Search NASA⌕ Search

Engineering topics

Rinaldi, Nicole

Publications and source records attributed to Rinaldi, Nicole.

CSP Design Study for Sandia National Laboratories and Kirtland Air Force Base

This report provides a design study to produce 100% carbon-free electricity for Sandia NM and Kirtland Air Force Base (KAFB) using concentrating solar power (CSP). CSP plant designs of 50 MW and 100 MW are assessed to meet the electricity needs of Sandia NM and/or KAFB. Probabilistic modeling is performed to evaluate inherent uncertainties in performance and cost parameters on total construction costs and the levelized cost of electricity. Estimated annual electricity production was ~200 – 300 GWh for the 50 MW plant and ~400 – 700 GWh for the 100 MW plant. The overnight construction costs ranged between ~$300M - $400M for the 50 MW CSP plant and between ~$500M - $800M for the 100 MW CSP plant. The heliostat field was the most significant subsystem cost, followed by the thermal energy storage, power cycle, and fixed operation and maintenance costs. Other considerations such as land availability and permitting, funding options, and interconnections are discussed.

Ho, Clifford K.↗

FY2023 Site Sustainability Plan

The Sandia National Laboratories site sustainability plan and its associated DOE Sustainability Dashboard data entries encompass Sandia National Laboratories contributions toward meeting the DOE sustainability goals. This site sustainability plan fulfills the contractual requirement for National Technology & Engineering Solutions of Sandia, LLC, the management and operating contractor for Sandia National Laboratories, to deliver an annual sustainability plan to the DOE National Nuclear Security Administration Sandia Field Office.

54 ENVIRONMENTAL SCIENCES↗

100% Carbon-Free Electricity for Sandia NM and KAFB Using Concentrating Solar Power (CSP) (SAND Report)

This report provides a design study to produce 100% carbon-free electricity for Sandia NM and Kirtland Air Force Base (KAFB) using concentrating solar power (CSP). Annual electricity requirements for both Sandia and KAFB are presented, along with specific load centers that consume a significant and continuous amount of energy. CSP plant designs of 50 MW and 100 MW are then discussed to meet the needs of Sandia NM and the combined electrical needs of both Sandia NM and KAFB. Probabilistic modeling is performed to evaluate inherent uncertainties in performance and cost parameters on total construction costs and the levelized cost of electricity. Total overnight construction costs are expected to range between ~$300M - $400M for the 50 MW CSP plant and between ~$500M - $800M for the 100 MW plant. Annual operations and maintenance (O&M) costs are estimated together with potential offsets in electrical costs and CO 2 emissions. Other considerations such as interconnections, land use and permitting, funding options, and potential agreements and partnerships with Public Service Company of New Mexico (PNM), Western Area Power Administration (WAPA), and other entities are also discussed.

14 SOLAR ENERGY↗