Search NASA⌕ Search

Engineering topics

Sabbi, G.

Publications and source records attributed to Sabbi, G..

First results of AUP Nb3Sn quadrupole horizontal tests

The Large Hadron Collider will soon undergo an upgrade to increase its luminosity by a factor of ~10 [1]. A crucial part of this upgrade will be replacement of the NbTi focusing magnets with Nb3Sn magnets that achieve a ~50% increase in the field strength. This will be the first ever large-scale implementation of Nb3Sn magnets in a particle accelerator. The High-Luminosity LHC Upgrade, HL-LHC is a CERN project with a world-wide collaboration. It is under construction and utilizes Nb3Sn Magnets (named MQXF) as key ingredients to increase tenfold the integrated luminosity delivered to the CMS and ATLAS experiments in the next decade. The HL-LHC AUP is the US effort to contribute approximately 50% of the low-beta focusing magnets and crab cavities for the HL-LHC. This paper will present the program to fabricate the Nb3Sn superconducting magnets. We are reporting the status of the HL-LHC AUP project present the results from horizontal tests of the first fully assembled cryo-assembly.

43 PARTICLE ACCELERATORS↗

Current Status of the High Field Cable Test Facility at Fermilab

Fermi National Accelerator Laboratory (FNAL) and Lawrence Berkeley National Laboratory (LBNL) are collaborating to construct a new High Field Vertical Magnet Test Facility (HFVMTF) designed for testing superconducting cables in high magnetic fields. This state-of-the-art facility will be situated at Fermilab and will provide capabilities comparable to EDIPO at PSI and FRESCA2 at CERN. The HFVMTF’s background magnetic field, reaching 15 T, will be generated by a magnet supplied by LBNL. The HFVMTF is a collaborative effort supported by the US DOE Offices of Science, High Energy Physics, and Fusion Energy Sciences. It will serve as a vital testbed for superconducting HTS cables, subjecting them to high magnetic fields and a wide range of temperatures, benefiting both scientific communities. Additionally, this facility will play a key role in testing high-field superconducting magnet models and demonstrators, including hybrid magnets, developed by the US Magnet Development Pro gram (MDP). These hybrid magnets, utilizing both LTS and HTS superconductors, are significant advancements toward achieving 18+ T dipoles for future hadron-hadron colliders. The presentation outlines the current status of the facility, covering aspects such as construction progress, cryostat designs, top and lambda plates, and systems for powering, quench protection, and monitoring.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Analysis of the MQXFA Low Beta Quadrupoles for HL-LHC after 50% magnet assembly complete +

The US HL-LHC Accelerator Upgrade Project (AUP) is fabricating the MQXFA magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC (HL-LHC). This is the first production of Nb3Sn magnets for a particle accelerator, together with the MQXFB magnets for Q2a and Q2b. Here we show status and some results of MQXFA magnets fabrication and vertical test.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Status of the High Field Cable Test Facility at Fermilab

Fermi National Accelerator Laboratory (FNAL) and Lawrence Berkeley National Laboratory (LBNL) are building a new High Field Vertical Magnet Test Facility (HFVMTF) for testing superconducting cables in high magnetic field. The background magnetic field of 15 T in the HFVMTF will be produced by a magnet provided by LBNL. The HFVMTF is jointly funded by the US DOE Offices of Science, High Energy Physics (HEP), and Fusion Energy Sciences (FES), and will serve as a superconducting cable test facility in high magnetic fields and a wide range of temperatures for HEP and FES communities. This facility will also be used to test high-field superconducting magnet models and demonstrators, including hybrid magnets, produced by the US Magnet Development Program (MDP). The paper describes the status of the facility, including construction, cryostat designs, top and lambda plates, and systems for powering, and quench protection and monitoring.

43 PARTICLE ACCELERATORS↗

An Initial Look at the Magnetic Design of a 150 mm Aperture High-Temperature Superconducting Magnet With a Dipole Field of 8 to 10 T

High-temperature superconducting REBa 2 Cu 3 O 7-$x$ (rebco) conductors have the potential to generate a high magnetic field over a broad temperature range. The corresponding accelerator magnet technology, still in its infancy, can be attractive for future energy-frontier particle colliders such as a multi-TeV muon collider. To help develop the technology, we explore the requirements and potential characteristics of a rebco magnet, operating at 4.2 or 20 K, with a dipole field of 8-10 T in a clear aperture of 150 mm. We use the canted cos $\theta$ magnet configuration to reduce the electromagnetic stresses on the conductors. We present the resulting dipole fields, field gradients for combined-function cases, conductor stresses, magnet dimensions and conductor lengths. We also discuss the conductor performance that is required to achieve the target dipole field at 4.2 and 20 K. In conclusion, the information can provide useful input to the development of rebco magnet and conductor technology for collider-ring magnets in a muon collider.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Analysis of MQXFA07 Test Non-Conformity

MQXFA07 did not meet acceptance requirement during vertical test. This report presents the analysis of MQXFA07 components related to the limited test performance, and the damage mechanism as it was understood by the MQXFA team.

43 PARTICLE ACCELERATORS↗

Accelerator Technology Magnets

The Snowmass community exercise started in April 2020 to identify and document a scientific vision for the future of particle physics in the US and international partners. The AF7-Magnets working group was charged to a) address the potential contributions of magnet technology to future HEP facilities, b) evaluate the R&D required to enable these opportunities, c) estimate the time and cost scales of these efforts, and d) assess the needs for associated fabrication infrastructure and test facilities. This report addresses the working group charge, summarizes the status of accelerator and detector magnet technologies, and discuss ideas and plans to push this key area of the US and international HEP to new horizons.

43 PARTICLE ACCELERATORS↗