Scientific Computing Algorithms to Learn Enhanced Scalable Surrogates for Mesh Physics
Explore the source record for details and available documents.
Engineering topics
Publications and source records attributed to Saini, A.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Purpose: To compare dose to organs at risk (OAR) for left sided breast radiation therapy with comparable planning target volume (PTV) coverage in three techniques; free breathing in supine position (FB), deep inspirational breath hold in supine (DIBH) and free breathing in prone position (PP). Methods: Ten left sided breast cancer patients suitable for this study underwent a CT scan in three techniques e.g. supine, FB and DIBH and prone position (PP). One radiation oncologist contoured the PTV and OAR (cardiac components) based on RTOG guidelines. Treatment plans were optimized using field-in-field technique with AAA algorithm. Each plan was optimized to provide identical coverage to PTV such that a reasonable comparison in OAR dosimetry can be evaluated. The prescribed dose to PTV were 42.56 Gy; 2.66 Gy in 16 fractions. Results: Average lung dose parameters; Dmean, V10, V20 and V30 were 0.5 Gy, 0.6%, 0.2%, and 0.1% respectively in PP which is significantly lower than FB (5.9 Gy, 14.2%, 10.7 %, and 8.4%) and DIBH (5.8 Gy, 14.3%, 10.2%, 7.8%). Similarly average heart Dmean, V2.5, V5, V10, and V20 were much lower in PP (1.2Gy, 9.1%, 2.1%, 0.8%, and 0.4%), and in DIBH (1.2 Gy, 10.6%, 1.7%, 0.5%, and 0.1%) compared to FB (2.6 Gy, 21%, 7.2%, 4.4% and 3.3%) respectively. Similar findings were also noted in the heart component left anterior descending artery (LAD) and Left ventricle (LV) which are correlated to radiation related toxicity. Conclusion: Based on the calculated dose, FB technique provides highest heart and lung dose. Prone has lowest lung dose, and DIBH has lowest LAD dose. It is found that PP is always superior for heart, LV, LAD and lung as compared to FB. This conclusion is in contrast to some published study concluding that prone position has no benefit for heart sparing.
Project-X is a proposed high intensity proton facility to be built at Fermilab in United States. The first stage consists of a superconducting linac (SC) operating in continuous wave (CW) mode to accelerate a H{sup -} beam from 2.1 MeV to 3 GeV. Failure of any beamline element during operations induces a downstream mismatch of the beam which is especially severe when the failure occurs at low energy. A large mismatch causes emittance growth and ultimately results in beam losses. In a worst case scenario, the operability of the machine may be affected and long downtime may be needed to replace the failed element. To minimize possible downtime, the optics can be designed in a way that allows local retuning to make the machine operable. This paper presents studies performed to investigate retuning scenarios after failure of an accelerating cavity or a focusing magnet at critical locations in the Project-X CW superconducting linac.
Project-X is a proposed proton accelerator complex at Fermilab that would provide particle beams to support a diversified experimental program at the intensity frontier. As currently envisioned, the complex would employ a CW superconducting linac to accelerate a 1 mA average, 5 mA peak H{sup -} beam from 2.1 MeV to 3 GeV. A second superconducting linac, operating in pulsed mode would ultimately accelerate a small fraction of this beam up to 8 GeV. The CW linac is based on five families of resonators operating at three frequencies: half-wave (1 family at 162.5 MHz), spoke (2 families at 325 MHz) and elliptical (2 families at 650 MHz). Accelerating and focusing elements are assembled in cryomodules separated by short warm sections. A long open region ({approx} 15 m) allows beam extraction at 1 GeV in support of a nuclear experimental program. In this paper, we present the latest iteration of the CW linac baseline lattice. We also briefly compare it to an alternative where the 162.5 half-wave resonators are replaced with 325 MHz spoke resonators.
Abstract Not Provided
Abstract Not Provided
Project-X is the proposed high intensity proton facility to be built at Fermilab, US. First stage of the Project-X consists of superconducting linac which will be operated in continuous wave (CW) mode to accelerate the beam from 2.5 MeV to 3 GeV. The operation at CW mode puts high tolerances on the beam line components, particularly on radiofrequency (RF) cavity. The failure of beam line elements at low energy is very critical as it results in mis-match of the beam with the following sections due to different beam parameters than designed parameter. It makes the beam unstable which causes emittance dilution, and ultimately results in beam losses. In worst case, it could affect the reliability of the machine and may lead to the shutdown of the Linac to replace the failed elements. Thus, it is important to study these effects and their compensation to get smooth beam propagation in linac. This paper describes the results of study performed for the failure of RF cavity & solenoid in SSR0 section.
Project-X is the proposed high intensity proton facility to be built at Fermilab, US. Its Superconducting Linac, to be used at first stage of acceleration, will be operated in continuous wave (CW) mode. The Linac is divided into three sections on the basis of operating frequencies & six sections on the basis of family of RF cavities to be used for the acceleration of beam from 2.5 MeV to 3 GeV. The transition from one section to another can limit the acceptance of the Linac if these are not matched properly. We performed a study to calculate the acceptance of the Linac in both longitudinal and transverse plane. Investigation of most sensitive area which limits longitudinal acceptance and study of influence of failure of beam line elements at critical position, on acceptance are also performed.
Concept of the 650 MHz cavities for the Project X is presented. Choice of the basic parameters, i.e., number of cells, geometrical {beta}, apertures, coupling coefficients, etc., is discussed. The cavity optimization criteria are formulated. Results of the RF design are presented for the cavities of both the low-energy and high-energy sections.
Abstract Not Provided
Abstract Not Provided