Search NASA⌕ Search

Engineering topics

Robins, Jody

Publications and source records attributed to Robins, Jody.

RePED 250: Manufacturing and Market Analysis of High-Temperature Alternators

The novel repetitive pulsed electric drill 250 (RePED 250) has the potential to greatly lower the costs and drilling times of geothermal projects. This tool discharges electric pulses through hard rock formations, shattering the rock in tension and allowing it to be quickly removed. One hurdle in bringing this technology to market is the RePED 250 downhole alternator. This component is essential for supplying power to the electronic drilling tool. There are currently no downhole tools on the market that meet the RePED 250 alternator's high temperature and power requirements. This report focuses on the path to commercialization for this novel alternator technology being developed as part of the RePED 250 project. One aim of this work is to identify the geothermal market size for the RePED 250 alternator, as well as other potential markets for this technology outside of geothermal. The geothermal market is very small, with only approximately 13 wells drilled in the United States each year. The worldwide market is several times this size and growing each year. The ability of the RePED 250 technology to drastically reduce the cost of geothermal projects may also lead to an increase in this market size. Technology developed for the high-temperature, high-power RePED 250 alternator can also be used to create high-temperature and high-power motors. These motors and alternators will have potential applications in oil and gas drilling, a $300 billion dollar industry in the United States alone, as well as in more distant industries such as aircraft, weapon systems, space exploration, and electric vehicles. Other aspects of the RePED 250 alternator's path to commercialization are also analyzed, including the supply chain for production materials and potential manufacturing methods. The supply chain and manufacturing practices for low-temperature motors and alternators are well established and require relatively minor changes for the high-temperature and high-power RePED 250 alternator. Sourcing for high-temperature materials has been identified, as well as potential supply chain risks. These most notably include electrical steel and high-temperature samarium cobalt (SmCo) magnets. Overall, these risks are not expected to be significant at the likely manufacturing scale required for the RePED 250.

15 GEOTHERMAL ENERGY↗

Geothermal Play Fairway Analysis Best Practices

Play fairway analysis (PFA) is a methodology that can improve success rates for geothermal exploration drilling, thus reducing the costs of geothermal projects while facilitating development in new areas. It was originally developed for the oil and gas industry, but has been adapted for discovering geothermal resources over the last decade. The geothermal PFA methodology involves systematically screening a set geographic area for promising qualities typically related to the presence of heat, permeability, and fluid. Successful application of PFA can identify hidden hydrothermal systems. From 2014 to 2021 the U.S. Department of Energy (DOE) Geothermal Technologies Office (GTO) supported the development of PFA for geothermal resources through awards to 11 research teams across the country. The goal of these projects was to advance and adapt PFA for geothermal exploration to produce regional-scale maps that reduce exploration uncertainty. This report is an outcome of the NREL-led PFA Retrospective project, which compiled, synthesized, analyzed the results of GTO's geothermal PFA program. Ultimately, we find that these projects greatly advanced approaches to geothermal exploration and resulted in extensive new data and new discoveries of unrecognized geothermal systems. We used the results to distill best practices in this report and to provide guidance for future applications of geothermal PFA.

15 GEOTHERMAL ENERGY↗

Non-Technical Barriers to Geothermal Development in California and Nevada

Geothermal project development in the United States may be subject to numerous permits, authorizations, and other regulatory requirements at the federal, state, and local level, which are necessary to address potential environmental and resource impacts at geothermal project sites. This report presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.

15 GEOTHERMAL ENERGY↗

Annual Technology Baseline: The 2022 Electricity Update

Consistent cost and performance data for various electricity generation technologies can be difficult to find and may change frequently for certain technologies. With the Annual Technology Baseline (ATB), the National Renewable Energy Laboratory annually provides an organized and centralized set of such cost and performance data. The ATB uses the best information from the Department of Energy national laboratories' renewable energy analysts. The ATB has been reviewed by experts and it includes the following electricity generation and storage technologies: land-based wind, offshore wind, distributed wind, utility-scale solar photovoltaics (PV), commercial-scale solar PV, residential-scale solar PV, concentrating solar power, geothermal power, hydropower, utility-scale battery storage, commercial battery storage, residential battery storage, pumped storage hydropower, coal, and natural gas. EIA data for nuclear and conventional biopower are included for reference. This webinar presentation introduces the 2022 update to the ATB Electricity data and documentation.

capacity factor↗

Dataset for report: Non-Technical Barriers to Geothermal Development in California and Nevada

In California and Nevada, geothermal projects are subject to non-technical barriers, which may create development delays leading to higher project costs and risks and decreased competitiveness with other electricity generation technologies. These non-technical barriers may include federal and state permits, authorizations, environmental reviews, and other regulatory requirements that are applicable throughout different phases of geothermal project development. The 2022 National Renewable Energy Laboratory (NREL) report, "Non-Technical Barriers to Geothermal Development in California and Nevada" presents findings of a study on non-technical barriers that may influence geothermal project development. The set of data resources relied upon for the report includes: 1) interviews conducted with relevant geothermal stakeholders including regulators and project developers, 2) federal and state environmental review documents developed for specific projects, 3) a techno-economic analysis conducted using the NREL Annual Technology Baseline (ATB) framework, and 4) an analysis of the impacts of site-specific land access and permitting considerations on project development readiness conducted using the Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT) Socioeconomic Assessment Tool (SEAT).

15 GEOTHERMAL ENERGY↗

Establishing a Baseline for Global Geothermal Drilling Rates

Geothermal is a promising source of renewable energy with almost zero emissions. However, there remains untapped geothermal potential around the world. This is largely because geothermal projects have high development costs and high resource-value uncertainty, and returns on initial investments can be slow to materialize. Increasing drilling efficiency of geothermal wells is one way to decrease development costs, as drilling accounts for up to 50% of the upfront costs of a geothermal power project. Currently, little quantitative information exists about how fast geothermal drilling occurs on a global scale. This paper was originally intended to be an extension of Frone and Boyd's 2018 report on geothermal drilling rates in California and Nevada. Our project includes global data and considers additional measures, such as flat time. Data for the project was limited to published papers and drilling reports that are publicly available online. The goal of our project was to establish a baseline geothermal drilling rate that is representative of current global geothermal drilling practices can be used to gauge the impact of future improvements in geothermal drilling technology. We recorded the number of days from beginning to end of a project, the number of days spent drilling, and the number of days considered to be flat time. We found the average global rate at which a drilling project is completed (including non-drilling activities) to be 160 ft/day, and the average drilling rate (including only time during which active drilling occurred) to be 360 ft/day. Our data shows no clear trend in rate change from 2000 to 2017 and significant variability in drilling rates between countries and within countries.

baseline↗

US Geothermal Electricity and Heat Market Analysis and Report

The power production data from FY19 is provided for U.S. geothermal power plants. The spreadsheet includes the plant name and type, nameplate capacity, summer capacity, winter capacity, and net generation for each power plant.

15 GEOTHERMAL ENERGY↗