated PRA (I-PRA) methodological framework for fire risk analysis in NPPs.
The goal of this research is to theorize and quantify the relationships between safety and the financial performance of nuclear power plants (NPPs). The Socio-Technical Risk Analysis (SoTeRiA) theoretical framework, which connects the social aspects (e.g., safety culture) and structural features (e.g., safety practices) of an organization with organizational safety and financial risks, is used to theorize the direct and indirect relationships between safety and the financial performance of NPPs. An Integrated Enterprise Risk Management (I-ERM) methodological framework is developed to operationalize SoTeRiA to quantify NPP safety and financial performance in a unified platform where their underlying physical degradation mechanisms, coupled with maintenance performance (considering human and organizational factors), are explicitly incorporated to depict the interconnections and dependencies between safety and financial performance. In this study, NPP safety refers to both occupational safety and system safety (estimated from Probabilistic Risk Assessment, PRA), and financial performance refers to the monetary values associated with NPP operation and maintenance (O&M) strategies. This report covers a case study demonstrating the feasibility of the I-ERM methodological framework. More detailed development of one of the I-ERM modules, i.e., Probabilistic Physics-of-Failure (PPoF) analysis, and its connection with other I-ERM modules is demonstrated in a second case study. The outcome of this research will help NPP decision-makers create cost-saving maintenance strategies while maintaining safety by providing cost- and risk-informed recommendations regarding maintenance work processes and operational strategies.
Fire is historically and analytically a significant contributor to nuclear power plant risk. The level of fire risk and the methods, tools and data for modeling this risk is highly debated by experts. One area of debate is the input data used in fire modeling and how to deal with this data’s high uncertainty. This report outlines initial work performed for determining the key parameters causing this uncertainty and how it propagates into nuclear power plant models. This research paves the way for the development of methods to reduce fire data uncertainty used in modeling. The Nuclear Regulatory Commission has mandated that nuclear power plants perform fire risk modeling. However, there are several issues with the current risk modeling implementation that affect the results. Approved modeling methods can be overly conservative and often do not match plant experience. Also, the data used in the modeling can have high uncertainties and is influenced by expert judgement. To evaluate input data uncertainty, researchers performed an initial review of several fire experiments done at Sandia National Laboratories. Uncertainties for fire data can come from many sources, such as experiment design constraints, environmental conditions, or other plant-specific aspects. There are many different significant and insignificant parameters driving the uncertainty. Additionally, the uncertainty of the different input data used in the fire modeling could have a significant or insignificant effect on the entire plant risk. A four-step methodology was developed to perform Integrated Probabilistic Risk Assessment Importance Ranking. A demonstration case using these steps was set up and three of the four steps were completed in fiscal year (FY) 2019 and the fourth step done FY 2020. These steps are: 1. The qualitative analysis of potential sources was conducted with the following items identified for the demonstration. • Maximum heat release rate • Time to maximum heat release rate • Duration of max heat release rate • Time to decay • Thermal conductivity of concrete • Specific heat of concrete • Density of concrete • Cable jacket thickness 2. A quantitative characterization of dominant sources of uncertainty was performed. A list of distributions and determined values of the dominant sources is shown in Appendix A. 3. A quantitative screening of the potential sources of uncertainty using Morris Elementary Effects Analysis was completed. An experimental model using the physics-based fire modeling tool Fire Dynamics Simulator was developed and coupled with the Risk Analysis Virtual Environment. The Morris analysis identified at least two parameters that can be eliminated as significant contributors (specific heat of concrete and cable jacket thickness). 4. Global importance measure (Global IM) analysis to generate a comprehensive ranking based on their influence on the plant risk. In this research, a moment-independent Global IM is used since it can address (a) uncertainty in the input parameters of the fire model, (b) uncertainty in the risk outputs, and (c) non-linearity and interactions among input parameters in the fire model, more accurately than the correlation-based and variance-based global methods. The observations from the research showed that, depending on the initial and boundary conditions of the fire scenarios, fire-induced damage could have a very small probability and could be dominated by the tail of the uncertainty distribution; hence, the accuracy of the correlation-based and variance-based methods is questionable. The moment-independent Global IM analysis in this research provides a better understanding of how experimental uncertainty data affects industry’s plant models and where improvements in that data will have the largest benefit for improving fire modeling accuracy in causing core damage. Among the five unscreened parameters obtained from the Morris EE analysis, the Global IM analysis results for the case study indicated that max heat release rate and fire location are the most important parameters. The report also outlines benefits of using a unified computational platform that integrates the underlying simulations (e.g., a fire progression model), quantitative screening (using the Morris EE method), and the Global IM analysis. A unified platform can (i) facilitate the ranking of input parameters considering multiple key fire scenarios simultaneously, rather than considering one scenario at a time, (ii) contribute to more explicit and accurate treatment of dependencies at multiple levels of Fire PRA, (iii) facilitate the sampling-based uncertainty quantification for Fire PRA, and (iv) help generating both “industry-wide” and "plant-specific" ranking of uncertainty sources in Fire PRA. Future research should be done to include additional parameters such as detection/suppression or cable fire spread. Adding a PRA software such as SAPHIRE to the RAVEN platform would help with plant model integration and improve treatment of fire-induced dependency. The I-PRA risk importance ranking methodology offered in this report can provide valuable information for efficiently (a) enhancing the realism of Fire PRA for existing plants and (b) supporting the development of Dynamic Fire PRA for advanced reactors and new plants.
This article presents the first output of the International Atomic Energy Agency (IAEA) Coordinated Research Project (CRP), titled Methodology for Assessing Pipe Failure Rates in Advanced Water-Cooled Reactors (AWCRs), launched in 2018. This IAEA CRP is aimed at developing a good-practices document for estimating the probabilistic failure metrics of piping in AWCRs. The reliability of piping that comprise the Reactor Coolant Pressure Boundary (RCPB) is important for maintaining safe and stable operations of Nuclear Power Plants (NPPs) because failure of those piping components could lead to undesirable consequences, such as plant shutdown, costly repair, the occurrence of Loss-of-Coolant Accidents (LOCAs) and, possibly, subsequent core damage or large release events. Probabilistic failure metrics (e.g., failure rate, failure frequency, or failure probability) of RCPB components are the key inputs to the Probabilistic Safety/Risk Assessment (PSA/PRA) and risk management of NPPs. The estimation of probabilistic failure metrics, however, is challenging, especially for AWCRs, due to the lack of operating experience. Therefore, as the first step of the IAEA CRP activities, this paper is developed to provide a literature review of the existing studies (from 2000 to April 2019) on the estimation of probabilistic failure metrics for RCPB piping and Steam Generator (SG) tubes of NPPs and to categorize them based on four criteria: (1) explicitness of incorporation of physical failure mechanisms; (2) types of failure characterization; (3) types of physical models for degradation; and (4) explicitness of consideration of maintenance. The existing studies are also analyzed from the viewpoint of the following key aspects: (i) uncertainty analysis, (ii) sensitivity analysis, (iii) validation strategies, and (iv) the areas of applications.
Not Available
Renewal process modeling is used for the failure prediction of hardware components under periodic maintenance. While most studies utilized data-driven approaches to estimate the input parameters for renewal process models, this paper initiates a line of research to integrate renewal process modeling with probabilistic models of underlying mechanisms associated with physical degradation and maintenance. At this stage of the research, the methodology integrates Markov modeling with Probabilistic Physics-of-Failure (PPoF) models of degradation, while maintenance is treated by a data-driven approach. This methodology is valuable to obtain a more accurate estimation of component reliability and availablity, especially when (i) components are highly reliable, and failure data are limited, (ii) historical data are unreliable due to changes in design, operation, and maintenance, or (iii) advanced technologies have emerged limiting operational data. The methodology explicitly incorporates the underlying spatiotemporal causes of failure into the renewal model, allowing to rank the criticality of causal factors to improve maintenance and mitigation strategies. Although the new methodology is applicable for component reliability and availability analysis in diverse industries, this report demonstrates its value for estimating frequencies of a Loss-Of-Coolant Accident (LOCA), which is an initiating event in Probabilistic Risk Assessment (PRA) of Nuclear Power Plants (NPPs).