Search NASA⌕ Search

Engineering topics

Rosier, K. L.

Publications and source records attributed to Rosier, K. L..

RG217 V2-V2 Coaxial Cable Acceptance Test

The ECSE Solid State Pulsed Power unit is a high current, high power solid-state pulse modulator. The RG217 V2-V2 Coaxial Cable Assembly is the interface cable between the Solid State Pulser and the load. This document covers the testing procedure for the RG217 V2-V2 Coaxial Cable Assembly. This assembly is comprised of RG217 Coaxial Cable with a LRU Connector on either end. This test procedure verifies the cable is undamaged and assembled correctly, the correct cable connectors are installed properly onto the cable, and that the entire assembly meets conductivity and holdoff voltage requirements. This procedure will verify that the RG217 Coaxial Cable Assembly meets all assembly and functional requirements. In particular, this procedure verifies the Cable Shield and Center Conductor meet conductivity requirements by testing their resistances. Additionally, this procedure ensures the RG217 Coaxial Cable Assembly meets holdoff voltage requirements by applying high voltage and verifying the RG217 Coaxial Cable Assembly does not experience any breakdowns or arcing.

42 ENGINEERING↗

RG217 V2-V2 Coaxial Cable Soldering Procedure

The ECSE Solid State Pulsed Power unit is a high-current, high power solid-state pulse modulator. The RG217 V2-V2 Coaxial Cable Assembly is the interface cable between the Solid State Pulser and the load. This document covers the soldering procedure for the RG217 V2-V2 Coaxial Cable Assembly. This assembly is comprised of RG217 Coaxial Cable with a LRU Connector on either end. This soldering procedure describes the process used to solder cable tips properly onto the cable center conductor.

42 ENGINEERING↗

RG217 V2-V2 Coaxial Cable Assembly Procedure

The ECSE Solid State Pulsed Power unit is a high-current, high power solid-state pulse modulator. The RG217 V2-V2 Coaxial Cable Assembly is the interface cable between the Solid State Pulser and the load. This document covers the assembly procedure for the RG217 V2-V2 Coaxial Cable Assembly. This assembly is comprised of RG217 Coaxial Cable with a LRU Connector on either end. This assembly procedure describes the process used to install cable connectors properly onto the cable.

42 ENGINEERING↗