CO 2 Procurement Plan and Agreement (SECARB Phase III Work Product 7.2.1.a)
The Southeast Regional Carbon Sequestration Partnership’s (SECARB) Anthropogenic Test is a demonstration of the deployment of CO 2 capture, transport, geologic storage and monitoring technologies. The capture component of the test takes place at the James M. Barry Electric Generating Plant in Bucks, Alabama. The capture facility utilizes post-combustion amine capture technology licensed from Mitsubishi Heavy Industries America to process flue gas from a coal-fired power unit at Plant Barry. The amount of CO 2 captured using this process is equivalent to the emissions produced when generating 25 megawatts (MW) of electricity. CO 2 captured at the plant is transported by pipeline for underground storage in a saline geologic formation within the Citronelle Dome. This project is one of the first and the largest fully-integrated commercial prototype coal-fired carbon capture and storage projects in the US. This report will highlight the essential pieces necessary to bring CO 2 from the capture facility at Plant Barry to the Anthropogenic Test Site. They are: 1) the capture facility, 2) the pipeline and 3) the well site injection equipment.