Search NASA⌕ Search

Engineering topics

Roberts, C. E.

Publications and source records attributed to Roberts, C. E..

Double lunar swingby and Lissajous trajectory design for the WIND mission

Two alternative mission profiles are presented for the WIND mission whose baseline design includes two years in a double lunar swingby (DLS) orbit followed by one year in a Lissajous orbit about the sun-earth L1 libration point. The first alternative uses a half-month high-inclination transfer orbit between two lunar gravity assists to change the initial sunward DLS orbit to a DLS orbit in the geomagnetic tail region. The second alternative uses a direct insertion from launch into a large-amplitude Lissajous orbit followed by a sunward DLS orbit.

Sharer, P. J.↗

Transfer trajectory design for the SOHO libration-point mission

It is shown that transfer trajectories to the halo orbit exist throughout the year, with a one week closure of the launch window each month because of unfavorable lunar perturbations that cannot be corrected in the case of transfer trajectory insertion errors. The launch window for transfers to large-amplitude Lissajous orbits is virtually the same as that for transfers to the baseline halo orbit. Details of these trajectories are described and questions about groundstation coverage are discussed.

Dunham, D. W.↗

Large inclination change using lunar-swingby techniques

The use of lunar-swingby maneuvers to transfer a spacecraft from an equatorial orbit to a polar orbit has been investigated in order to verify the technical feasibility of the NASA/ESA equatorial science phase (ESP)/Cluster mission. The solar aspect angle constraints of the spacecraft spin-axis and the dependence of the total Delta-V cost of the transfer on the initial ESP orbital parameters (particularly perigee radius and inclination) have been studied. The results indicate that a satisfactory ESP-to-Cluster orbit transfer can be achieved using a double lunar-swingby sequence.

Lee, T.↗