Reisenauer, John

Publications and source records attributed to Reisenauer, John.

Strategy for the Identification of an INL Comprehensive Utility Corridor

This report documents the strategy developed to identify a comprehensive utility corridor (CUC) on the Idaho National Laboratory (INL) Site. The strategy established the process for which the Campus Development Office will evaluate land management issues. It is a process that uses geographical information system geospatial technology to layer critical INL mission information in a way that thorough evaluations can be conducted and strategies developed. The objective of the CUC Project was to develop a process that could be implemented to identify potential utility corridor options for consideration. The process had to take into account all the missions occurring on the INL and other land-related issues. The process for developing a CUC strategy consists of the following four basic elements using geographical information system capabilities: 1. Development of an INL base layer map; this base layer map geospatially references all stationary geographical features on INL and sitewide information. 2. Development of current and future mission land-use need maps; this involved working with each directorate to identify current mission land use needs and future land use needs that project 30 years into the future. 3. Development of restricted and potential constraint maps; this included geospatially mapping areas such as wells, contaminated areas, firing ranges, cultural areas, ecological areas, hunting areas, easement, and grazing areas. 4. Development of state highway and power line rights of way map; this included geospatially mapping rights-of-way along existing state highways and power lines running through the INL that support INL operations. It was determined after completing and evaluating the geospatial information that the area with the least impact to INL missions was around the perimeter of the INL Site. Option 1, in this document, identifies this perimeter; however, it does not mean the entire perimeter is viable. Many places along the perimeter corridor cannot be used or are not economically viable. Specific detailed studies will need to be conducted on a case-by-case basis to clearly identify which sections along the perimeter can and cannot be used. Option 2, in this document, identifies areas along existing highways that could be a viable option. However, discussions would have to take place with the State of Idaho to use their easement as part of the corridor and mission impact would need to be evaluated if a specific request was made to the Department of Energy, Idaho Operations Office. Option 3, in this document, is a combination of Options 1 and 2. This option provides the most flexibility to minimize impacts to INL missions. As with the other two options, discussions and agreements with the State of Idaho would be needed and any specific route would need to be thoroughly evaluated for impact, implementation, and operability beyond just a strategy.

99 GENERAL AND MISCELLANEOUS↗

Sage-Grouse Lek Guideline Review Report

On April 21, 2011, an Idaho National Laboratory (INL) Land Use Committee meeting was convened to support a Department of Energy Idaho Operations Office (DOE-ID) unofficial request to obtain Land Use Committee comments pertaining to the proposed Sage-Grouse Breeding Habitat Regulations. Two documents were provided from DOE-ID pertaining to the proposed regulations: “Guidelines for INL Site Activities within Sage-grouse Breeding Habitat” and “Guidelines for New Infrastructure Development and Future Activities on the INL Site.” The INL Land Use Committee agreed to conduct this unofficial review in the spirit of collaboration between DOE-ID and the INL Land Use Committee. However, through this cursory review, significant concerns were raised regarding the guidelines, INL financial obligations, and the draft Candidate Conservation Agreement, which was not part of the requested review but is referred to by the guideline. Therefore, it is the position of the INL Land Use Committee, based on the issues raised in its cursory review, that DOE-ID request INL (through contractual channels) to conduct a formal review of the draft Candidate Conservation Agreement and guidelines. A formal review would allow ample time to thoroughly review the extensive draft regulations, identify areas of concern, and establish impacts (e.g., cost and project delays).

99 GENERAL AND MISCELLANEOUS↗

Wind Farm Recommendation Report

On April 21, 2011, an Idaho National Laboratory (INL) Land Use Committee meeting was convened to develop a wind farm recommendation for the Executive Council and a list of proposed actions for proceeding with the recommendation. In terms of land use, the INL Land Use Committee unanimously agrees that Site 6 is the preferred location of the alternatives presented for an INL wind farm. However, further studies and resolution to questions raised (stated in this report) by the INL Land Use Committee are needed for the preferred location. Studies include, but are not limited to, wind viability (6 months), bats (2 years), and the visual impact of the wind farm. In addition, cultural resource surveys and consultation (1 month) and the National Environmental Policy Act process (9 to 12 months) need to be completed. Furthermore, there is no documented evidence of developers expressing interest in constructing a small wind farm on INL, nor a specific list of expectations or concessions for which a developer might expect INL to cover the cost. To date, INL assumes the National Environmental Policy Act activities will be paid for by the Department of Energy and INL (the environmental assessment has only received partial funding). However, other concessions also may be expected by developers such as roads, fencing, power line installation, tie-ins to substations, annual maintenance, snow removal, access control, down-time, and remediation. These types of concessions have not been documented, as a request, from a developer and INL has not identified the short and long-term cost liabilities for such concessions should a developer expect INL to cover these costs. INL has not identified a go-no-go funding level or the priority this Wind Farm Project might have with respect to other nuclear-related projects, should the wind farm remain an unfunded mandate. The Land Use Committee recommends Legal be consulted to determine what, if any, liabilities exist with the Wind Farm Project and INL’s rights and responsibilities in regards to access to the wind farm once constructed. An expression of interest is expected to go out soon to developers. However, with the potential of 2 years of study remaining for Site 6, the expectation of obtaining meaningful interest from developers should be questioned.

99 GENERAL AND MISCELLANEOUS↗