Search NASASearch

Engineering topics

Ricks, Glen A.

Publications and source records attributed to Ricks, Glen A..

Flight motor set 360L001 (STS-26R), volume 1

The NASA space shuttle flight STS-26R, launched at 11:37.00.009 a.m. EDT on 29 Sep. 1988, used the redesigned solid rocket motors (RSRM) 360LOO1A and 360LOO1B. Evaluation of the ground environment instrumentation (GEI) data recorded prior to flight showed: (1) no launch commit criteria violations, (2) that the field joint heater and aft skirt thermal conditioning systems performed adequately, and (3) that the GEI data showed good agreement with thermal model predictions. Evaluation of the developmental flight instrumentation (DFI) revealed excellent agreement with both the predicted and required ballistic specifications. All parameters were well within the CEI specification requirements including propellant burn rates, specific impulse values, and thrust imbalance. Recorded strain values also indicated satisfactory radial growth and stress levels, as well as verification of adequate safety factors. Postflight inspection of the insulation, seals, case, and nozzles showed overall excellent performance. Some thermal DFI protective cork was missing, and inoperative field joint vent valves on the thermal protection cork allowed water entry into the field joints upon splashdown. Evaluation of these anomalies, as well as complete evaluation of all RSRM components, is presented.

Ricks, Glen A.

Assembly Test Article (ATA)

The assembly test article (ATA) consisted of two live loaded redesigned solid rocket motor (RSRM) segments which were assembled and disassembled to simulate the actual flight segment stacking process. The test assembly joint was flight RSRM design, which included the J-joint insulation design and metal capture feature. The ATA test was performed mid-November through 24 December 1987, at Kennedy Space Center (KSC), Florida. The purpose of the test was: certification that vertical RSRM segment mating and separation could be accomplished without any damage; verification and modification of the procedures in the segment stacking/destacking documents; and certification of various GSE to be used for flight assembly and inspection. The RSRM vertical segment assembly/disassembly is possible without any damage to the insulation, metal parts, or seals. The insulation J-joint contact area was very close to the predicted values. Numerous deviations and changes to the planning documents were made to ensure the flight segments are effectively and correctly stacked. Various GSE were also certified for use on flight segments, and are discussed in detail.

Ricks, Glen A.