Search NASASearch

Engineering topics

Rochman, Muhammad [UND]

Publications and source records attributed to Rochman, Muhammad [UND].

DOE CESER 6 GHz Interference Study

DOE CESER has sponsored Idaho National Laboratory (INL) to conduct an objective and independent study of potential 6 GHz interference from outdoor operation of unlicensed devices in the 6 GHz band on fixed service (FS) microwave communication links operated by electrical sector incumbents in that band. INL is collaborating with University of Notre Dame (UND), Electric Power Research Institute (EPRI), Lockard & White, Southern Company, and AT&T, to gather data with real-world 6 GHz interference experiments and identify (1) the potential for interference from unlicensed devices and (2) the interference necessary to cause harm to the incumbents. In addition to the functional assessment, a security assessment of the FCC mandated Automatic Frequency Coordination (AFC) System to regulate use of unlicensed 6 GHz standard power devices is also being conducted. A major objective is to create a science-based and defensible methodology used to produce the necessary data and to derive objective conclusions. This proven methodology can then be used to produce objective data and conclusions for other spectrum bands with similar incumbent uses including 4.4 – 4.9 GHz and 7.125 – 7.4 GHz, identified in the reconciliation bill that was adopted on July 4, 2025, as well as the National Spectrum Strategy discussions that are ongoing. This report contains 6 GHz field experiments and findings in the following real-world scenarios with commercial unlicensed standard power (SP) 6 GHz devices regulated by Automated Frequency Coordination (AFC): • University of Notre Dame (UND) Stadium with a capacity of 80,000 spectators, where Wi-Fi operating in 6 GHz has been deployed recently • Southern Company 6 GHz FS microwave link between Columbus and Fortson, Georgia Following are the following key findings from this study. 1. The AFC is under-protective of FS when line-of-sight exists along the path centerline. Data collected at Southern’s 6 GHz fixed link site shows significant erosion of as much as 21.4-24.4 dB of under-protection that can lead to potential service degradation under typical operating conditions. This first key finding is most likely the result of erroneous use of the RF propagation model. INL will collaborate with EPRI and the AFC Functional Requirements Working Group to submit a change request to the WinnForum TS-1014 standard towards correct use of the propagation model by the AFC. 2. There is additive interference effect of about 3 dB from nearly equal power interferers measured from simultaneous operation of two SP AP's operating co-channel with the FS receive from different locations along the path. This second key finding should be used to add the impact of additive interference of operation of multiple APs in the same geographical area, to the next generation of AFCs. INL will collaborate with FCC on the need for the AFC to consider additive interference. We also recommend that additional experiments are conducted on 6 GHz spectrum interference to further improve the AFC operation as the number of outdoor Wi-Fi devices continues to increase. These proposed steps and recommendations will make the co-existence of the incumbents and the 6 GHz outdoor Wi-Fi providers possible without any impact on the incumbents with a win-win outcome for all.

6 GHz