FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade.

43 PARTICLE ACCELERATORS↗

Certification testing of production superconducting quarter-wave and half-wave resonators for $\mathrm{FRIB}$

We report the Facility for Rare Isotope Beams (FRIB) is designed to accelerate ion beams to 200 MeV per nucleon with 46 superconducting radio-frequency cryomodules. The FRIB driver linac uses quarter-wave resonators and half-wave resonators; with a total of 324 resonators, the linac is currently the largest heavy ion accelerator in the world. Production of jacketed resonators began in January 2014 and was completed in December 2019. Dewar certification testing of all the cavities was done before they were installed into cryomodules. The experience and lessons from more than 5 years of FRIB resonator production and certification testing are analyzed and summarized in this paper.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗