Standardization of Ancillary Installation Tooling for SRF Cavities at Fermilab

For assemblies of cavities in cleanrooms, single-use tooling systems are made for the alignment and installation of ancillary components such as couplers and bellows. To try and minimize the amount of tooling sets used, a design has been created to standardize alignment features to allow for assembly of different components with one set of tooling. A prototype set of tooling has been developed to with the required degrees of freedom for multiple assemblies while minimizing deformation during the assembly process. Prototype designs have been created for PIP-II SSR2 and 650 Cavities and for AUP Crab Cavities. Using 3D printing, this tooling can be quickly adjusted to allow for different ancillary components. The development process and status of the design will be discussed.

Narug, Colin↗

RFD pre-series cavity testing

This talk presents the results and status of the testing of the RFD bare cavities for the High Luminosity Upgrade of the LHC and the preparations for testing and preparing dressed cavities to be cryostated at TRIUMF and installed in the LHC.

Castilla Loeza, Alejandro↗

Experience from the US contribution to HL-LHC: Nb3Sn focusing quadrupoles and SRF crab cavities

The Interaction Regions (IR) of many colliders benefit from the application of leading-edge technologies to ensure the highest possible luminosity delivered to the experiments. Leading-edge low-beta focusing magnets and crab cavities to handle individual bunches are critically important to increase the instantaneous and integrated luminosity in future Colliders.The High-Luminosity LHC Upgrade, HL-LHC, with Nb3Sn Magnets (called MQXF) and Superconducting Radio Frequency (SRF) crab cavities (of two types, called DQW and RFD) is a world-wide collaborative project under construction in this decade to utilize the solutions mentioned above as key ingredients to increase tenfold the integrated luminosity delivered to the CMS and ATLAS experiments in the next decade. The HL-LHC AUP is the US effort to contribute approximately 50% of the low-beta focusing magnets and crab cavities for the HL-LHC.In this contribution we present the valuable lessons learned by the US efforts in the procurement, construction, and testing phases of the Nb3Sn focusing magnets and SRF crab cavities. We will report on the experience gathered by HL-LHC AUP in the production of the first half of deliverables (magnets MQXFA03 to MQXFA13). We will also report on the test of the first cryoassemblies and the status of the cavities’ development, production and testing.Both the technical and project management lessons-learned will inform applications of these technologies to future colliders and projects.

43 PARTICLE ACCELERATORS↗

A New Design for the Hilumi Radio-Frequency Dipole Bare Cavity

Crabbing cavities are one of the technological landmark that will allow the LHC to optimize its per-formance and maximize its integrated luminosity by allowing a head-on collision between the bunches despite the non-zero crossing angle. A total of 8 crab cavities will be installed in the interaction region of each of the two experiments, ATLAS and CMS. In the last years, the two types of crab cavities were de-signed, built and tested under the US-LARP R&D pro-gram. Horizontal crabbing is obtained with a radio-frequency dipole cavity (RFD) designed by Old Do-minion University (ODU), SLAC and Fermilab (FNAL). In this paper a new mechanical design, that uses passive stiffeners, is presented. This design leads to a decrease of the Lorentz Force Detuning frequency shift, satisfy the requirements on pressure sensitivity, validate the structural integrity and increase the tuner sensitivity and the maximum elastic tuning range. Furthermore, it will be possible to greatly simplify the shape of the magnetic shield and Helium vessel with respect to the current design.

43 PARTICLE ACCELERATORS↗

Preparation and Qualification of Jacketed SSR1 Cavities for String Assembly at Fermilab

The qualification of dressed 325 MHz Single Spoke Resonators type 1 (SSR1) to meet technical requirements is an important milestone in the development of the SSR1 cryomodule for the PIP-II Project at Fermilab. This paper reports the procedures and lessons learned in processing and preparing these cavities for horizontal cold testing prior to integration into a cavity string assembly.

43 PARTICLE ACCELERATORS↗

Methodology for the structural design of single spoke accelerating cavities at Fermilab

Fermilab is planning to upgrade its accelerator complex to deliver a more powerful and intense proton-beam for neutrino experiments. In the framework of the so-called Proton Improvement Plan-II (PIP-II), we are designing and developing a cryomodule containing superconducting accelerating cavities, the Single Spoke Resonators of type 1 (SSR1). In this paper, we present the sequence of analysis and calculations performed for the structural de- sign of these cavities, using the rules of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC). The lack of an accepted procedure for addressing the design, fabrication, and inspection of such unique pressure vessels makes the task demanding and challenging every time. Several factors such as exotic materials, unqualified brazing procedures, limited nondestructive examination, and the general R&D nature of these early generations of cavity design, conspire to make it impractical to obtain full compliance with all ASME BPVC requirements. However, the presented approach allowed us to validate the design of these new generation of single spoke cavities with values of maximum allowable working pressure that exceed the safety requirements. This set of rules could be used as a starting point for the structural design and development of similar objects.

42 ENGINEERING↗

CW Room Temperature Re-buncher for the PIP-II Linac Front End

At Fermilab there is a plan for improvements to the Fermilab accelerator complex aimed at providing a beam power capability of at least 1 MW on target. The essential element of the plan (the Proton Improvement Plan II – PIP-II) is a new 800 MeV superconducting linac. The PIP-II linac includes a room temperature front-end and high energy part based on five types of superconducting cavities used to cover the entire velocity range required for beam acceleration. The room temperature front end is composed of an ion source, low energy beam transport line (LEBT), radio frequency quadrupole (RFQ), and a medium energy beam transport line (MEBT). The paper reports RF design of the re-buncher for MEBT along with thermal analysis of the cavity.

43 PARTICLE ACCELERATORS↗

Status of the Design of 650 MHz Elliptical Cavities for Project X

Project X is a proposed high-intensity proton accelerator complex that could provide beam to create a high-intensity neutrino beam, feed protons to kaon- and muon-based precision experiments, and for other applications still under investigation. The present configuration of the proton accelerator foresees a section with 650 MHz β = 0.6 and β = 0.9 elliptical cavities. Prototypes of single-cell 650 MHz cavities and five-cell β = 0.9 650 MHz cavities are being designed and fabricated at Fermilab in the R&D process for Project X. This paper summarizes the design status of the β = 0.6 and β = 0.9 single-cell prototype cavities, and also addresses the design effort focused on the five-cell β = 0.9 cavities.