The CMS Phase II Outer Tracker Upgrade at Fermilab
The Large Hadron Collider (LHC) will be upgraded to increase the instantaneous luminosity up to 5−7.5×10 34 cm −2 s −1 . To face these challenging conditions the CMS tracking system must be updated, using modules that on the one hand are able to cope with high radiations and on the other hand can provide information to the L-1 trigger selection. This report describes the results of some tests on the new tracking modules at the FNAL test beam facility. In particular half of one module was irradiated by 400 MeV protons (total fluence comparable to the one expected through the lifetime of the experiment) and then some analysis were performed on both the irradiated and not irradiated side of the detector with a 120 GeV proton beam. In this report, the efficiency and noise occupancy analysis are presented, with focus on the main critical issues encountered.