Smart dim fuse: electrical load flexibility controller using sub-circuit voltage modulation and load sensing

Improved control of electrical power consumption is provided with “Smart Dim Fuses” (SDF) which can alter their output voltage as provided to the load circuits they are connected to. SDF units can replace conventional circuit breakers in electrical panels. The voltage control capability provided by SDF units can lead to improved control of electrical power consumption, since many loads can smoothly operate at lower power consumption when the voltage they are driven with decreases. SDF units can comply with relevant safety requirements, such as uninterrupted neutral connections between electrical mains and load circuits. SDF units can also provide a current limiting function that can substitute for the protective action of conventional circuit breakers.

Goldin, Aaron↗

Optimal Operator Training Reference Models for Human-in-the-loop Systems

The human operator is an integral part of a stable and safe power system. While there is increasing attention paid to automation improvements, the importance of understanding and training human operators may be understated. This paper discusses a project to enhance operator training programs by evaluating human performance relative to a reference operator model identified using optimal control theory. Along with establishing a simple computer-based operator workstation for future training purpose, this paper describes the optimal control response design methodology for a human-in-the-loop power system experiment. The overall system model is presented. An optimal controller synthesis methodology is applied to the model system and the optimal controller is designed. The performance of the optimal controller is then compared to human subject performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design and Implementation of the LLRF System for LCLS-II

The SLAC National Accelerator Laboratory is building LCLS-II, a new 4 GeV CW superconducting (SCRF) linac as a major upgrade of the existing LCLS. The SCRF linac consists of 35 ILC style cryomodules (eight cavities each) for a total of 280 cavities. Expected cavity gradients are 16 MV/m with a loaded QL of ~ 4 x 10⁷. Each individual RF cavity will be powered by one 3.8 kW solid state amplifier. To ensure optimum field stability a single source single cavity control system has been chosen. It consists of a precision four channel cavity receiver and two RF stations (Forward, Reflected and Drive signals) each controlling two cavities. In order to regulate the resonant frequency variations of the cavities due to He pressure, the tuning of each cavity is controlled by a Piezo actuator and a slow stepper motor. In addition the system (LLRF-amplifier-cavity) was modeled and cavity microphonic testing has started. This paper will describe the main system elements as well as test results on LCLS-II cryomodules.

Serrano, Carlos↗

Simulation of E-Cloud Driven Instability And Its Attenuation Using a Feedback System in the CERN SPS

Electron clouds have been shown to trigger fast growing instabilities on proton beams circulating in the SPS, and a feedback system to control the instabilities is under active development. We present the latest improvements to the Warp-Posinst simulation framework and feedback model, and its application to the self-consistent simulations of two consecutive bunches interacting with an electron cloud in the SPS.

43 PARTICLE ACCELERATORS↗

Concepts for the PEP-X Light Source

SSRL and SLAC groups are developing a long-range plan to transfer its evolving scientific programs from the SPEAR3 light source to a much higher performing photon source that would be housed in the 2.2-km PEP-II tunnel. While various concepts for the PEP-X light source are under consideration, including ultimate storage ring and ERL configurations, the present baseline design is a very low-emittance storage ring. A hybrid lattice has double bend achromat (DBA) cells in two of the six arcs that provide a total 30 straight sections for insertion device (ID) beam lines extending into two new experimental halls. The remaining arcs contain TME cells. Using 90 m of damping wigglers the horizontal emittance at 4.5 GeV would be 100 pm-rad with 1.5-A stored beam. PEP-X will produce photon beams having brightnesses near 10{sup 22} (ph/s/mm{sup 2}/mrad{sup 2}/0.1% BW) at 10 keV. Studies indicate that a 90-m undulator could have FEL gain and brightness enhancement at soft x-ray wavelengths with the stored beam. Crab cavities or other beam manipulation systems could be used to reduce bunch length or otherwise enhance photon emission properties. The present status of the design of PEP-X as a storage ring is presented.

XFEL↗

Commissioning of the LHC Low Level RF System Remote Configuration Tools

The LHC Low Level RF system (LLRF) is a complex multi-loop system used to regulate the superconductive cavity gap voltage as well as to reduce the impedance presented by RF stations to the beam. The RF system can have a profound impact on the stability of the beam; a mis-configured RF system has the potential of causing longitudinal instabilities, beam diffusion and beam loss. To configure the RF station for operation, a set of parameters in the LLRF multi-loop system have to be defined. Initial system commissioning as well as ongoing operation requires a consistent method of computer based remote measurement and model-based design of each RF station feedback system. This paper describes the suite of Matlab tools used for configuring the LHC RF system during the start up in Nov2009-Feb2010. We present a brief overview of the tool, examples of commissioning results, and basics of the model-based design algorithms. This work complements our previous presentation, where the algorithms and methodology followed in the tools were described.

43 PARTICLE ACCELERATORS↗

A Design Report of the Baseline for PEP-X: an Ultra-Low Emittance Storage Ring

Over the past year, we have worked out a baseline design for PEP-X, as an ultra-low emittance storage ring that could reside in the existing 2.2-km PEPII tunnel. The design features a hybrid lattice with double bend achromat (DBA) cells in two arcs and theoretical minimum emittance (TME) cells in the remaining four arcs. Damping wigglers are used to reduce the horizontal emittance to 86 pm-rad at zero current for a 4.5 GeV electron beam. At a design current of 1.5 A, the horizontal emittance increases, due to intrabeam scattering, to 164 pm-rad when the vertical emittance is maintained at a diffraction limited 8 pm-rad. The baseline design will produce photon beams achieving a brightness of 10{sup 22} (ph/s/mm{sup 2}/mrad{sup 2}/0.1% BW) at 10 keV in a 3.5-m conventional planar undulator. Our study shows that an optimized lattice has adequate dynamic aperture, while accommodating a conventional off-axis injection system. In this report, we present the results of study, including the lattice properties, nonlinear dynamics, intra-beam scattering and Touschek lifetime, RF system, and collective instabilities. Finally, we discuss the possibility of partial lasing at soft X-ray wavelengths using a long undulator in a straight section.

43 PARTICLE ACCELERATORS↗

Longitudinal Bunch Position Control for the Super-B Accelerator

The use of normal conducting cavities and an ion-clearing gap will cause a significant RF accelerating voltage gap transient and longitudinal phase shift of the individual bunches along the bunch train in both rings of the SuperB accelerator. Small relative centroid position shifts between bunches of the colliding beams will have a large adverse impact on the luminosity due to the small {beta}*{sub y} at the interaction point (IP). We investigate the possibility of minimizing the relative longitudinal position shift between bunches by reducing the gap transient in each ring and matching the longitudinal bunch positions of the two rings at the IP using feedback/feedforward techniques in the LLRF. The analysis is conducted assuming maximum use of the klystron power installed in the system.