Search NASASearch

Engineering topics

Ribarich, J. J.

Publications and source records attributed to Ribarich, J. J..

The 30/20 GHz flight experiment system, phase 2. Volume 1: Executive summary

Summary information on the final communication system design, communication payload, space vehicle, and development plan for the 30/20 GHz flight experiment will be installed on the LEASAT spacecraft which will be placed into orbit from the space shuttle cargo bay. The communication concept has two parts: a truck service and a customer premise service (CPS). The trucking system serves four spot beams which are interconnected in a satellite switched time division multiple access mode by an IF switch matrix. The CPS covers two large areas of the eastern United States with a pair of scanning beams.

Bronstein, L.

The 30/20 GHz flight experiment system, phase 2. Volume 2: Experiment system description

A detailed technical description of the 30/20 GHz flight experiment system is presented. The overall communication system is described with performance analyses, communication operations, and experiment plans. Hardware descriptions of the payload are given with the tradeoff studies that led to the final design. The spacecraft bus which carries the payload is discussed and its interface with the launch vehicle system is described. Finally, the hardwares and the operations of the terrestrial segment are presented.

Bronstein, L.

Surveyor guidance program.

Surveyor guidance program for midcourse and terminal information, noting redundancy in design, decision making telecommunications, etc

COMPUTER PROGRAM