Search NASA⌕ Search

Engineering topics

Riemer, Bernie

Publications and source records attributed to Riemer, Bernie.

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

Barbier, Charlotte↗

Bifurcation Buckling Analysis and Non-Linear Collapse Analysis of Teardrop Shaped Vacuum Chamber

The Spallation Neutron Source (SNS) accelerator is being upgraded to increase the beam power from 1.4MW at 1GeV to 2.8MW at 1.3GeV. The currents in the middle two injection chicane magnets cannot simply be scaled up to accommodate the increased injection energy of 1.3GeV due to potential excessive H- stripping; the magnets must be replaced with longer, lower-field magnets and the associated vacuum chambers need to be redesigned. A new teardrop-shaped vacuum chamber was initially designed to accommodate the new magnets and the updated beam paths and instrumentation. This paper focuses on the structural stability study of the teardrop shape vacuum chamber based on buckling analysis. Protection against collapse from buckling according to the ASME BPVC requirement has been evaluated in depth. First, a Type-1 bifurcation buckling analysis using a linear eigenvalue solution to determine the critical load factor was performed. Subsequently, a Type-3 nonlinear collapse analysis was conducted using the static Riks method with elastic-plastic material properties and imperfections explicitly considered in the model geometry. The critical buckling load for the teardrop shape vacuum chamber was confidently estimated based upon this two-stage approach.

Jiang, Hao↗

Bubble Generation in the SNS 2 MW Mercury Target

The accelerator at the Spallation Neutron Source is currently being upgraded to increase the proton beam power from 1.4 MW to 2.8 MW. About 2 MW will go to the first target station, while the rest will go to the future second target station. The first target station uses a mercury target. When the short proton beam pulse hits it, strong pressure waves are developed inside the mercury and the vessel itself, causing weld failures and cavitation erosion. The pressure wave can be significantly mitigated by injecting small helium bubbles into the mercury. SNS has been injecting helium since 2017 using small orifices but has met challenges in fabrication and operations with them. Thus, for the 2 MW target, swirl bubblers will be used to increase gas injection and improve reliability. A 2 MW prototypical target was built and tested in a mercury process loop available at Oak Ridge National Laboratory. Acrylic viewports on the top of the target were used to determine the bubble size distribution (BSD) generated by the swirl bubblers. It was found that the bubblers were not only capable of generating small bubbles but that the BSD was independent of gas injection rate.

Barbier, Charlotte↗

Progress on the Proton Power Upgrade at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory will double the proton power capability from 1.4 to 2.8 MW. This will be accomplished through an energy increase from 1.0 to 1.3 GeV and a beam current increase from 26 to 38 mA. The energy increase will be accomplished through the addition of 7 cryomodules to the linear accelerator (Linac). The beam current increase will be supported by upgrading several radio-frequency systems in the normal-conducting section of the Linac. Upgrades to the accumulator ring injection and extraction regions will accommodate the increase in beam energy. A new 2-MW-capable target and supporting systems will be developed and installed. Conventional facility upgrades include build-out of the existing klystron gallery and construction of a tunnel stub to facilitate future beam transport to the second target station. The project received approval to proceed with construction in October 2020. Procurements are in progress, and some installation activities have already occurred. Most of the installation will take place during three outages in 2022-2023. The project early finish is planned for 2025.

Barbier, Charlotte↗