Search NASA⌕ Search

Engineering topics

Sakamoto, K

Publications and source records attributed to Sakamoto, K.

Ryugu's nucleosynthetic heritage from the outskirts of the Solar System

Little is known about the origin of the spectral diversity of asteroids and what it says about conditions in the protoplanetary disk. Here we show that samples returned from Cb­type asteroid Ryugu have Fe isotopic anomalies indistinguishable from Ivuna­type (CI) chondrites, which are distinct from all other carbonaceous chondrites. Iron isotopes, therefore, demonstrate that Ryugu and CI chondrites formed in a reservoir that was different from the source regions of other carbonaceous asteroids. Growth and migration of the giant planets destabilized nearby planetesimals and ejected some inwards to be implanted into the Main Belt. In this framework, most carbonaceous chondrites may have originated from regions around the birthplaces of Jupiter and Saturn, while the distinct isotopic composition of CI chondrites and Ryugu may reflect their formation further away in the disk, owing their presence in the inner Solar System to excitation by Uranus and Neptune

58 GEOSCIENCES↗

Voltage holding study of 1 MeV accelerator for ITER neutral beam injector

Voltage holding test on MeV accelerator indicated that sustainable voltage was a half of that of ideal quasi-Rogowski electrode. It was suggested that the emission of the clumps is enhanced by a local electric field concentration, which leads to discharge initiation at lower voltage. To reduce the electric field concentration in the MeV accelerator, gaps between the grid supports were expanded and curvature radii at the support corners were increased. After the modifications, the accelerator succeeded in sustaining -1 MV in vacuum without beam acceleration. However, the beam energy was still limited at a level of 900 keV with a beam current density of 150 A/m{sup 2} (346 mA) where the 3 x 5 apertures were used. Measurement of the beam profile revealed that deflection of the H{sup -} ions was large and a part of the H{sup -} ions was intercepted at the acceleration grid. This causes high heat load on the grids and the breakdowns during beam acceleration. To suppress the direct interception, new grid system was designed with proper aperture displacement based on a 3D beam trajectory analysis. As the result, the beam deflection was compensated and the voltage holding during the beam acceleration was improved. Beam parameter of the MeV accelerator was increased to 980 keV, 185 A/m{sup 2} (427 mA), which is close to the requirement of ITER accelerator (1 MeV, 200 A/m{sup 2}).

43 PARTICLE ACCELERATORS↗

Status of KSTAR 170 GHz, 1 MW Electron Cyclotron Heating and Current Drive System

A 170 GHz Electron Cyclotron Heating and Current Drive (ECH/CD) system on KSTAR is designed to launch total 2.4 MW of power for up to 300 sec into the plasma. At present the first 1 MW ECH/CD system is under installation and commissioning for 2011 KSTAR campaign. The 170 GHz, 1 MW, 300 sec gyrotron and the matching optics unit (MOU) will be provided from JAEA under collaboration between NFRI and JAEA. The transmission line consists of MOU and 70 m long 63.5 mm ID corrugated waveguides with the eight miter bends. The 1 MW, 10 sec launcher is developed based on the existing two-mirror front-end launcher in collaboration with Princeton Plasma Physics Laboratory and Pohang University of Science and Technology, and is installed on the low field side in the KSTAR equatorial plane. The mirror pivot is located at 30 cm below from the equatorial plane. 3.6 MVA power supply system is manufactured and now is under commissioning to meet the triode gun operation of JAEA gyrotron. The power supply consists of 66 kV/55 A cathode power supply, mode-anode system, and 50 kV/160 mA body power supply. In this paper, the current status of KSTAR 170 GHz, 1 MW ECH/CD system will be presented as well as the experimental plan utilizing 170 GHz new ECH/CD system.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Improvement of voltage holding and high current beam acceleration by MeV accelerator for ITER NB

Voltage holding of -1 MV is an essential issue in development of a multi-aperture multi-grid (MAMuG) negative ion accelerator, of which target is to accelerate 200 A/m{sup 2} H{sup -} ion beam up to the energy of 1 MeV for several tens seconds. Review of voltage holding results ever obtained with various geometries of the accelerators showed that the voltage holding capability was about a half of designed value based on the experiment obtained from ideal small electrode. This is considered due to local electric field concentration in the accelerators, such as edge and steps between multi-aperture grids and its support structures. Based on the detailed investigation with electric field analysis, accelerator was modified to reduce the electric field concentration by reshaping the support structures and expanding the gap length between the grid supports. After the modifications, the accelerator succeeded in sustaining -1 MV for more than one hour in vacuum. Improvement of the voltage holding characteristics progressed the energy and current accelerated by the MeV accelerator. Up to 2010, beam parameters achieved by the MAMuG accelerator were increased to 879 keV, 0.36 A (157 A/m{sup 2}) at perveance matched condition and 937 keV, 0.33 A (144 A/m{sup 2}) slightly under perveance.

43 PARTICLE ACCELERATORS↗

High power millimeter wave experiment of ITER relevant electron cyclotron heating and current drive system

High power, long pulse millimeter (mm) wave experiments of the RF test stand (RFTS) of Japan Atomic Energy Agency (JAEA) were performed. The system consists of a 1 MW/170 GHz gyrotron, a long and short distance transmission line (TL), and an equatorial launcher (EL) mock-up. The RFTS has an ITER-relevant configuration, i.e., consisted by a 1 MW-170 GHz gyrotron, a mm wave TL, and an EL mock-up. The TL is composed of a matching optics unit, evacuated circular corrugated waveguides, 6-miter bends, an in-line waveguide switch, and an isolation valve. The EL-mock-up is fabricated according to the current design of the ITER launcher. The Gaussian-like beam radiation with the steering capability of 20 deg. - 40 deg. from the EL mock-up was also successfully proved. The high power, long pulse power transmission test was conducted with the metallic load replaced by the EL mock-up, and the transmission of 1 MW/800 s and 0.5 MW/1000 s was successfully demonstrated with no arcing and no damages. The transmission efficiency of the TL was 96%. The results prove the feasibility of the ITER electron cyclotron heating and current drive system.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

DISENTANGLING THE CIRCUMNUCLEAR ENVIRONS OF CENTAURUS A. II. ON THE NATURE OF THE BROAD ABSORPTION LINE

We report on atomic gas (H I) and molecular gas (as traced by CO(2-1)) redshifted absorption features toward the nuclear regions of the closest powerful radio galaxy, Centaurus A (NGC 5128). Our H I observations using the Very Long Baseline Array allow us to discern with unprecedented sub-parsec resolution H I absorption profiles toward different positions along the 21 cm continuum jet in the inner 0.''3 (or 5.4 pc). In addition, our CO(2-1) data obtained with the Submillimeter Array probe the bulk of the absorbing molecular gas with little contamination by emission, which was not possible with previous CO single-dish observations. We shed light on the physical properties of the gas in the line of sight with these data, emphasizing the still open debate about the nature of the gas that produces the broad absorption line ({approx}55 km s{sup -1}). First, the broad H I line is more prominent toward the central and brightest 21 cm continuum component than toward a region along the jet at a distance {approx}20 mas (or 0.4 pc) further from the nucleus. This indicates that the broad absorption line arises from gas located close to the nucleus, rather than from diffuse and more distant gas. Second, the different velocity components detected in the CO(2-1) absorption spectrum match well with other molecular lines, such as those of HCO{sup +}(1-0), except the broad absorption line that is detected in HCO{sup +}(1-0) (and most likely related to that of the H I). Dissociation of molecular hydrogen due to the active galactic nucleus seems to be efficient at distances r {approx}< 10 pc, which might contribute to the depth of the broad H I and molecular lines.

79 ASTRONOMY AND ASTROPHYSICS↗

Analysis of secondary particle behavior in multiaperture, multigrid accelerator for the ITER neutral beam injector

Heat load on acceleration grids by secondary particles such as electrons, neutrals, and positive ions, is a key issue for long pulse acceleration of negative ion beams. Complicated behaviors of the secondary particles in multiaperture, multigrid (MAMuG) accelerator have been analyzed using electrostatic accelerator Monte Carlo code. The analytical result is compared to experimental one obtained in a long pulse operation of a MeV accelerator, of which second acceleration grid (A2G) was removed for simplification of structure. The analytical results show that relatively high heat load on the third acceleration grid (A3G) since stripped electrons were deposited mainly on A3G. This heat load on the A3G can be suppressed by installing the A2G. Thus, capability of MAMuG accelerator is demonstrated for suppression of heat load due to secondary particles by the intermediate grids.

43 PARTICLE ACCELERATORS↗

Analyses of high power negative ion accelerators for ITER neutral beam injector (invited)

In JAEA, research and developments to realize high power accelerator (1 MeV, 40 AD{sup -} ion beams for 3600 s) for ITER have been carried out experimentally and numerically utilizing a five stage MAMuG (Multiaperture, Multigrid) accelerator. In this paper, the extension of the gap length, which is required to improve the voltage holding capability, is examined in two dimensional beam optics analyses and also from view point of stripping loss of ions. In order to suppress excess power loadings due to the direct interception of negative ions, which is issued in long pulse tests, the beamlet deflection is analyzed in three dimensional multibeamlet analyses. The necessary modifications shown above are applied to the MAMuG accelerator for coming long pulse tests in JAEA and ITER.

43 PARTICLE ACCELERATORS↗

Long pulse H{sup -} ion beam acceleration in MeV accelerator

A multiaperture multigrid accelerator called ''MeV accelerator'' has been developed for neutral beam injection system of international thermonuclear experimental reactor. In the present work, long pulse H{sup -} ion beam acceleration was performed by the MeV accelerator equipped with new water-cooled grids. At present, the pulse length was extended to 5 s for the beams of 750 keV, 221 mA, and 10 s for the beams of 600 keV, 158 mA. Energy density, defined as products of beam energy (keV), current (mA), and pulse (s) divided by aperture area (m{sup 2}), increased more than one order of magnitude higher compared with original MeV accelerator without water cooling in its grids. At higher energy and current, the grid was melted by beam deflection. Due to this grid melting, breakdowns occurred between the grids, and hence, the pulse length was limited. Beam deflection will be compensated by aperture displacement in next experiment.

43 PARTICLE ACCELERATORS↗

Resent Status of ITER Equatorial Launcher Development

The ITER equatorial launcher is divided into a front shield and a port plug. The front shield is composed of fourteen blanket shield modules so as to form three openings for the injection of mm-wave beams into plasma. Twenty-four waveguide transmission lines, internal shields, cooling pipes and so on are installed in the port plug. The transmission lines consist of the corrugated waveguides, miter bends and the free space propagation region utilizing two mirrors in front of the waveguide outlet. The analysis of mm-wave beam propagation in the region shows that the transmission efficiency more than 99.5% is attained. The high power experiments of the launcher mock-up have been carried out and the measured field patterns at each mirror and the outlet of the launcher are agreed with the calculations. It is concluded that the transmission line components in the launcher mock-up are fabricated as designed and the present mm-wave design in the launcher is feasible.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Progress in design and integration of the ITER Electron Cyclotron H&CD system

The Electron Cyclotron system for ITER is an in-kind procurement shared between five parties and the total installed power will be 24 MW, corresponding to a nominal injected power of 20 MW to the plasma, with a possible upgrade up to 48 MW (corresponding to 40 MW injected). Some critical issues have been raised and changes are proposed to simplify these procurements and to facilitate the integration into ITER. The progress in the design and the integration of the EC system into the whole project is presented in this paper, as well as some issues still under studies and some recommendations made by external expert committees.

43 PARTICLE ACCELERATORS↗

Progress on the heating and current drive systems for ITER

The electron cyclotron (EC), ion cyclotron (IC), heating-neutral beam (H-NB) and, although not in the day 1 baseline, lower hybrid (LH) systems intended for ITER have been reviewed in 2007/2008 in light of progress of physics and technology in the field. Although the overall specifications are unchanged, notable changes have been approved. Firstly, it has been emphasized that the H&CD systems are vital for the ITER programme. Consequently, the full 73 MW should be commissioned and available on a routine basis before the D/T phase. Secondly, significant changes have been approved at system level, most notably: the possibility to operate the heating beams at full power during the hydrogen phase requiring new shine through protection; the possibility to operate IC with 2 antennas with increased robustness (no moving parts); the possible increase to 2 MW of key components of the EC transmission systems in order to provide an easier upgrading of the EC power as may be required by the project; the addition of a building dedicated to the RF power sources and to a testing facility for acceptance of diagnostics and heating port plugs. Thirdly, the need of a plan for developing, in time for the active phase, a CD system such as LH suitable for very long pulse operation of ITER was recognised. The review describes these changes and their rationale.

08 HYDROGEN↗

Development of 1 MeV H{sup -} Accelerator at JAEA for ITER NB

This paper reports the recent activities at JAEA for the development of 1 MeV H{sup -} ion accelerator toward the ITER NBI. For the development of MAMuG accelerator, a 320 mA H{sup -} ion beam was successfully accelerated as the highest record in the world at the MeV class energy (796 keV). This was achieved by protecting the H{sup -} ion source from the high heat load by the backstream positive ions, which was produced during the high current H{sup -} ion acceleration. The SINGAP accelerator was tested at JAEA to compare the performance of the SINGAP and the MAMuG. This paper also reports the results of the SINGAP test and the comparison between the SINGAP and the MAMuG is discussed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Numerical analysis of the production profile of H{sup 0} atoms and subsequent H{sup -} ions in large negative ion sources

The production and transport processes of H{sup 0} atoms are numerically simulated using a three-dimensional Monte Carlo transport code. The code is applied to the large JAEA 10 ampere negative ion source under the Cs-seeded condition to obtain a spatial distribution of surface-produced H{sup -} ions. In this analysis, the amount of H{sup 0} atoms produced through dissociation processes of H{sub 2} molecules is calculated from the electron temperature and density obtained by Langmuir probe measurements. The high-energy tail of electrons, which greatly affects H{sup 0} atom production, is taken into account by fitting a single-probe characteristic as a two-temperature Maxwellian distribution. In the H{sup 0} atom transport process, the energy relaxation of the H{sup 0} atoms, which affects the surface H{sup -} ion production rate, is taken into account. The result indicates that the surface H{sup -} ion production is enhanced near the high-electron-temperature region where H{sup 0} atom production is localized.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Acceleration of ampere class H{sup -} ion beam by MeV accelerator

The H{sup -} ion accelerator R and D to realize the international thermonuclear experimental reactor neutral beam is ongoing at Japan Atomic Energy Agency (JAEA). The required performance for the prototype MeV accelerator developed at JAEA is 1 MeV, 500 mA (current density of 200 A/m{sup 2}) H{sup -} ion beam at the beamlet divergence angle of less than 7 mrad. Up to 2005, 836 keV, 146 A/m{sup 2} H{sup -} ion beam was successfully accelerated as the highest record of the current density at MeV class energy beams. In the present work, high current negative ion beam acceleration test was performed by increasing the beam extraction apertures from 3x3 (9 apertures) to 3x5 (15 apertures). By fixing the air leak at the source chamber due to backstream ions as well as the improvement of voltage holding capability by a new fiber reinforced plastic insulator ring, the performance of the MeV accelerator was improved. So far, H{sup -} ion beam of 320 mA was successfully accelerated up to 796 keV with the beam divergence angle of 5.5 mrad. The accelerated drain current including the electron reaches close to the power supply limit for the MeV test facility. The heat flux by the backstream ion during the above beam acceleration was estimated to be 360 W/cm{sup 2}. The Cs leakage to the accelerator during the test campaign (Cs total input of 5.0 g) was 0.26 mg (7.0 {mu}g/cm{sup 2}). This is considered to be the allowable level from the viewpoint of voltage holding.

43 PARTICLE ACCELERATORS↗

Uniform H{sup -} ion beam extraction in a large negative ion source with a tent-shaped magnetic filter

Based on previous studies on the spatial uniformity of the negative ion beam, the external magnetic filter was replaced to a novel tent-shaped magnetic filter in the JAEA 10 A negative ion source. The line-cusp field configuration on the source chamber was also changed to form a symmetric magnetic field like many of positive ion sources aiming at high proton yield. This magnetic field configuration allows fast electrons emitted from filament cathodes to rotate azimuthally inside the source chamber. The source configuration thus prevents localization of fast electrons due to their Bxgrad B drift in the filter field. As a result, the H{sup -} ion beam profile extracted from a wide region of 340x170 mm{sup 2} showed reduction of standard deviation from 16% in the original to 7.9% with the tent filter. The negative ion source with the tent filter satisfied the requirement of the beam uniformity for a large negative ion source in the ITER neutral beam injection.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Negative ion production in cesium seeded high electron temperature plasmas

In experiments on uniformity improvement in a large negative ion source, steep gradients have been observed in the profiles of electron temperature and H{sup -} ion beam intensity. It has been observed that the gradient in the H{sup -} ion beam intensity is altered by seeding cesium, though the electron temperature distribution is not affected by Cs. Thus in the Cs seeded condition, the H{sup -} ion beam intensity is enhanced in local area illuminated by high electron temperature plasmas. A brief analysis suggests possible advantages of high electron temperature plasmas for the negative ion surface production, by enhancement of dissociation to yield proton or atoms as parent particles of the negative ions.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗