Search NASA⌕ Search

Engineering topics

Ryschkewitsch, M. G.

Publications and source records attributed to Ryschkewitsch, M. G..

Final cryogenic performance report for the NASA Cosmic Background Explorer (COBE)

The cryogenic operation of NASA's Cosmic Background Explorer (COBE) ended on September 21, 1990, with the depletion of the liquid helium cryogen. The COBE had successfully completed more than 10 months of dewar and instrument operation. We report on the cryogenic performance of the COBE dewar and of the two cryogenic instruments throughout the mission lifetime. We discuss the steady state dewar performance, and the dewar and instrument response to a variety of transient thermal phenomena, including external radiation (from the earth and the sun) and instrument power variation. We present the effectiveness of using approximate mass gauging techniques in determining the liquid helium content. Finally we discuss the dewar behavior during the depletion of the helium, and the expected thermal performance of the dewar cryogen tank and the cryogenic instruments as they approach final thermal equilibrium.

Volz, S. M.↗

Measured ground performance and predicted orbital performance of the superfluid helium dewar for the Cosmic Background Explorer

A critical component of the Cosmic Background Explorer observatory, which is to be lifted to orbit in 1988, is the 650-l superfluid He dewar housing a far-IR absolute spectrophotometer and a diffuse IR background experiment. Attention is presently given to the results of a four-month-long test program encompassing dewar filling verification, vibration characteristics, thermal performance over orbital lifetime, and aperture cover ejection behavior. No significant flaws have been noted; the orbital cryogen lifetime is projected to be 14 months.

Hopkins, Richard A.↗